Project notifications

The Project Settings → Notifications page controls how a single project’s events reach you. Every project member owns their own copy of this page: the toggles you set apply only to your account on this project, and there is no admin surface for editing another member’s routing. Open it at Project → Settings → Notifications.

The page has three parts:

  1. A pause-all kill-switch that silences every notification for you on this project.
  2. An event × channel matrix — one toggle per (event, channel) pair.
  3. A quiet-hours window that holds back transient interruptions overnight.

The matrix has one row per event. These are the events a project can notify you about:

EventFires whenDelivered today
Mention (@) in a commentSomeone @-mentions you (or a group you belong to) in a commentYes
Task assigned to meA task is assigned to youNot yet
Task I own is overdueA task you own passes its planned date without completingNot yet
Task moves to another columnA task changes status / board columnNot yet
Budget threshold crossedA project budget threshold is exceededNot yet
Risk created or escalatedA risk is created or its severity escalatesNot yet
Milestone reachedA milestone is reachedNot yet
Sprint startedA sprint is activatedNot yet
Sprint closedA sprint is closedNot yet

“Not yet” means exactly that: nothing dispatches these eight events, so no notification is sent for them on any channel, whatever their toggles say. The page marks each one not delivered yet, and the API reports it as a server fact so the label can never drift from the truth. Your setting is still saved and will apply once the event is wired up — you do not need to come back and re-enable it.

The “Fires when” column above describes what each event will mean once it is delivered, not something happening today. Only Mention (@) in a comment is routed by this matrix right now.

Each event can be routed to four channels:

ChannelNotes
In-appThe notification inbox in the app. This is a durable record — see Quiet hours for why it behaves differently.
EmailSent as an email. Email also depends on your workspace-level preference — see Relationship to your personal preferences.
SlackNot delivered yet. TruePPM has no Slack notification delivery, and no setting anywhere enables it — a toggle here records your intent for when it ships. To get project events into Slack today, add a Slack-format webhook: a project-wide feed with its own event list, which does not read this matrix.
Mobile pushNot delivered yet. TruePPM has no push delivery, and no device setting enables it — a toggle here records your intent for when it ships.

A toggle in the matrix records your intent to be notified. It is not a guarantee of arrival: a cell delivers only when its event is dispatched and its channel delivers. Turning on the Slack column has no effect on any row, and there is nothing you can do about that from Integrations or anywhere else — TruePPM has no Slack notification delivery to enable. From 0.4 the API reports which columns deliver, in the channel_delivery field, so the page’s labels can never drift from what the server actually does.

When you first open the page, the matrix is seeded with defaults rather than everything-on. An event defaults on only if it is actually delivered — a default of “on” is a promise that something will arrive, and TruePPM will not make that promise for an event it does not yet dispatch.

EventIn-appEmailSlackMobile push
Mention (@) in a commentononoffoff
Task assigned to meoffoffoffoff
Task I own is overdueoffoffoffoff
Task moves to another columnoffoffoffoff
Budget threshold crossedoffoffoffoff
Risk created or escalatedoffoffoffoff
Milestone reachedoffoffoffoff
Sprint startedoffoffoffoff
Sprint closedoffoffoffoff

The mention row is the one event TruePPM delivers, and it still defaults off for Slack and mobile push — being dispatched does not make a channel that sends nothing deliver. Each cell returns to a sensible on/off default in the same release that wires up the missing half.

If you have used TruePPM before 0.4, whatever you had stored is kept as-is — including a Slack or mobile-push toggle you already had on. These defaults apply to a preference row the first time it is created, not to one you already have, and nothing rewrites a choice you made. From 0.4 the column is labeled not delivered yet either way, so a stored on no longer reads as a promise.

Defaults are applied lazily the first time you open the page — there is no per-member backfill when you join a project. If TruePPM adds a new event type later, your saved preferences are merged with the new defaults on read, so a row that predates the new event still routes correctly.

Quiet hours hold back transient interruptions during a daily window — every channel except the in-app inbox. In practice that means email, and only email: Slack and mobile push are held back by the window too, but nothing delivers on them in the first place. Quiet hours are enabled by default, from 20:00 to 07:00 in the project’s timezone.

In-app notifications are deliberately exempt from quiet hours. The in-app inbox row is the notification: suppressing it would lose the event outright rather than defer a ping. So during quiet hours the durable in-app record is always written, and only the transient channels are silenced. This mirrors how Slack and GitHub do-not-disturb behave — the record persists, only the interruption is held back.

A zero-width window (from equals until) means “no quiet hours”.

