Deployment

Section titled “Docker Compose (recommended for evaluation)”

The fastest way to get TruePPM running. A single command starts all six services.

Terminal window
git clone git@gitlab.com:trueppm/trueppm.git
cd trueppm
docker compose up -d
ServicePortPurpose
db127.0.0.1:5432PostgreSQL 16. Bound to loopback, so only clients on this machine can reach it.
valkey—Celery broker + Django Channels layer (Valkey — BSD-licensed Redis fork, wire-compatible). Reachable only on the Compose network — the dev stack publishes no host port for it.
api8000Django ASGI (uvicorn)
celery—CPM auto-scheduling worker
celery-beat—Periodic task runner (Beat)
web5173React frontend (Vite dev server)

Migrations and the create_admin bootstrap run automatically when the api container starts. Retrieve the generated admin password as described in Admin password setup:

Terminal window
docker compose exec api cat /tmp/trueppm_admin_password

Good for: local development, evaluation, demos.

This stack is now booted in CI, not just rendered and grepped: a compose:dev job (#4026) runs on every change to docker-compose.yml or the api/web Dockerfiles, plus a nightly schedule. It builds the api/web images from the commit under test — the dev build target is a different path from the runtime image the Helm/Compose-prod drills use, so this is the only CI job that exercises it — then confirms db, valkey, and api reach healthy (which doubles as proving migrations completed), that the bootstrapped admin password actually authenticates, that the Vite dev server serves the SPA on :5173, and that both celery and celery-beat are genuinely dispatching work rather than merely running. What it does not cover: multi-developer contention, sustained load, or any topology other than the single-machine one docker compose up -d gives you.

Not for shared or production use, even a small team. This stack hardcodes POSTGRES_PASSWORD: trueppm in the tracked compose file (and, until 0.5, the Django SECRET_KEY dev-secret-key-change-in-prod), and it publishes PostgreSQL, the API (:8000) and the web server (:5173) on the host. The API and web ports bind to 127.0.0.1 by default; setting TRUEPPM_DEV_BIND_ADDR=0.0.0.0 publishes them on every interface, so do that only on an isolated host, never on a shared network.

The PostgreSQL port binds to 127.0.0.1 as of 0.4. Before 0.4 it published on 0.0.0.0, reachable from the network with that password — and Docker’s published ports bypass most host firewalls, because the DOCKER chain is consulted before INPUT. For anything more than one developer’s machine, use the single-server production stack below or the Helm chart.

Public read-only demo (docker-compose.demo.yml)

Section titled “Public read-only demo (docker-compose.demo.yml)”

docker-compose.demo.yml is a separate, hardened stack for a public hosted demo (the mechanism behind try.trueppm.com, which went live with 0.4, the first beta) — not the dev stack above. It seeds the sample without persona logins. The seeded accounts carry unusable passwords, so nobody can sign in, and DemoReadOnlyMiddleware refuses every write request under /api/ whatever the caller’s authentication. The only way in is the product’s own anonymous, tokenized, read-only schedule share link.

In 0.4 the stack bakes a demo SECRET_KEY. The read-only middleware plus the reverse-proxy allowlist below are what keep that safe, so the demo’s reverse proxy (nginx/demo.conf.template) treats the API surface as an explicit allowlist, not a blanket proxy. From 0.5 the stack will generate per-install secrets on first start instead of shipping a shared key. Only these routes reach the API container from the public internet:

Public routeWhy it is open
GET /api/v1/share/{schedule,board}/<token>/The anonymous, read-only, throttled share-link projections — the demo’s only data plane.
GET /api/v1/health/Liveness probe for an upstream load balancer / ingress.
/static/Django-collected static assets (admin CSS, etc.).
/admin/Django admin — closed unconditionally by nginx’s own deny all, which returns 403 before the request ever reaches the api container; the request never gets a chance to hit Django at all. Even a direct connection to api would find no account that can sign in (the seeded accounts carry unusable passwords), and this stack runs without TRUEPPM_DJANGO_ADMIN_ENABLED.

Every other /api/ route — auth/token and the rest of the auth surface, every project viewset, the Admin-only share-link management endpoints, workspace SSO, and the OpenAPI schema/docs — returns 404, as does the live-collaboration WebSocket (/ws/), which the read-only share pages never open. The authenticated API is simply not there from the public internet.

This posture is a deliberate decision, not an accident of configuration: a CI gate (scripts/check-demo-nginx-allowlist.sh) fails the pipeline if the demo template ever regresses to proxying anything beyond this allowlist. Production (nginx/app-http.conf.template) intentionally proxies all of /api/ — correct there, because production is authenticated and has real accounts.

That static gate proves the template declares the right routes; a compose:demo job (#4026) additionally BOOTS this stack — on every change to docker-compose.demo.yml or nginx/demo.conf.template, plus a nightly schedule — and confirms api-init and demo-seed each exit cleanly, that the share URL demo-seed prints actually renders through nginx, that the underlying share API answers with no authentication, and that every route in the table above behaves exactly as documented — including the 403 on /admin/, which is a live boot assertion rather than a read of the config: this page previously described that route as answering 404, which was true of Django but not of what a client actually receives, since nginx’s deny all never lets the request reach Django at all. The drill runs against images retagged from the commit under test, not pulled from GHCR, so a compose- or nginx-template change lands against HEAD application code rather than the last release. It does not drill the edge WAF and challenge rules or the try.trueppm.com edge — those sit in front of this stack, not inside it.

The Helm chart in packages/helm/ deploys TruePPM on any Kubernetes cluster (kind, k3s, EKS, GKE, AKS, or bare-metal) with bundled sub-charts for PostgreSQL and Valkey (the BSD-licensed Linux Foundation fork of Redis; wire-compatible). The bundled datastores are intended for dev / demo / CI; for production, disable them and point at managed services (see below). For a diagram of what the chart deploys, see Deployment Topology.

