WebSocket event conventions
The real-time layer broadcasts board and schedule changes over WebSocket. It has been in place since 0.2; what this page documents is the convention every event follows and the frozen-contract guarantee that keeps the event surface stable for external consumers. The complete event list, the envelope, and the WebSocket ↔ webhook taxonomy live on the WebSocket API reference; this page is the explanation behind that reference — read it before adding a new event type.
The envelope
Section titled “The envelope”Every board event arrives as the same JSON envelope:
{ "protocol_version": 1, "event_type": "<name>", "payload": { ... }, "seq": 1234 }protocol_version is a bare integer identifying the wire version of the envelope
(currently 1). It is reserved so a future backward-incompatible envelope change
can be negotiated without breaking clients that ignore it today — clients that do
not read it are unaffected; future clients can branch on it. Bump it only on a
backward-incompatible envelope change, never for a new event_type.
payload is intentionally minimal — usually an id or a small id set. Treat
delivery as best-effort and refetch the affected resource on reconnect rather than
relying on having seen every event.
seq is the per-project replay sequence for a persisted (replayable) event, or
null for an ephemeral one (presence, task-run progress). It is additive — a
client that ignores it behaves exactly as before, so it does not bump
protocol_version — and it powers reconnect replay, below.
Reconnect replay & sequence numbers
Section titled “Reconnect replay & sequence numbers”Broadcast delivery is best-effort: an event sent while a client is disconnected is
lost. Rather than force a full refetch storm on every reconnect, each replayable
event is persisted to a bounded per-project buffer (BoardEvent) and stamped with
a per-project seq (ADR-0236, ADR-1285). The mechanism:
- Sequence — the
seqis a per-project, dense, commit-ordered counter (ADR-1285, #4386). It is drawn from the project’sBoardEventSequencerow in the same transaction as the event’s INSERT. That row stays locked until the event commits, so within one project the committed values are1, 2, 3, …with no holes, in commit order. A rolled-back event returns its value. Until #4386 theseqwas the buffer’s global row id. Other projects’ traffic interleaved it, so the next frame on a project was almost neverlast + 1. The client dropped an out-of-order delivery as a duplicate, and the gap between frames revealed instance-wide event volume. - What is buffered — every mutation event, but not the high-frequency
ephemeral ones (
presence_*,task_run_*), which carryseq: nulland are pointless to replay. This is a denylist, so a newly-added mutation event is replayable by default. - Ordering on the client — dense allocation does not order delivery. Two
workers can commit 10 then 11 and still have 11’s
group_sendarrive first. The client keeps a contiguous cursor. It dropsseq <= cursoras a duplicate and appliescursor + 1immediately. It holds a frame that overtook its predecessor for a short window (SEQ_REORDER_WINDOW_MS,packages/web/src/hooks/wsSeqGate.ts). When the window expires, it applies the held frames in order rather than dropping them, and moves the cursor past the hole. That window is the bound: a predecessor arriving more than 750 ms late findsseq <= cursorand is dropped. A reconnect cannot recover it, because?since=starts above the hole. - Gap detection on the client — a hole that survives the window, on a cursor
that was already baselined, is a frame the channel layer dropped (an overfull
consumer inbox or an expired message). The client runs the same project-scoped
refetch as
resync_required, without moving the cursor. A hole is never reported for a fresh mount’s first frame, or for held frames discarded because the socket closed (the reconnect replays those). As a second safety net, the task list keeps polling every 120 s while the socket islive(30 s while it is down), so a socket that is open but silently dropping frames still self-heals (#2848). - The handshake — on reconnect the client opens the socket with
?since=<cursor>. The consumer reads the project’s head (its counter value). The client is owed exactlyhead - sinceevents, and the consumer streams them (each flagged"replayed": true) only when exactly that many rows survive. Replayed frames always precede live ones, and the client drops anyseqit has already applied, so replay is idempotent. - Gap fallback — the consumer sends a single
resync_requiredcontrol frame carrying{ "latest_seq": <head> }in four cases. The first is when some owed rows were purged (the buffer keepsTRUEPPM_BOARD_EVENT_RETENTION_HOURS, default 24h). The second is when the client is more than the replay cap behind. The third is whensinceis above the head, a value the project’s sequence never reached. The fourth is when the owed events would exceed the 4 MiB replay byte cap, since past that size the client is cheaper to resync than to stream. A global-id cursor from before #4386 also resyncs, through the same count check rather than an actual purge. The upgrade seeded every existing project’s counter at its highest old id plus 2³², so every pre-upgrade cursor is below the seed. It is owed more events than carry aseq(ADR-1285 §6). The client refetches its project-scoped caches and baselines its cursor tolatest_seq. Every value the consumer reads is scoped to the project.
