Skip to content

Broadcast and webhook delivery pipeline

WebSocket event conventions documents the event-type naming rule, the envelope, and the frozen-contract guarantee for real-time broadcasts — read that first if you haven’t. This page covers what that one doesn’t: how a broadcast is actually dispatched under the hood, how the same underlying event becomes a signed, retried, eventually-dead-lettered outbound webhook, and why “a webhook delivery failed” and “a Celery task was dead-lettered” are two different systems in this codebase, not one.

The broadcast call: durable-first, delivery best-effort

Section titled “The broadcast call: durable-first, delivery best-effort”

broadcast_board_event() is the single function every mutation calls to push a change to connected clients. Its contract is asymmetric on purpose: the event is durable, but its delivery is best-effort.

  1. It first writes a BoardEvent row — a bounded, per-project buffer — unless the event type is on a short denylist of high-frequency, pointless-to-replay events (presence pings, task-run progress ticks). This durable write happens before anything is pushed anywhere.
  2. It then sends the envelope directly to the Channels layer’s group — channel_layer.group_send() against Valkey pub/sub. This is not routed through Celery; it is a direct, synchronous call from whatever request or worker triggered the mutation.
  3. If no channel layer is configured, or the send fails, the function logs and returns — it never raises. A client that missed the live push is expected to notice a gap (via the seq mechanism WebSocket event conventions describes) and reconcile by re-pulling, not to be guaranteed the push arrived.

The reason this asymmetry is safe: every event that matters for reconciliation is already durable in BoardEvent (or, for the sync-cursor-relevant models, in the row’s own sync_seq) before the broadcast is even attempted. A dropped WebSocket push is a staleness problem with a bounded fix — reconnect and replay, or worst case, a resync_required full refetch — never a data-loss problem.

Every call site must be deferred with transaction.on_commit(), so a broadcast never fires for a mutation the database transaction goes on to roll back. This is enforced socially rather than mechanically: there is no lint rule or AST check that blocks an undeferred call from merging. What actually keeps this discipline intact is two things working together — the broadcast-check review gate that runs on every write-path change, and a periodic manual audit of every on_commit call site in the codebase that classifies each one as durably outbox-protected or deliberately best-effort. The one thing that is mechanically enforced is a narrower, adjacent property: a CI test AST-scans the source for every literal event-type string passed to broadcast_board_event() and asserts it against a hand-maintained frozen set — guarding the wire contract WebSocket event conventions describes, not the on_commit discipline itself.

The row broadcast_board_event() writes is deliberately minimal infrastructure — a plain (non-VersionedModel) table, never synced to a mobile client, existing purely so a client that missed a live push can ask for “everything after sequence N.” The wire seq is a per-project counter (ADR-1285, #4386). It is drawn from the project’s BoardEventSequence row in the same transaction as the event’s INSERT, and committed before the group_send. That row stays locked until the event commits, so each project’s sequence is dense and in commit order. The consumer can then prove a replay is complete by counting rows. That row is separate from the Project row, which sync uploads hold locked for a whole batch, so a broadcast does not queue behind a sync upload to allocate. It is not fully independent of the project row, though. The INSERT’s deferred foreign-key check takes FOR KEY SHARE on the project at COMMIT. That conflicts with the plain select_for_update() some domain transactions take on Project. A broadcast committing while one of those runs waits for it, holding its counter lock, so other broadcasts on that project wait too. It cannot deadlock: those transactions never touch the counter row. Until #4386 the table’s global primary key was the seq. The next frame on a project was then almost never last + 1, and the gaps revealed instance-wide event volume.

A nightly job purges rows older than TRUEPPM_BOARD_EVENT_RETENTION_HOURS (default 24 hours). This buffer is treated as internal transport plumbing, not an operator-tunable durability setting the way the webhook retention window below is — the assumption is that any client gone longer than a day falls back to a full resync rather than a replay, so there is little reason to make the window configurable.

Outbound webhooks: the same commit hook, a different destination

Section titled “Outbound webhooks: the same commit hook, a different destination”

Webhook dispatch (dispatch_webhooks()) is called from the same transaction.on_commit() sites that already call broadcast_board_event() — by design, so a new mutation that wants both a live push and a webhook does not need two separate wiring points. It fans out to both project-scoped and program-scoped subscriptions in one query, renders the payload per subscriber according to that subscription’s chosen format (a plain pass-through shape by default, a Slack-attachment shape for Slack subscribers, extensible for future formats without an OSS schema migration), and — this is the part that matters for durability — writes a WebhookDelivery row before ever attempting to send anything. That row is the outbox: it exists whether or not the subsequent Celery dispatch succeeds, so a broker outage at the exact moment of dispatch loses nothing but time.