To install, follow the production install walkthrough below. It works for an evaluation cluster too: the app will not start until you create its Secret, so no install path skips that step.

Separate values-dev.yaml and values-prod.yaml overlays are provided. values-dev.yaml is for local development against images you have built and side-loaded yourself (for example kind load docker-image). It sets image.pullPolicy: Never, so on any other cluster the pods fail with ErrImageNeverPull. Do not use it to install a published release. values-prod.yaml is a commented template, not a working configuration: it carries every key you must supply present-but-empty, and the render fails with a named error rather than installing something that neither routes nor encrypts. The chart README is the full value reference.

Version floor. The chart declares kubeVersion: ">= 1.23.0-0", so helm install refuses an older cluster with a version message instead of applying and failing with an opaque “no matches for kind”. 1.23 is the real floor — the highest GA API the chart renders is autoscaling/v2 (GA 1.23); batch/v1 CronJob and policy/v1 PodDisruptionBudget are both 1.21. The 1.27 recommended above is a support-policy preference, not a technical requirement. Any Helm 3.2+ has the lookup function the chart’s password helpers use; there is no 3.14-specific dependency.

Good for: production deployment, horizontal scaling, enterprise environments.

For preliminary hardware sizing guidance at 50 / 100 / 200 users, see Deployment Sizing.

Running on OpenShift? See OpenShift Deployment for the restricted-v2 SCC override, Ingress→Route behavior, and what does not work yet (the bundled dev/demo postgresql/valkey subcharts) — everything else on this page applies unchanged.

Prerequisites: Helm 3.14+, kubectl compatible with your cluster, and a running Kubernetes cluster 1.27+.

Get the chart. Since the 0.4 beta the chart is published to a public OCI registry, so no clone is needed:

Terminal window
helm install trueppm oci://ghcr.io/trueppm/charts/trueppm --version <version>

<version> is the release version without a leading v; the current tag is on the Releases page. The chart version is the release version, and its default image tag is that same version prefixed with v, pulled from the GitLab Container Registry (see Image tags differ by registry). Pass --version for anything you intend to keep. Without it Helm installs the newest stable chart and skips pre-release versions; --devel includes them.

To install from the chart source instead, clone the repository:

Terminal window
git clone https://gitlab.com/trueppm/trueppm.git
cd trueppm
helm dependency update packages/helm

The rest of this walkthrough works with either source.

Get the production values template. Download it next to where you will keep your own values file. You pass both files to helm install, and Helm deep-merges them: your my-values.yaml (written below) overrides the template key by key, so you never edit the template itself:

Terminal window
curl -sL https://gitlab.com/trueppm/trueppm/-/raw/main/packages/helm/values-prod.yaml \
-o values-prod.yaml

If you install a pinned chart version, download the template from that release’s tag rather than main (replace main in the URL with v<version>).

Create the application Secret. TruePPM validates four values at startup and refuses to boot without them — the pod crash-loops in the migrate init container before the API ever runs, so this is not an optional hardening step:

KeyWhat it is
SECRET_KEYDjango signing key, 32 characters minimum
ALLOWED_HOSTSComma-separated hostnames the app will answer on — see the callout below, it must cover more than your public name
INTEGRATION_ENCRYPTION_KEYFernet key that encrypts integration credentials at rest
TRUEPPM_ALLOW_LOCAL_ATTACHMENT_STORAGE or TRUEPPM_DEFAULT_FILE_STORAGE + TRUEPPM_S3_BUCKET_NAMEWhere task attachments are stored

Create the namespace first. The Secret has to exist in it before the install, and kubectl create secret does not create a namespace for you:

Terminal window
kubectl create namespace trueppm
kubectl create secret generic trueppm-env --namespace trueppm \
--from-literal=SECRET_KEY="$(openssl rand -base64 48)" \
--from-literal=ALLOWED_HOSTS=trueppm.example.com,trueppm-api,localhost,127.0.0.1 \
--from-literal=INTEGRATION_ENCRYPTION_KEY="$(python3 -c \
'import base64,os;print(base64.urlsafe_b64encode(os.urandom(32)).decode())')" \
--from-literal=TRUEPPM_ALLOW_LOCAL_ATTACHMENT_STORAGE=true

TRUEPPM_ALLOW_LOCAL_ATTACHMENT_STORAGE=true puts task attachments on local disk. The pods run with a read-only root filesystem, so it needs a volume to write to. The values file below sets persistence.media.enabled: true for that reason; without it the API refuses to start. The default access mode is ReadWriteMany, and it is required whenever more than one api pod runs (as it does with values-prod.yaml’s replicaCount: 2), because a ReadWriteOnce claim binds to one node and the api, worker, and beat pods all mount it. Only on a single-node evaluation cluster running one replica can you use persistence.media.accessMode: ReadWriteOnce. See attachment storage.

It is a reasonable choice for a first install you are evaluating and the wrong one for anything you intend to keep on a multi-node cluster — swap it for the S3 pair when you are ready (see object storage).

values-prod.yaml already disables the bundled datastores. That means the chart requires env.DATABASE_URL and env.REDIS_URL, and fails the render if either is missing. Store both URLs in their own Secrets:

Terminal window
kubectl create secret generic trueppm-db --namespace trueppm \
--from-literal=url='postgres://trueppm:<password>@<host>:5432/trueppm?sslmode=require'
kubectl create secret generic trueppm-cache --namespace trueppm \
--from-literal=url='redis://:<password>@<host>:6379'

sslmode=require is mandatory. TruePPM refuses to boot on a database URL that does not ask for TLS; see Managed (external) datastores for the one exception.

