Retrospective panel
This is for a Scrum Master and team wrapping up a sprint together. It’s the retrospective surface where the team reflects on how the sprint went: a notes area for the discussion, plus a list of action items with optional story points — the team’s own size estimate for a piece of work, distinct from the schedule’s duration estimate. Each saved action item carries an explicit Promote to backlog button — promoting creates a real task in the project backlog, and the resulting task surfaces back as a T-XXX chip on the action item so you can see it was followed through on.
Where this lives in the story
Section titled “Where this lives in the story”Step 8 (Close — retro, lessons learned, baseline variance) of the hybrid PM flow. Closes the loop on Alex’s switching criterion: “Retro action items get logged and forgotten.”
What you see
Section titled “What you see”- Notes — free-text capture of the meeting summary
- Action items list — text + optional story points
- Save retro — upserts notes and applies your edits to the action items: edited items keep their identity (and their promotion link), removed items are deleted, and new items are added; saving never promotes anything
- Promote to backlog — an explicit per-item action; the created task lands in the project backlog (
BACKLOG, no sprint) → T-XXXXXXchip — appears next to action items whosepromoted_task_idis set- Prior retro — a context section showing the most recent prior completed sprint’s retro, so last sprint’s lessons are in view while you write this one
- Visibility toggle — the retro author or a Project Manager can switch
team_visibilitybetween team-only and project-wide
Live retro board
Section titled “Live retro board”The single-author notes-and-action-items panel above grows a real-time, multi-writer board where the whole team adds, edits, and drags sticky notes during the live ceremony — seeing each other’s input as it happens rather than refreshing to catch up. This board surface (ADR-0117) was added in 0.3.
- Three columns — What went well, What to improve, Ideas & discussion.
- Concurrent editing — every team member adds and edits stickies at once; updates fan out over the existing project WebSocket (
retro_item_created/_updated/_moved/_deleted), and presence shows who is in the retro. Concurrency is last-write-wins per sticky; a superseded edit is offered back via an undo, never silently lost. - Convert to action item — one click turns a discussion sticky into a retro action item, which then uses the same explicit Promote to backlog flow below. Discussion → action → backlog is one continuous path.
- Editable window — the board is live while the sprint is Active and stays editable after close (Completed); a Canceled sprint’s board is read-only.
The action items, notes, and visibility toggle described elsewhere on this page are sections within this board surface — the promote-to-backlog behavior is unchanged.
Team-health pulse
Section titled “Team-health pulse”A one-tap mood / energy / (optional) confidence pulse answered during the retro, with a trend across sprints (ADR-0117 / ADR-0104). The pulse was added in 0.3.
- One tap per dimension — a re-tap updates your answer; there is no submit button.
- Trend — per-sprint averages with a response count, and an early-warning flag when team energy falls two sprints running.
- Team-private by default — the pulse trend is governed by the same signal-privacy posture as team velocity (see Velocity): visible to the team and their coach only. The PM/PMO band sees nothing — not a redacted aggregate, not a response count — until the team explicitly shares it upward, and there is no cross-team or PMO rollup. Cross-team mood aggregation is an enterprise-edition concern, intentionally not built in the community edition.
Visibility model
Section titled “Visibility model”Each retro has a team_visibility setting (ADR-0071):
- Team only (default) — members with at least the Team Member role see the full retro. Viewers receive a counts-only summary (number of action items, number promoted) — never the raw notes or item text.
- Project — every project member, including Viewers, sees the full retro.
Changing visibility is gated to the retro’s creator or a Project Manager and above; lower roles get 403.
Where to find it in the app
Section titled “Where to find it in the app”- Route:
/projects/:projectId/sprints(panel below the timeline / backlog) - Renders for the active sprint, falling through to the most-recent closed sprint when no active sprint exists.
API endpoints
Section titled “API endpoints”| Method | Endpoint | Purpose |
|---|---|---|
GET | /api/v1/sprints/{id}/retro/ | Current retro, visibility-aware (404 if none; counts-only summary below the visibility threshold) |
POST | /api/v1/sprints/{id}/retro/ | Upsert notes + apply the action item list as a diff (never promotes) |
PATCH | /api/v1/sprints/{id}/retro/ | Update team_visibility (creator or Project Manager+) |
GET | /api/v1/sprints/{id}/retrospective/prior/ | Most recent prior completed sprint’s retro (404 if none) |
POST | /api/v1/sprints/{id}/retrospective/action-items/{itemId}/promote/ | Promote one action item into the project backlog |
POST | /api/v1/sprints/{id}/retrospective/action-items/{itemId}/pull-to-sprint/ | Atomically promote + assign an item to a planned sprint (Resource Manager+) |
IsProjectMember for read; IsProjectMemberWrite for write. promoted_task_id is read-only — only the promote endpoints set it.
Saving action items
Section titled “Saving action items”POST .../retro/ takes notes, optional team_visibility, and an action_items list. Each entry is {id?, text, assignee?, story_points?}, and the list is applied against the retro’s current items rather than replacing them:
- An entry with
idedits that existing item in place. Its id,created_at, andpromoted_task_idare kept. Only the fields the entry carries change, so leaving outassigneeorstory_pointskeeps the stored value.textis required on every entry that has anid; leaving it out returns 400. - An entry without
idcreates a new item. - An item that the list no longer names, or that is sent with blank
text, is deleted. The deletion is a soft delete, so offline clients receive it as a tombstone on their next sync pull. - An entry whose
idnames an item this retro already deleted creates a new item with a new id. This happens when a teammate removed the item while your draft was still open, and it keeps your text instead of failing your save. The deleted item is not restored. - Re-saving an unchanged list writes nothing to the action items.
story_pointsmust be a whole number from 0 to 32767, ornull.
Any other id returns 400: an item on another retro, an id that names no action item, a malformed id, or the same id twice in one request. An invalid story_points or an id entry without text also returns 400. Nothing is saved when a request is refused.
The retro panel keeps the item ids it gets back from each save. Items a teammate adds while your panel is open, including stickies converted to action items, are added to your list, so your next save does not delete them. An item a teammate removed leaves your list too, unless you have edited it since your last save. The panel rounds story points to whole numbers, and when a save is refused it shows the server’s reason.
Promotion semantics
Section titled “Promotion semantics”Promotion is explicit, per item — saving the retro never creates tasks (sprint sovereignty per ADR-0071).
- Promote creates a task with name = the action item text, the item’s story points, and unconditionally
status = BACKLOGwith no sprint — the request body cannot smuggle asprint_id. The created task’s UUID is recorded on the item’spromoted_task_id, so subsequent reads render the link chip. Promoting an already-promoted item returns 409 with the existingtask_id(safe to retry). - Pull to sprint is the only path that puts a retro action item directly into a sprint: it atomically promotes the item and assigns the task to a target sprint in the same project. The target must be in the Planned state, and the caller needs the Resource Manager role or above.
Related ADRs
Section titled “Related ADRs”- ADR-0071 — Retro visibility, explicit promotion, and carryover (supersedes the original auto-promote design from issue #231)
If you are…
Section titled “If you are…”- Alex — own this. Action items you promote become real backlog tasks; items you don’t will be forgotten by Friday. The prior-retro section keeps last sprint’s lessons in view.
- Priya (engineer) — promoted action items show up in the project backlog; your Scrum Master or PM pulls them into a planned sprint when the team commits to them.