Unified data model

Most “hybrid” project management tools are two tools bolted together. TruePPM is not. Every view — Gantt, Board, Sprints, WBS, Schedule — reads and writes the same rows in the same database. There is no sync, no translation, no eventual consistency.

This page explains the data model that makes this possible.

Every item of work in TruePPM — a WBS phase, a deliverable task, a sprint story, a milestone — is a single Task row. The row carries fields that are relevant in different contexts, and different views surface different subsets of those fields.

Task
├── Identity
│ id UUID primary key
│ name string
│ wbs_path ltree (e.g. "1.2.3" — position in WBS hierarchy)
│ project FK → Project
├── Scheduling (CPM — Waterfall + Hybrid)
│ duration integer (working days)
│ planned_start date (PM's committed start — gates CPM early_start)
│ early_start date (CPM forward-pass output)
│ early_finish date (CPM forward-pass output)
│ late_start date (CPM backward-pass output)
│ late_finish date (CPM backward-pass output)
│ total_float integer (working days of schedule slack)
│ free_float integer
│ is_critical boolean (on the critical path)
│ is_milestone boolean (zero-duration gate event)
├── Monte Carlo (probabilistic forecasting)
│ optimistic_duration integer (3-point estimate, working days)
│ most_likely_duration integer
│ pessimistic_duration integer
├── Execution (Board — all methodologies)
│ status BACKLOG | NOT_STARTED | IN_PROGRESS | REVIEW | COMPLETE
│ assignee FK → User
│ percent_complete integer
│ actual_start date (auto-set on IN_PROGRESS transition)
│ actual_finish date (auto-set on COMPLETE transition)
├── Agile (Sprints — Agile + Hybrid)
│ sprint FK → Sprint (null = project backlog)
│ story_points integer (nullable — agile estimate)
│ remaining_points integer (live burndown signal)
└── Flags
is_milestone boolean (zero-duration gate)
is_subtask boolean (depth-1 checklist item, no independent schedule)
notes text

No methodology owns any field. A waterfall PM fills in duration and leaves story_points null. A scrum team fills in story_points and uses duration to let CPM compute a delivery date. A hybrid team fills in both — the PM owns duration and the team owns points — and both views stay live simultaneously.

Tasks are arranged into a tree using a PostgreSQL ltree column (wbs_path). A path of "1.2.3" means: first top-level phase → second child → third grandchild.

Project
└── 1 Phase: Discovery (duration auto-rolled up from children)
├── 1.1 Task: Stakeholder interviews
├── 1.2 Task: Requirements doc
└── 1.3 Milestone: Discovery sign-off
└── 2 Phase: Build
├── 2.1 Task: API design ← sprint FK set → Sprint 3
├── 2.2 Task: Frontend ← sprint FK set → Sprint 3
└── 2.3 Task: Integration test ← sprint FK set → Sprint 4
└── 3 Phase: Deploy

The same tree is the source for every view:

ViewReads from the WBS treeKey fields used
WBS / TableFull tree, indentedwbs_path, name, status, duration
Gantt / ScheduleCommitted tasks (non-BACKLOG)early_start, early_finish, total_float, is_critical, dependency edges
BoardNon-BACKLOG tasks, grouped by WBS phasestatus, assignee, sprint, story_points
SprintsTasks where sprint_id = current_sprintstory_points, remaining_points, status
OverviewAggregate rollupsburndown, velocity, CPM forecast, Monte Carlo P80

No data is copied between views. The Board’s phase lanes are WBS phases. The Gantt’s bars are the same rows the Board’s cards render. The sprint burndown reads remaining_points from the same rows the Gantt uses for float.

A waterfall PM works entirely with duration, planned_start, dependencies, and CPM output fields. The Board is still available but secondary. Story points are left null. Sprints are not created.

Typical waterfall task:
name: "Develop payment API"
duration: 10
planned_start: 2026-02-03
early_start: 2026-02-03 ← CPM output
early_finish: 2026-02-14 ← CPM output
total_float: 0 ← on the critical path
is_critical: true
sprint: null ← not sprint-managed
story_points: null ← not estimated in points
status: NOT_STARTED ← board column

The Gantt renders the bar from early_start/early_finish. The Board shows the task card in the NOT_STARTED column. Neither view requires any duplicate row.

An agile team works entirely with sprint, story_points, remaining_points, and status. The Gantt is hidden (via the Agile methodology preset). CPM is still computed in the background — duration defaults to 1 day for backlog items — but the team never looks at it. The WBS is flat or minimal.

Typical agile task ("story"):
name: "User can reset password"
duration: 1 ← default; CPM runs but results ignored
sprint: Sprint 4 ← sprint membership
story_points: 5 ← agile estimate
remaining_points: 3 ← updated daily by assignee
status: IN_PROGRESS
early_start: null or ignored by the team

The Board renders this as a card in the IN_PROGRESS column. The sprint burndown consumes remaining_points. No separate “agile database” exists.

A hybrid team uses both sets of fields on the same rows. The PM sets duration and planned_start; the team sets story_points. A task can live in Sprint 3 (agile planning) and also be on the critical path (CPM scheduling). The Monte Carlo engine uses optimistic_duration / most_likely_duration / pessimistic_duration to compute delivery confidence.

Typical hybrid task:
name: "Implement auth service"
duration: 8 ← PM's scheduling estimate
optimistic_duration: 5
most_likely_duration: 8
pessimistic_duration: 13
planned_start: 2026-03-10
early_start: 2026-03-10 ← CPM
total_float: 0 ← critical
sprint: Sprint 5 ← team's execution context
story_points: 13 ← team's complexity estimate
remaining_points: 8 ← current burndown
status: IN_PROGRESS

Raj sees a Gantt bar with float and critical-path colouring. Maya sees a sprint card with story points and remaining effort. They’re looking at the same database row. When Maya moves the card to COMPLETE, actual_finish is set, CPM re-runs, and Raj’s Gantt updates in real time via WebSocket — without either of them touching a sync button.

Most hybrid tools are integrations: Jira ↔ MS Project, Azure DevOps ↔ Project Online, Smartsheet ↔ Jira. These have three failure modes:

FailureIntegration toolTruePPM
Eventual inconsistency”Gantt is as of last sync, 4 hours ago”Same row — always live
Lossy translationEpic → Project task loses story points; Project task → Jira loses floatNo translation; both fields on the same row
Permission divergenceTom has Jira access; Sarah has Project access. Information leaks both ways.One RBAC check per request, one role per user per project

The data model is the integration. There is nothing to sync.

Setting a project to Waterfall, Agile, or Hybrid hides tabs in the UI — it does not change, migrate, or delete any data. A project can be switched from Agile to Hybrid and back without consequence. API routes are never gated by methodology; the preset is purely a UI signal.

See Methodology preset for the tab visibility matrix.