Then create my-values.yaml containing at least the following:

# my-values.yaml (layered on top of values-prod.yaml at install time)
# Point the chart at the Secret created above. This reaches the API, the Celery
# worker, AND the migrate/bootstrap init containers — all of which import the
# same settings module and so hit the same startup checks.
envFrom:
- secretRef:
name: trueppm-env
# The managed datastores. These MUST be set under env: in the secretKeyRef
# form shown here (or as plain URL strings). The chart checks for them at render
# time and does not read the envFrom Secret above.
env:
DATABASE_URL:
secretKeyRef:
name: trueppm-db
key: url
REDIS_URL:
secretKeyRef:
name: trueppm-cache
key: url
# Required when the Secret sets TRUEPPM_ALLOW_LOCAL_ATTACHMENT_STORAGE=true.
# Omit it if you configured S3 storage instead.
persistence:
media:
enabled: true

values-prod.yaml also enables the Ingress and leaves its host, the public URLs (env.TRUEPPM_FRONTEND_BASE_URL, env.TRUEPPM_PUBLIC_API_BASE_URL), and env.CSRF_TRUSTED_ORIGINS empty. Set them in my-values.yaml too, alongside the env: keys above; see Ingress and edge TLS.

ingress.hosts is a list, and Helm replaces a list wholesale rather than merging it — setting only ingress.hosts[0].host in my-values.yaml drops the /api, /ws, and / paths that values-prod.yaml ships, not just the host (templates/ingress.yaml renders zero paths for a host with none). Repeat the whole block, with service: keys, instead of overriding the host alone:

ingress:
className: nginx
hosts:
- host: trueppm.example.com
paths:
- path: /api
pathType: Prefix
service: api
- path: /ws
pathType: Prefix
service: api
- path: /
pathType: Prefix
service: web
tls:
- secretName: trueppm-tls
hosts:
- trueppm.example.com

Evaluating on a cluster with no managed database? Skip values-prod.yaml and the two datastore Secrets, and use a values file that holds only the envFrom: and persistence: blocks above, with accessMode: ReadWriteOnce added under persistence.media on a single-node cluster. The chart then runs its bundled PostgreSQL and Valkey. Leave postgresql.auth.password and valkey.auth.password empty; see Secure by default below for what the chart generates for you. The chart also satisfies the database-TLS check for you on that path, so the bundled install needs no DATABASE_URL. This is the configuration CI installs on every chart change (see Verifying a deploy).

Install:

Terminal window
helm install trueppm oci://ghcr.io/trueppm/charts/trueppm --version <version> \
--namespace trueppm \
-f values-prod.yaml -f my-values.yaml

From a clone, use packages/helm in place of the oci://… reference and --version. For the bundled-datastore evaluation install, pass only -f my-values.yaml.

If anything required is still missing, the install’s own output says so: the chart’s post-install notes name the exact keys the app will refuse to start without, and helm upgrade --reuse-values fixes it without a reinstall.

Keep secrets in Kubernetes Secrets rather than in my-values.yaml or --set: values files get committed and --set lands in shell history. That is why the datastore URLs above are secretKeyRef references and not plain strings. Adding DATABASE_URL or REDIS_URL as keys of trueppm-env does not work: the chart checks env.DATABASE_URL at render time and sets that variable explicitly on every pod, so a value arriving through envFrom would be both rejected by the render and overridden by the chart’s own value.

Post-install. Migrations run automatically in an init container. The generated admin password is written on exactly one API pod — whichever bootstrapped first — so read it from each pod in turn rather than from deployment/trueppm-api, which picks an arbitrary pod and at replicaCount: 2 misses the file about half the time:

Terminal window
for pod in $(kubectl get pods -n trueppm -o name \
-l app.kubernetes.io/instance=trueppm,app.kubernetes.io/component=api); do
kubectl exec -n trueppm "$pod" -c api -- cat /run/trueppm/admin_password 2>/dev/null \
&& echo "(from $pod)"
done

It prints one password. If it prints nothing, the pod that held the file has restarted since install and the file is gone for good — reset the password instead, as described in Admin password setup.

When using the bundled PostgreSQL, retrieve the generated database password from the chart-owned connection Secret:

Terminal window
kubectl get secret trueppm-trueppm-connection -n trueppm \
-o jsonpath='{.data.POSTGRES_PASSWORD}' | base64 -d

Verify:

Terminal window
kubectl get pods -n trueppm
# All pods should be Running / Completed

Since the 0.4 beta, every image and chart published to GHCR is signed with Cosign keyless (Sigstore) in CI, Trivy-scanned, and CycloneDX SBOM-attested — so you can confirm an artifact was built by the TruePPM release pipeline before you run it. The one exception was chart 0.4.0 from the first beta cut, which was unsigned and has been removed; every chart published since verifies. On GHCR <version> is the bare version (the current tag is on the Releases page). Verify against the GitLab CI OIDC issuer and the release-tag identity:

Terminal window
# API and web images (repeat for web) — signature, verified on the tag
cosign verify \
--certificate-identity-regexp '^https://gitlab.com/trueppm/trueppm//.gitlab-ci.yml@refs/tags/v.*$' \
--certificate-oidc-issuer https://gitlab.com \
ghcr.io/trueppm/api:<version>
# CycloneDX SBOM attestation — verify against the per-platform digest, not the tag
DIGEST=$(docker buildx imagetools inspect ghcr.io/trueppm/api:<version> --raw \
| jq -r '.manifests[] | select(.platform.os=="linux" and .platform.architecture=="amd64") | .digest')
cosign verify-attestation --type cyclonedx \
--certificate-identity-regexp '^https://gitlab.com/trueppm/trueppm//.gitlab-ci.yml@refs/tags/v.*$' \
--certificate-oidc-issuer https://gitlab.com \
ghcr.io/trueppm/api@"$DIGEST"
# Helm OCI chart
cosign verify \
--certificate-identity-regexp '^https://gitlab.com/trueppm/trueppm//.gitlab-ci.yml@refs/tags/v.*$' \
--certificate-oidc-issuer https://gitlab.com \
ghcr.io/trueppm/charts/trueppm:<version>

A verified signature proves the image came from a TruePPM release tag; the attestation lets you pull the exact CycloneDX SBOM for that digest.