The window resolves top-down and stops at the first usable value:

  1. the project’s own Timezone (Project → Settings → General), when it sets one;
  2. the workspace Default timezone;
  3. the server’s Django TIME_ZONE;
  4. UTC.

An unparseable value at any tier falls through to the next one rather than resetting the window to UTC.

You do not have to work the chain out yourself. From 0.4 the Quiet hours card states the answer under the From and Until selects, and names the scope that decided it — which is what tells you who to ask to change it:

What the page saysWhat it means
Times are in <zone> — this project’s timezone.The project sets its own Timezone (Project → Settings → General).
Times are in <zone> — the workspace default timezone. This project sets no usable timezone of its own.The project inherits. A workspace admin changes it under Workspace → Settings → General.
Times are in <zone> — the server default. Neither this project nor the workspace sets a usable timezone.The chain fell past both scopes you can edit. Nobody can fix this from the app — see the degradation note below.
Times are in <zone> — no project, workspace, or server timezone could be read.Nothing in the chain was usable, so the window falls back to UTC.

The line is a read-only statement of fact, not a control — quiet hours are a project policy, so there is no per-member timezone to pick here.

The same answer is on the API. GET /api/v1/projects/<id>/notification-preferences/ returns it alongside the window:

FieldMeaning
quiet_hours_timezoneThe IANA zone quiet_hours_from / quiet_hours_until are actually read in, e.g. "Asia/Tokyo".
quiet_hours_timezone_sourceWhich tier decided it: project, workspace, server, or fallback.

In normal operation you will only ever see project or workspace. The workspace row is created on first access with a timezone already set, and the API rejects a blank one, so tiers 3 and 4 are degradation signals: server means no workspace row exists yet (a brand-new install), and fallback means every tier was unusable — the server timezone included. Seeing either on an established install is worth investigating.

Both are read-only — PATCHing them is ignored. They exist because the winning tier is not derivable from the stored values: a project and a workspace set to the same zone are indistinguishable from outside, and re-implementing the chain client-side means keeping four tiers across three models in sync.

The window is half-open — it includes the from time and excludes the until time — and it correctly wraps past midnight when the from time is later than the until time.

Worked example with the default 20:00 → 07:00 window:

  • 22:30 is inside the window (after 20:00) → transient notifications are held.
  • 03:00 is inside the window (before 07:00) → transient notifications are held.
  • 07:00 is outside the window (the end is excluded) → notifications resume.
  • 12:00 is outside the window → notifications fire normally.

If you instead set a same-day window such as 09:00 → 17:00 (from earlier than until, no wrap), only times between 09:00 and 17:00 are quiet.

The Pause all notifications switch at the top of the page is a one-click opt-out from every notification on this project, on every channel, regardless of the matrix. It is useful while you are still dialing in your routing.

Your matrix is preserved while paused — pausing does not clear your toggles. Unpausing restores your previous preferences exactly.

This page is project-scoped and orthogonal to your workspace-level notification preferences, which live under Me → Settings → Notifications. The workspace-level preferences are a per-user, per-event-type channel toggle for the global @-mention inbox feed (the inbox that surfaces mentions across every project you belong to).

The two interact for email on comment mentions. A comment mention emails you only when both are true:

  1. The project matrix has the Email cell on for Mention (@) in a comment (and it is outside quiet hours), and
  2. Your workspace-level mention-email preference is on.

The in-app inbox row for a mention, by contrast, is governed by the project matrix alone. This lets you keep mention emails off globally while still routing other project events to email per-project.

Can a project admin change my notifications for me? No. Each member owns their own routing. There is no admin surface to edit another member’s preferences — by design, “each user owns their notification contract.”

Why does the in-app inbox still show a notification during quiet hours? Because the in-app row is a durable record, not a transient ping. Quiet hours silence every other channel — today that is email, since Slack and mobile push deliver nothing to silence. Dropping the in-app row would lose the event entirely.

I turned on the Slack column but nothing arrives in Slack. Nothing is delivered on the Slack channel yet. TruePPM has no Slack notification delivery and there is no setting that enables it, so there is nothing you can configure to make this work today — your toggle is saved and applies once delivery ships. If you want project events in Slack now, add a Slack-format webhook under Project Settings → Integrations. That is a project-wide feed on its own event list; it does not read this matrix and is not per-person routing.

Do my preferences carry over to other projects? No. This page is per-project. Joining another project starts you on that project’s default matrix. Your workspace-level mention preferences (Me → Settings → Notifications) are the only cross-project notification settings.

What is the API behind this page? GET and PATCH /api/v1/projects/{project_id}/notification-preferences/. Any project member may read and update their own preferences. A PATCH accepts a partial matrix — toggling one cell does not require reposting the whole grid.