Every delivered body is HMAC-SHA256 signed over its exact serialized bytes, using a secret unique to that webhook subscription, carried in an X-TruePPM-Signature: sha256=<hex> header. A receiver verifies by recomputing the same HMAC over the raw body it received and comparing in constant time — the full verification recipe is in Webhooks. Signing happens once, at send time, against the exact payload stored in the outbox row — not re-rendered on each retry — so what a receiver’s signature check validates is provably identical to what was durably recorded, which matters for anyone treating the delivery log as an audit trail.

A delivery attempt that fails — network error, non-2xx response — is retried up to five times with exponential backoff (30s, 60s, 120s, 240s, 480s). Retry counting is tracked against the delivery row’s own attempt count, checked before the task ever asks Celery to retry, rather than against Celery’s own retry-exhaustion machinery — the task manages its own terminal state (FAILED, after the fifth attempt) and returns cleanly rather than letting Celery’s max_retries machinery raise on its behalf. Two failure classes are treated differently: a private or unroutable destination URL fails the delivery permanently with no retry (see the SSRF re-check below); a DNS resolution hiccup or connection error is treated as transient and retried normally.

The delivery request itself is made through a redirect-disabled HTTP client, a deliberate hardening step: a receiver could otherwise return a 307/308 redirect pointed at an internal address, and if the client silently followed it, a signed payload — and the outbound request making it — would land somewhere the original destination validation never covered. Refusing to follow the redirect closes that window; the delivery simply surfaces the redirect response as a failure instead.

The destination is re-validated at delivery time, not only at registration time. An admin-configured webhook URL is user-supplied input, and the same SSRF guard Auth architecture describes for OIDC egress applies here — re-checked on every delivery attempt. That pre-flight is advisory: a name can resolve differently between the check and the connection, so the delivery opener also re-checks the address the socket actually connected to, which closes the DNS-rebinding window for direct egress (behind a configured proxy only the pre-flight applies).

The drain: recovering from a lost dispatch

Section titled “The drain: recovering from a lost dispatch”

The one gap the outbox row doesn’t close by itself is the moment between “the row was written” and “the Celery task was actually accepted by the broker.” If the broker is unreachable at that exact instant, the row is written, marked pending, and nothing dispatches it — until a periodic drain task, running every 30 seconds, finds any WebhookDelivery row that is still pending with zero delivery attempts and old enough to be considered orphaned, and re-dispatches it. This is what makes the outbox pattern actually durable rather than durable-in-the-common-case: the row surviving a broker outage is only useful if something eventually notices it and tries again.

Only terminal deliveries (SUCCESS or FAILED) are purged, on an operator-configurable retention window — unlike the BoardEvent buffer above, this window is meant to be tuned, because a webhook delivery log is something an operator may want to keep considerably longer for audit purposes. A PENDING row is never purged, since the drain task above may still need it.

Two different “dead letter” concepts — don’t conflate them

Section titled “Two different “dead letter” concepts — don’t conflate them”

A permanently failed webhook delivery (WebhookDelivery.status = FAILED after five exhausted retries) is not the same event, and does not feed the same system, as the platform’s generic Celery task dead-letter mechanism described in Dead-letter alerting. That system — a FailedTask row, a structured log line, a signal Enterprise can hook for off-box alerting, and a Prometheus gauge on /api/v1/health/dead-letter/ — is wired from exactly one place today: the scheduling engine’s own recompute task, on exhausted retries. A webhook that fails all five attempts becomes a row in its own table, visible through its own per-webhook delivery-history endpoint, and nowhere else — it does not fire the dead-letter signal, does not appear in the dead-letter gauge, and is invisible to the System Health dead-letter inspector.

This split is deliberate rather than an oversight to unify: the two failure domains have different audiences (a workspace admin debugging why their Slack integration went quiet vs. an operator watching for stuck background work generally) and different remediation paths (re-registering or fixing a webhook endpoint vs. requeuing or dropping a dead-lettered background job). But it is exactly the kind of thing a reader can reasonably assume is unified when it isn’t, so it’s worth stating plainly here: if you are building operator tooling around failure visibility, a webhook’s terminal failure needs its own instrumentation — it will not show up in the generic dead-letter surface.

  • WebSocket event conventions — the naming rule, envelope, reconnect-replay mechanism, and frozen-contract guarantee this page’s dispatch mechanism serves.
  • Webhooks — the subscriber-facing reference: the event catalog, payload shape, signature verification recipe, and delivery-history endpoint.
  • Dead-letter alerting — the generic Celery task dead-letter system this page explicitly distinguishes itself from.
  • Architecture Decision Records — ADR-0019 (outbound webhooks), ADR-0083 (format extension and the OSS event-count cap), ADR-0089 (the delivery sequence number in the body), ADR-0084 (the dead-letter alerting receiver), and ADR-0210 (dead-letter write actions — requeue and drop) are the primary records behind this page.