The signature is on the multi-arch manifest list, so cosign verify works against the tag. The SBOM attestation is different: a manifest list has no filesystem and therefore no packages, so the attestation is attached to each per-platform image digest (linux/amd64 and linux/arm64), not to the list. cosign verify-attestation against a tag looks for an attestation on the tag’s own digest and finds none, which is why the example above resolves the platform digest first. Use architecture=="arm64" to verify the arm64 image.

web:0.4.0-beta.4 was published without its CycloneDX attestation (its tag pipeline failed at the attest step), and a tag pipeline cannot be re-run from a fixed CI file. Its attestation is added afterwards by the manual release:backfill-sbom-attestation job, which regenerates the SBOM from each published platform digest with the pinned Syft and attests it keyless. That job runs on main, not on the release tag, so its certificate identity ends in @refs/heads/main instead of @refs/tags/v... and the tag-only regexp above does not match it. Verify a backfilled digest with:

Terminal window
cosign verify-attestation --type cyclonedx \
--certificate-identity 'https://gitlab.com/trueppm/trueppm//.gitlab-ci.yml@refs/heads/main' \
--certificate-oidc-issuer https://gitlab.com \
ghcr.io/trueppm/web@<platform-digest>

Maintainers: play the job from a main pipeline, set BACKFILL_IMAGE and BACKFILL_TAG, then note the backfill (attestation time versus tag time) on that tag’s Release page. Locally, scripts/backfill-sbom-attestation.sh --image web --tag <version> --dry-run resolves the digests read-only; the script refuses to attest outside GitLab CI.

A default install needs no extra security flags. The chart:

  • Generates the PostgreSQL and Valkey passwords on first install and stores them in a chart-owned connection Secret (<release>-trueppm-connection, annotated helm.sh/resource-policy: keep). Re-renders read the existing password back rather than churning it, and the Secret survives helm uninstall so a reinstall does not orphan the database PVC.
  • Injects DATABASE_URL / REDIS_URL via secretKeyRef — they are never rendered into a Deployment manifest in plaintext.
  • Enables cache authentication by default (valkey.auth.enabled: true).
  • Runs the API, Celery worker, Celery beat, and web pods with a restricted security context (readOnlyRootFilesystem, dropped capabilities, RuntimeDefault seccomp, runAsNonRoot) and automountServiceAccountToken: false, with default resource requests/limits.
  • Enables a default-on NetworkPolicy (networkPolicy.enabled: true) that limits datastore ingress to the API and worker pods and applies default-deny egress to the bundled datastore pods. This requires a NetworkPolicy-enforcing CNI (Calico, Cilium, Antrea, Weave, …); on a cluster whose CNI does not enforce policy the objects are accepted but silently unenforced.

Retrieve the generated database password:

Terminal window
kubectl get secret <release>-trueppm-connection \
-o jsonpath='{.data.POSTGRES_PASSWORD}' | base64 -d

See Security for the full operator reference.

The chart ships a chart-managed Ingress template, off by default because the correct ingress class, hostnames, and certificate source are cluster-specific. Enable it and supply your host(s) and a TLS Secret to expose TruePPM over HTTPS at the edge. Each host’s paths route by their service: key: /api and /ws go to the Django API Service, and / goes to the nginx web Service (the compiled React SPA). Both Services stay ClusterIP; the Ingress is the sole externally-facing object and the TLS termination point. When the web tier is disabled (web.enabled=false), a service: web path falls back to the API.

Both values.yaml’s default ingress.hosts and values-prod.yaml’s own ingress.hosts already encode the /api, /ws → API and / → web split, so a typical install only overrides the host, class, and TLS Secret. This is not automatic when you supply your own ingress.hosts instead: Helm deep-merges maps across -f files, but a list value such as ingress.hosts is replaced wholesale, not merged, so layering a values file (or a --set-json) that defines its own hosts discards the whole three-path split, not just the host — repeat all three paths and their service: keys in your override, or the overlay you supply will route everything, including /, to whichever service: a path with none of its own defaults to (api). Because values-prod.yaml disables the bundled datastores, the command also has to supply env.DATABASE_URL and env.REDIS_URL, or the render fails. The placeholders below stand in for the URLs (or the secretKeyRef form from the walkthrough above):

Terminal window
helm install trueppm packages/helm \
-f packages/helm/values-prod.yaml \
--set env.DATABASE_URL='postgres://trueppm:<password>@<host>:5432/trueppm?sslmode=require' \
--set env.REDIS_URL='redis://:<password>@<host>:6379' \
--set ingress.enabled=true \
--set ingress.className=nginx \
--set ingress.hosts[0].host=trueppm.example.com \
--set ingress.hosts[0].paths[0].path=/api \
--set ingress.hosts[0].paths[0].service=api \
--set ingress.hosts[0].paths[1].path=/ws \
--set ingress.hosts[0].paths[1].service=api \
--set ingress.hosts[0].paths[2].path=/ \
--set ingress.hosts[0].paths[2].service=web \
--set ingress.tls[0].secretName=trueppm-tls \
--set ingress.tls[0].hosts[0]=trueppm.example.com

For anything beyond a single host it is far cleaner to set ingress.hosts in a values file than to enumerate paths on the command line.

