Git-event automation
Git-event automation moves a task’s board card automatically when its linked pull/merge request changes state — so the board reflects delivery without anyone dragging cards. When a linked PR/MR opens, the card moves to Review; when it merges, the card moves to Complete (#1257, backend #329).
The receiver is off by default and project-scoped: each project has its own webhook URL and signing secret. It moves cards forward only and never bypasses your board’s WIP or permission rules.
Who can configure it
Section titled “Who can configure it”The Git-event automation section is Project Manager or above only. A Team Member never sees it. Configuration lives under Project → Settings → Integrations → Git-event automation.
The prerequisite: each task needs a link to its pull/merge request
Section titled “The prerequisite: each task needs a link to its pull/merge request”Automation moves a card only if some task in the project already carries the pull/merge request URL as a link. There is no branch-name convention, no commit trailer, and no search — matching is an exact URL comparison against the links saved on the project’s tasks. If no task links to the incoming PR/MR, the delivery verifies successfully, your provider shows a green check, and nothing moves.
Only links recognized as the same provider as the delivery are compared. A link to a self-hosted GitLab or GitHub Enterprise Server instance that was saved without a matching connected-account credential is stored as a generic link and does not move cards.
This is the single most common reason a correctly configured webhook appears to do nothing, so do it first:
- Open the task on the board or in the schedule.
- In the task drawer, go to Files → External links.
- Paste the pull/merge request URL and save it.
A few things worth knowing:
- The link must point at the pull/merge request itself
(
https://github.com/acme/api/pull/5,https://gitlab.com/acme/api/-/merge_requests/7) — not at a branch, a commit, or an issue. - One link per task per PR/MR is enough. The comparison ignores host casing and the usual URL noise, but it is still the same pull/merge request that has to be named.
- Add the link before the pull request opens if you want the open event to move the card. A delivery that arrives with no link is not replayed — you can re-send it from your provider’s webhook page after adding the link, or just move the card by hand that once.
Set it up
Section titled “Set it up”- Link the task to its pull/merge request (above). Without this nothing moves.
- Open Project → Settings → Integrations. In the Git-event automation section, turn the toggle on. It is off by default — cards only move while it is on.
- Copy the webhook URL. It is unique to this project.
- Click Generate secret. The signing secret is shown once — copy it immediately. It can’t be retrieved again; if you lose it, rotate to issue a new one.
- Add the webhook in your Git provider (see below), pasting in the URL and the secret.
If automation is on but no secret is set, the receiver rejects every webhook until you generate one — the settings page warns you when this is the case.
GitHub
Section titled “GitHub”In the repository’s Settings → Webhooks → Add webhook:
- Payload URL — the webhook URL you copied
- Content type —
application/json - Secret — the generated secret
- Which events — Let me select individual events → Pull requests
GitLab
Section titled “GitLab”In the project’s Settings → Webhooks:
- URL — the webhook URL you copied
- Secret token — the generated secret
- Trigger — Merge request events
Draft pull/merge requests do not move the card
Section titled “Draft pull/merge requests do not move the card”A draft pull request (GitHub) or draft / work-in-progress merge request (GitLab) that opens leaves the card exactly where it is. Opening a draft to run CI is not a request for review, and because automation only ever moves cards forward, a card promoted by mistake cannot be walked back by a later event.
The card moves to Review when the pull/merge request is marked ready for review. A merge always completes the card, draft flag or not.
Check what happened to a delivery
Section titled “Check what happened to a delivery”The Last delivery row in the Git-event automation section reports what the receiver did with the most recent webhook it received for this project — the outcome, the provider, and when it arrived. It is the place to look when cards are not moving, because most failures are invisible from your provider’s side: the provider shows a green check for anything the receiver accepted, including “verified, but no task links to this pull request”.
What the outcomes mean:
| Last delivery says | What happened | What to do |
|---|---|---|
| Card moved to Review / Complete | Working as intended. | Nothing. |
| Card already at or past the target | Forward-only: the card was already there. | Nothing. |
| No task is linked to that pull/merge request | The delivery verified, but nothing matched. | Add the PR/MR URL to the task (see the prerequisite above). |
| Draft pull/merge request ignored | Deliberate — a draft does not promote. | Mark the pull/merge request ready for review. |
| Signature rejected | The secret in your provider does not match this project. | Rotate the secret and paste the new value into the webhook. |
| Delivery arrived while automation was off | The toggle is off. | Turn it on. |
| Delivery arrived with no secret set | Automation is on but unsecured. | Generate a secret and paste it into your provider. |
| Unrecognized provider | The request carried neither a GitHub nor a GitLab event header. | Check you pasted the URL into a Git provider’s webhook settings. |
| Stored secret could not be read | The encryption key changed since the secret was stored. | Rotate the secret, then update your provider. |
| No webhook delivery received yet | Nothing has reached this project. | Check the URL in your provider and use its “Redeliver” / “Test” button. |
Every refused delivery is also written to the API server log as a warning naming the project and the reason, so an operator can alert on them.
Your provider will report a refusal as 404 Not Found, whatever the cause.
That is deliberate. The receiver is unauthenticated — anyone who knows a project’s
ID can POST to it — so a wrong secret, a disabled toggle, and a project with no
automation at all must be impossible to tell apart from outside. Otherwise the
endpoint becomes a way to discover which of your projects have automation
configured. The real reason is in the Last delivery row and the server log,
both of which require you to already be a Project Manager or Project Admin on that project.
Rotating the secret
Section titled “Rotating the secret”Click Rotate secret to issue a new signing secret. The previous secret stops working immediately, so update your provider’s webhook with the new value or automation will stop. As with generation, the new secret is shown only once.
How it stays safe
Section titled “How it stays safe”- Signature-verified. Every inbound webhook must carry a valid signature computed from the project’s secret; unsigned or mis-signed requests are rejected. The secret is stored encrypted and is never returned by the API after generation.
- Off by default. Nothing happens until an admin both enables automation and sets a secret.
- Forward-only. Cards advance (→ Review, → Complete); the receiver never moves a card backward and never overrides board permissions.
- Uniform refusals. Every rejection before signature verification returns the
same
404, so the endpoint cannot be used to find out which projects have automation enabled. See Check what happened to a delivery. - Bounded. Inbound payloads over 1 MB are rejected before they are read, and deliveries are rate-limited both per project and per source address.
Relationship to the Integration Hub
Section titled “Relationship to the Integration Hub”This is the OSS, user-driven, per-project automation. The org-wide, bidirectional Integration Hub (centrally administered connectors with writeback) is an Enterprise feature (ADR-0097). Git-event automation needs no Enterprise edition — a single team can wire it up themselves.