resync_required is a consumer-emitted control frame, not a broadcast event —
it never passes through broadcast_board_event(), so it is deliberately not part
of FROZEN_WS_EVENT_TYPES.
Naming convention
Section titled “Naming convention”WebSocket event_type values follow one pattern:
<resource>_<past-tense-verb>— lowercasesnake_case, singular resource, past-tense verb.
Examples: task_created, task_updated, task_deleted, dependency_accepted,
baseline_activated, roster_changed, sprint_retro_updated,
task_run_started, slip_conflicts_updated. The task_run_* family
(task_run_started, task_run_completed, task_run_failed, task_run_cancelled)
follows the same rule with a two-word resource; task_run_progress is the exception
and is grandfathered below. New events
must conform to this shape.
Two deliberate qualifiers:
- Underscores, not dots. WebSocket events are
snake_case. Webhook events are dot-namespacednoun.verb(task.created) — a different transport with a different audience. The same domain event is thereforetask_createdover the WebSocket andtask.createdin a webhook payload. This is an intentional per-transport distinction, not drift; see the WebSocket ↔ webhook taxonomy. - A handful of shipped strings predate the rule. Bulk and collection events use
a plural or non-
<resource>_<verb>form —tasks_bulk_mutated,tasks_reordered,tasks_restructured,phases_reordered,backlog_reranked,risks_imported. Four more break the grammar in a different way:presence_joinandpresence_leave(present tense, not past; shipped in 0.2) andcpm_completeandcpm_error(no verb at all; shipped in 0.1). Three more shipped in 0.3 and break the grammar too:comment_created(no resource noun before the verb),flagged_for_backlog(no past-tense verb), andtask_run_progress(a noun, not a past-tense verb). These are grandfathered: they predate the rule, are part of the frozen contract, and will not be renamed mid-line. New events do not get the same latitude — conform to<resource>_<past-tense-verb>. The grandfathered strings are normalized only at the 1.0 wire-freeze, where a one-time breaking rename is acceptable.
The frozen contract
Section titled “The frozen contract”The set of WebSocket event-type strings is a public contract. 0.3 froze
the event-string surface, and the read-only MCP server shipped in 0.4 — along
with any external integrator that subscribes to the board channel — will bind to
that frozen set. Once a client builds against an event_type, renaming or removing
it is a breaking change.
Because the literals are scattered across broadcast_board_event() call sites
rather than centralized in an enum, a CI guard keeps them honest. The test
test_ws_event_type_set_is_frozen (in
packages/api/tests/apps/sync/test_broadcast.py) re-derives the live set by
AST-scanning the API source for every literal event_type passed to
broadcast_board_event() / abroadcast_board_event(), then asserts it equals the
hand-maintained FROZEN_WS_EVENT_TYPES frozenset. Adding or removing a broadcast
event without updating that set fails the build loudly.
Registering a new event
Section titled “Registering a new event”When a new mutation needs to broadcast, register the event in four places, in the same change:
- Emit a direct string literal at the
broadcast_board_event()/abroadcast_board_event()call site — not a variable — so the freeze guard registers it. The name must follow<resource>_<past-tense-verb>. - Add the literal to
FROZEN_WS_EVENT_TYPESinpackages/api/tests/apps/sync/test_broadcast.py. - Document it in the taxonomy on the WebSocket API reference, noting whether it has a webhook counterpart or is WS-only.
- Register a frontend handler in the project WebSocket hook under
packages/web/src. An event the backend fires that the frontend never handles is a silently dropped update; a handler that listens for an event nothing emits is dead code that masks the real name.
The broadcast-check agent runs through exactly this checklist for any write-path
change — including the wrapper-emitter case above — so a new event that misses one
of these steps is caught before merge.