With cert-manager, add the issuer under ingress.annotations (cert-manager.io/cluster-issuer: <issuer>) and cert-manager provisions the named TLS Secret automatically — Networking has a complete ClusterIssuer for both HTTP-01 and DNS-01, the paired annotations, and a kubectl create secret tls path for a certificate you already hold. Add the WebSocket timeout annotations from WebSockets behind a proxy at the same time. Leaving ingress.tls empty renders an HTTP-only Ingress — acceptable only for a dev/demo cluster, never production. settings.prod already trusts X-Forwarded-Proto (SECURE_PROXY_SSL_HEADER), so the app sets secure cookies and HSTS correctly behind edge TLS; the /api/v1/health/ and /api/v1/edition/ probe paths stay exempt from the optional HTTP→HTTPS redirect.

The bundled PostgreSQL and Valkey pods speak plaintext on the pod network — the chart-built DATABASE_URL carries no sslmode. This is safe only because the default-on NetworkPolicy isolates those pods so that just the API and worker can reach them. To keep that posture coherent, the chart automatically sets TRUEPPM_ALLOW_UNENCRYPTED_DB=true only when the bundled database is in use and the NetworkPolicy is enabled — so a default helm install boots without crash-looping the app’s DB-encryption guard, and without any operator ever being told to “disable the security check.”

For production, use managed datastores with TLS instead (below). When postgresql.enabled=false, the chart injects no auto flag, so your env.DATABASE_URL must include sslmode=require — the app refuses to boot on a plaintext external database.

When postgresql.auth.password / valkey.auth.password are empty, the chart generates a strong random password on first install and keeps it in the chart-owned connection Secret, which carries helm.sh/resource-policy: keep so an accidental helm uninstall cannot orphan the database PVC behind a lost credential.

On a re-render the chart reads the existing password back with Helm’s lookup function, so helm upgrade never churns it. lookup only works when Helm is talking to a live cluster. It returns an empty result during helm template, helm install --dry-run, and helm diff — and in that case the chart falls through to generating a new password:

Terminal window
# Three renders of the same chart with the same values:
for i in 1 2 3; do
helm template trueppm packages/helm | grep POSTGRES_PASSWORD
done
# → three different passwords

That matters if you deploy through a renderer rather than through Helm itself. Argo CD renders manifests with helm template, so with the bundled datastores and an empty password, every sync mints a new credential, overwrites the Secret, and leaves the PostgreSQL StatefulSet’s PVC holding the old one. The API then fails to authenticate against its own database, and nothing in the error names the cause.

Two supported postures:

  • Production — use managed datastores. values-prod.yaml already sets postgresql.enabled: false and valkey.enabled: false, so no password is generated and the question does not arise. This is the recommended path regardless of how you deploy.
  • Dev/demo under GitOps — set the passwords explicitly. Supply postgresql.auth.password and valkey.auth.password from your secret manager (External Secrets, Sealed Secrets, SOPS). The chart honors an explicit value verbatim and never generates, so renders become deterministic.

helm install and helm upgrade are unaffected — they reach the cluster, find the kept Secret, and read the existing password back.

For production, disable the bundled subcharts and point at managed services. When postgresql.enabled / valkey.enabled are false, env.DATABASE_URL and env.REDIS_URL become required — the chart fails the render with a clear message if either is missing. (Setting either one while the matching bundled datastore is still enabled also fails the render: the chart-built URL always wins, so your value would be silently ignored.) Managed Redis services (AWS ElastiCache, GCP Memorystore, Azure Cache, etc.) work via the redis:// scheme.

Prefer a Secret you manage. Referencing one keeps the credential out of Helm altogether — out of your values file, your shell history, and the Helm release Secret. The chart wires every consumer (API, worker, beat, the migrate and bootstrap init containers, the backup CronJob) straight at your Secret:

Terminal window
kubectl create secret generic trueppm-db \
--from-literal=url='postgres://user:pass@your-db:5432/trueppm?sslmode=require'
kubectl create secret generic trueppm-cache \
--from-literal=url='redis://:pass@your-cache:6379'
values-my-prod.yaml
env:
DATABASE_URL:
secretKeyRef:
name: trueppm-db
key: url
REDIS_URL:
secretKeyRef:
name: trueppm-cache
key: url
Terminal window
helm install trueppm packages/helm \
-f packages/helm/values-prod.yaml -f values-my-prod.yaml

A plain URL string also works. The chart stores it in the chart-owned connection Secret and injects it from there, so it never reaches a Deployment manifest — but it passed through Helm, so it persists wherever it was held (the values file, --set in shell history, the Helm release Secret):

Terminal window
helm install trueppm packages/helm \
-f packages/helm/values-prod.yaml \
--set env.DATABASE_URL="postgres://user:pass@your-db:5432/trueppm?sslmode=require" \
--set env.REDIS_URL="redis://:pass@your-cache:6379"

The sslmode=require parameter is mandatory on an external DATABASE_URL: settings.prod refuses to boot without it (database connections would otherwise fall back to whatever the server negotiates, which may be plaintext). If — and only if — TLS is already enforced between the app and database at the network layer (a service-mesh sidecar or a private encrypted link), set env.TRUEPPM_ALLOW_UNENCRYPTED_DB=true to acknowledge that and downgrade the guard to a warning.

Prefer injecting DATABASE_URL / REDIS_URL via an external Secret rather than --set so they don’t land in shell history. SECRET_KEY and ALLOWED_HOSTS must always be supplied via a Kubernetes Secret referenced through env.

Workload tiers, probes, and disruption budgets

Section titled “Workload tiers, probes, and disruption budgets”

The chart renders four workload tiers: the API, the Celery worker, a single-replica Celery beat scheduler, and the web SPA (nginx). Beat runs exactly one replica with a Recreate strategy — it is the one process that fires the periodic drains, so two overlapping beats would double-dispatch every job.

Health probes ship on every tier and are value-tunable under probes.*:

  • The API readiness probe points at the deep /api/v1/readyz check (it also verifies the database and cache are reachable), so a pod only joins the Service once it can actually serve; liveness stays on the shallow /api/v1/health/ so a transient dependency blip cannot restart-loop the pod.
  • The worker’s liveness and beat’s only probe use a celery inspect ping exec probe — a control-plane round-trip that catches a wedged event loop a bare process-alive check would miss. The worker’s startup and readiness probes do not: from 0.4 they stat a heartbeat file a Celery signal handler touches on its own load-independent timer, specifically because an exec probe that does real work runs inside the container it measures and can fail a worker that is busy doing its job rather than actually broken. See Startup, Readiness, and Liveness Probes for the full breakdown per component.

For multi-replica production the chart also ships an optional PodDisruptionBudget (podDisruptionBudget.enabled=true, api + worker) and an optional HorizontalPodAutoscaler (autoscaling.enabled=true, api by default, worker optional). Both are off by default: the PDB is only meaningful at replicaCount >= 2, and the HPA needs metrics-server installed. These, along with the beat and web tiers, the probe hardening, the DJANGO_LOG_LEVEL and OTLP trace-sampler knobs, and the starter Grafana dashboard / Prometheus alerts, shipped in 0.4 (the first beta).

After helm install (or helm upgrade), confirm the release actually booted end to end — that the migrate → bootstrap init sequence completed, the supplied secrets satisfied the settings.prod boot guards, and the API is serving:

Terminal window
helm test trueppm

This runs a bundled connection probe (a short-lived Pod, created only by helm test and never during a normal install) that reaches the API’s /api/v1/health/ and migration-aware /api/v1/readyz endpoints and fails if either is unreachable within the rollout window. (For an external load balancer’s own health check, point it at /api/v1/readyz — note the missing trailing slash — and set the Host header; see Health checks.) A green helm test is the single strongest signal that the whole boot chain succeeded. Retrieve the generated admin password with kubectl exec against the shared password volume as described in Admin password setup.

An install-and-helm test drill runs in CI on every chart change and on a nightly schedule, across five legs, each installing a different configuration on a fresh kind cluster:

LegConfigurationNamespace
helm:installBundled PostgreSQL/Valkey, chart defaults + persistence.media (ReadWriteOnce)default
helm:upgradeInstalls the previous published chart at replicaCount=2, then helm upgrades it to HEAD in place — the migration-ordering / advisory-lock path a single replica can never exercisedefault
helm:demoThe public read-only demo overlay (values-demo.yaml)default
helm:demo-upgradeInstalls the previous published chart WITH the demo overlay, then helm upgrades it to HEAD still with the demo overlay, without --wait — the combination that exercises the demo-seed Job’s post-upgrade hook re-fire concurrently with the rolling-update version-skew window, which neither helm:upgrade nor helm:demo alone ever runs, polling an in-cluster probe pod against the web Service for mixed old-build/new-build asset serving during that window. Both sides of the upgrade force the web tier to 3 replicas — the demo overlay’s own pin of 1 (correct for the real demo, see values-demo.yaml) would leave only one pod per generation and never exercise an overlapping rollout at all, so the drill asserts directly that more than one old AND more than one new web pod were Ready at the same time at least oncedefault
helm:walkthroughThis page’s production walkthrough, followed step for step: a named trueppm namespace, values-prod.yaml + the my-values.yaml shown above, bundled datastores disabled, and a managed PostgreSQL (TLS on, sslmode=require) + Valkey reached the documented env.*.secretKeyRef waytrueppm

helm:demo-upgrade is the one leg that does not run on every MR — it pays for both an install and an upgrade on top of the demo overlay’s own cost, so it runs on pushes to main and on the nightly schedule only.

All five run helm test, retrieve the admin password (helm:walkthrough via the per-pod loop shown above, asserting exactly one API pod holds the file), assert the Celery worker answers a control-plane ping, and check Celery beat is a Running, non-restarting singleton. A static gate (helm:template) runs alongside them: it renders the chart, validates every object against the Kubernetes schema with kubeconform, and asserts the deploy contract (init-container order, secret propagation to the init containers, the shared admin-password volume). scripts/check-helm-walkthrough-drift.py (docs:helm-walkthrough-drift) checks the helm:walkthrough leg’s commands — namespace/Secret order, the datastore-URL secretKeyRef shape, Secret names, ALLOWED_HOSTS — stay identical to this page’s own fenced code blocks, so the drill and the doc cannot silently diverge again the way they did before #4025.

Be precise about what every leg relaxes for shared CI runners, regardless of configuration: the Celery worker’s liveness probe is off and the beat probe is widened (scripts/helm-install-drill.sh’s CELERY_PROBE_OVERRIDES, needed on every leg including helm:walkthrough — the chart’s own probe defaults are unchanged by this, and self-hosted production runs them unmodified). No leg runs a real Ingress controller; helm:walkthrough sets ingress.hosts[0].host to a resolvable placeholder purely so the API’s readiness probe gets a Host header (see the ALLOWED_HOSTS callout above) — it does not exercise Ingress and edge TLS end to end.

For production on a single Linux server without Kubernetes. Uses the pre-built release images with Docker Compose, managed by systemd so the stack restarts with the machine.

Prerequisites:

  • A Linux server (Ubuntu 22.04+ or Debian 12+)
  • Docker 24+ and Docker Compose plugin
  • A domain name with an A (and optionally AAAA) record pointing at the server’s public IP, resolving before you run init-prod.sh — ACME HTTP-01 validation needs it. See DNS.
  • Inbound ports 80 and 443 open, plus the outbound rules in Ports and firewall

Steps:

Terminal window
git clone https://gitlab.com/trueppm/trueppm.git
cd trueppm
cp .env.example .env

Generate the three random values .env needs. .env is read as plain KEY=value text, so a $(...) written inside it is not run; it becomes the literal value. Run these in your shell and paste each output into the file:

Terminal window
python3 -c "import secrets; print('DB_PASSWORD=' + secrets.token_urlsafe(24))"
python3 -c "import secrets; print('REDIS_PASSWORD=' + secrets.token_urlsafe(24))"
# A Fernet key: 32 random bytes, URL-safe base64. Standard library only.
python3 -c "import base64, os; print('INTEGRATION_ENCRYPTION_KEY=' + base64.urlsafe_b64encode(os.urandom(32)).decode())"

Then edit .env and fill in all required values:

Terminal window
# Required minimums — see .env.example for full list
DOMAIN=trueppm.example.com
TLS_MODE=letsencrypt
CERTBOT_EMAIL=ops@example.com
# SECRET_KEY is left EMPTY here on purpose — init-prod.sh generates one and
# writes it back to .env. Set it yourself only if you want to control the value;
# it refuses any documented placeholder either way.
SECRET_KEY=
DB_PASSWORD=<paste the generated value>
REDIS_PASSWORD=<paste the generated value>
# Encrypts stored integration credentials at rest. The API refuses to start
# without it, so this is required even if you never connect an integration.
INTEGRATION_ENCRYPTION_KEY=<paste the generated value>
# Attachment storage — the API refuses to start until you choose one.
# (a) Recommended: object storage, which survives container replacement.
TRUEPPM_DEFAULT_FILE_STORAGE=storages.backends.s3.S3Storage
TRUEPPM_S3_BUCKET_NAME=trueppm-attachments
# (b) Local disk instead — see the warning below before choosing this.
# TRUEPPM_ALLOW_LOCAL_ATTACHMENT_STORAGE=true
# Django admin. From 0.4 this stack answers 404 on /admin/ unless you set this,
# because the nginx in front of it proxies the API directly and there is no
# chart-managed allowlist to lean on. Leave it unset unless you have a reason.
# TRUEPPM_DJANGO_ADMIN_ENABLED=true
# The bare release version, no "v". Find the current tag on the Releases page:
# https://gitlab.com/trueppm/trueppm/-/releases
APP_VERSION=<version>

You do not need to set sslmode on a database URL here. The stack composes its own DATABASE_URL for the bundled PostgreSQL and sets TRUEPPM_ALLOW_UNENCRYPTED_DB=true alongside it, because that container publishes no host port and is reachable only over the private Compose bridge network. If you repoint the stack at an external database, remove that flag from the compose file and put ?sslmode=require on your own URL — the guard is what keeps a database hop across the network from falling back to plaintext.

Run the one-time setup (obtains a TLS certificate and starts the stack):

Terminal window
chmod +x init-prod.sh
./init-prod.sh

Retrieve the admin password:

Terminal window
docker compose -f docker-compose.prod.yml exec api \
cat /run/trueppm/admin_password

This path is drilled in CI with local-disk attachment storage and without a real ACME exchange; S3 storage and Let’s Encrypt issuance are not exercised. On any change to docker-compose.prod.yml, init-prod.sh, .env.example, or the nginx templates — plus a nightly schedule — a compose:prod job fills .env.example with generated values, runs init-prod.sh against images built from that commit, and fails the pipeline unless the API clears all three start-up guards, /api/v1/readyz reports ready through nginx, /api/v1/health/beat/ returns 200 (which proves the scheduler is genuinely dispatching, not merely declared), and the stack survives restarting the API container. It is the Compose counterpart to the helm:install drill described under Kubernetes with Helm.

A sibling compose:prod:tls job boots the same stack a second time with TLS_MODE=selfsigned, which is what puts the HTTPS nginx template — a different file from the plain-HTTP one, and previously started by nothing but a human on release day — under a real boot. On top of the checks above it asserts that HTTPS serves the app on 443, that port 80 redirects to it, that HSTS is set, and that /.well-known/acme-challenge/ is served from the webroot over plain HTTP rather than swallowed by the redirect. That last one is the contract certbot renew -a webroot depends on: break it and your certificate still issues, then quietly fails to renew about 60 days later.

What CI still cannot cover is the ACME exchange itself — the first --standalone issuance and the authenticator switch recorded in the renewal lineage both need a real domain. If you run TLS_MODE=letsencrypt, verify the first renewal manually rather than waiting for expiry to tell you:

Terminal window
docker compose -f docker-compose.prod.yml run --rm certbot \
renew --dry-run -a webroot --webroot-path=/var/www/certbot

systemd auto-start. Create /etc/systemd/system/trueppm.service:

[Unit]
Description=TruePPM
Requires=docker.service
After=docker.service network-online.target
[Service]
Type=oneshot
RemainAfterExit=yes
WorkingDirectory=/opt/trueppm
EnvironmentFile=/opt/trueppm/.env
ExecStart=/usr/bin/docker compose -f docker-compose.prod.yml up -d
ExecStop=/usr/bin/docker compose -f docker-compose.prod.yml down
TimeoutStartSec=120
[Install]
WantedBy=multi-user.target
Terminal window
sudo systemctl daemon-reload
sudo systemctl enable --now trueppm

Good for: production on a single box, no Kubernetes cluster available.

TruePPM runs as a set of cooperating services:

ServiceTechnologyPurpose
APIDjango 5.2 (ASGI via uvicorn)REST API, WebSocket connections, authentication
Celery workerCelery 5.4Background CPM scheduling, async task processing
Celery beatCelery 5.4 (Beat)Single-replica scheduler for periodic drains, retention purge, and the beat heartbeat
PostgreSQLPostgreSQL 16Primary data store, ltree WBS hierarchy
ValkeyValkey 8 (Redis-compatible)Celery task broker, Django Channels layer, scheduling locks
WebReact 19 (Vite build, served via nginx)Browser-based user interface

All services share the same Valkey instance. Celery-originated broadcasts (e.g., cpm_complete) reach WebSocket clients connected to any API container, making horizontal scaling of the API safe.

PostgreSQL is the only stateful service. Back up the trueppm database on your preferred schedule.

Valkey holds no authoritative data, so it is never restored from a backup — but whether it persists differs by artifact, and it is worth knowing which you run: the Helm sub-chart runs valkey-server --appendonly yes against a 2Gi PVC (~1 s broker RPO at the default appendfsync everysec), while docker-compose.prod.yml mounts /data as a tmpfs with no AOF and loses the queue on every container restart. Either way the work itself survives — fourteen outbox drains re-dispatch pending rows every 30 seconds and every task carries acks_late — and WebSocket connections simply drop and reconnect. See Durability & Redundancy.

TruePPM ships tested backup and restore scripts (scripts/backup.sh / scripts/restore.sh) and an opt-in Helm backup CronJob. See Backup & Restore for the full runbook: manual backups on Compose and Helm, restoring onto a fresh stack, what is and isn’t captured, and the restore-drill cadence.

Schema migrations run automatically on container start (manage.py migrate). The migration graph is linear and every schema change is reversible except two intentional one-way data migrations — reverting past them is a no-op, not a restore:

  • notifications.0004_clean_unknown_matrix_keys — strips invalid keys from notification-preference matrices. The dropped keys carried no meaning, so there is nothing to restore on reverse.

  • projects.0019_backfill_wbs_paths — backfills WBS ltree paths. The pre-backfill state was empty paths; reverse accepts that data loss.

  • projects.0148_task_unique_task_wbs_path_per_project_live — repairs duplicate WBS paths before adding the constraint that forbids them (see below). Reverse drops the constraint, which makes the old state legal again, but does not put the repaired rows back.

To roll back across any of these, restore the PostgreSQL backup taken before the upgrade rather than relying on migrate <app> <prior>. All other migrations reverse cleanly.

Upgrading to 0.4: duplicate WBS paths are repaired automatically

Section titled “Upgrading to 0.4: duplicate WBS paths are repaired automatically”

A task’s wbs_path is the only thing that records its place in the work breakdown; there is no parent_id column. Before 0.4 nothing stopped two live tasks in one project from being written to the same path, and several code paths did exactly that. 0.4 adds a database constraint that forbids it.

That constraint is validated against every existing row when it is created, so on a database that already holds a duplicate the upgrade would otherwise fail — and because migrations run on container start, it would fail on every restart.

So the migration repairs first, rather than refusing:

  • One row keeps the path: the one that reached the project’s write sequence earliest.
  • Every other row moves to the next free path among its own siblings — a duplicate at 4.2 becomes 4.9, not a new top-level item — so it stays inside the phase it was planned in.
  • Rows underneath a duplicated path do not move. A row at 4.2.1 is a child of “the 4.2 in this project”; when there were two of those, nothing in the data says which. The whole subtree stays with the row that kept the path.

Every move is logged at WARNING with the project, the task, and the old and new path. Capture the migration output on upgrade — it is the only record of what changed:

wbs_path repair (#3068): project=<uuid> task=<uuid> moved 4.2 -> 4.9 (kept task=<uuid>)

Most databases have no duplicates, and for those the step is a single query and a no-op. If the log shows moves, review the named tasks afterwards: their numbering changed, and if any of them owned a subtree, that subtree is now attached to the task that kept the original path.

One further note for large installs: the constraint is an EXCLUDE USING GIST, which PostgreSQL cannot build concurrently. It takes an ACCESS EXCLUSIVE lock on the task table for the duration of the index build, blocking reads as well as writes. Plan a maintenance window proportional to your task count.

The Celery worker runs CPM recalculation automatically after every task or dependency write. It uses a per-project Valkey lock to prevent redundant concurrent recalculations. If the lock is held, the task re-queues with a 10-second countdown.

Monitor the Celery worker logs for scheduling errors. If Valkey becomes unavailable, scheduling updates will queue and retry when the connection is restored.

In a single-pod deployment there is exactly one Celery Beat process driving every periodic drain. If it dies silently, async work stops accumulating signal. TruePPM exposes a heartbeat endpoint (GET /api/v1/health/beat/) so monitoring can detect a dead Beat. See Beat Liveness for how to wire it into Prometheus or Kubernetes.

The outbox and audit tables (schedule requests, imports, webhook deliveries, object history, task runs) are bounded by nightly purges. See Outbox & Record Retention for the tunable retention windows and how to disable a purge safely.

WebSocket connections authenticate with a short-lived, single-use ticket (?ticket=<ticket> on the connection URL), minted via POST /api/v1/ws/ticket/ — no JWT ever appears in the URL or access logs. The legacy ?token=<jwt> handshake is disabled by default and opt-in only via TRUEPPM_WS_LEGACY_TOKEN_AUTH_ENABLED (deprecated, removed next release). Viewers (role=1) are rejected with close code 4003. From 0.5 the handshake also validates the Origin header against ALLOWED_HOSTS and TRUEPPM_WS_ALLOWED_ORIGINS; a refused handshake gets an HTTP 403 on the upgrade, which a browser reports as close code 1006, so the client retries. Monitor the Django Channels logs for connection errors.