This page answers two questions: how large a project TruePPM handles, and what hardware to ask your IT team for. The short answers come first. Everything after Technical reference is for the people who will install and run it, and every recommendation up here links to the detail behind it.
At a glance
Section titled “At a glance”How large a project
Section titled “How large a project”Plan for up to about 2,000 tasks per project. That is where the Schedule (the Gantt view) still opens in about a second.
This is a Schedule limit, not a data-capacity limit. The API and database hold far more: a single page of the task list has been tested to 10,000 tasks with no breach, and a workspace holds 50 projects and 50,000 tasks with no measurable slowdown. What sets the 2,000-task figure is that opening the Schedule fetches every task in the project, and that whole-project fetch is what crosses the 2-second line early — see why the whole-project ceiling is where it is.
| Tasks in one project | What to expect in the Schedule |
|---|---|
| Up to 2,000 | Opens in about a second. Recommended. |
| 2,000–4,000 | Opens in a few seconds. Workable. |
| 4,000–8,000 | Takes 3–8 seconds to open — and, while other people are viewing it, about that long again for each of them every time someone makes a change. |
| Above 8,000 | Not recommended in 0.4. A 16,000-task project takes about 40 seconds to open, and a 32,000-task one about two minutes. |
| 100,000 | Not a supported target in 0.4. The work to get there is tracked for 0.5. |
The one exception: 0.4.0-beta.1, the first 0.4 beta, shipped with PostgreSQL JIT compilation left on, which halves these numbers to about 1,000 tasks. Every beta since 0.4.0-beta.2 turns it off automatically — see item 1 of the checklist only if you’re still on that original build and haven’t upgraded.
Splitting a very large plan into several projects inside one program keeps each Schedule fast. Other projects in the same system barely slow each other down — measured up to 50 projects and 50,000 tasks, with no breach found. The exception is a program whose projects have dependencies between them: its schedule is recalculated as one, so keep the whole program under about 50,000 tasks — a planning recommendation extrapolated from the recalculation worker’s memory limit (see Toward 100,000 tasks), not tested to the same degree as the workspace figure above.
How large a team
Section titled “How large a team”“Users” here means people working at the same moment, not everyone with an account. Usually only about a third of a team is active at once.
| Team size | Active at once | Start with (estimate) |
|---|---|---|
| Up to about 25 | ~10 | One server: 4 vCPU, 8 GB RAM — Profile A |
| About 150 | ~50 | One server or node: 4 vCPU, 8 GB RAM |
| About 300 | ~100 | Two nodes: 8 vCPU, 16 GB RAM in total |
| About 600 | ~200 | Two to three nodes: 16 vCPU, 32 GB RAM in total |
A team of about 250 running a large program should look at Profile B, which budgets more (about 16 vCPU and 32 GB RAM) because it gives schedule recalculation its own machines. All of these need a separately managed database; see the checklist.
Other limits in 0.4
Section titled “Other limits in 0.4”- Monte Carlo forecasts (P50/P80/P95) run on projects of up to 5,000 tasks.
- CSV and Excel import takes up to 5,000 rows per file.
- The web app has not yet been measured in a browser on very large projects. See #3832.
What to tell your IT team
Section titled “What to tell your IT team”Hand this list over as it is. Each item links to the detail.
- If you run PgBouncer in transaction-pooling mode, turn off PostgreSQL’s JIT compiler yourself. TruePPM’s own per-connection setting only lands on whichever server connection happens to serve it there, so every transaction-pooling deployment needs the manual fix regardless of build. (Legacy case: the original 0.4.0-beta.1 release also shipped with JIT left on; every beta since turns it off automatically, so this only matters if you’re still on that first build.) Left on, it makes a 2,000-task Schedule take about 40 seconds to open instead of about one. → How to check and change it
- Run more than one API worker. The single most effective setting for teams working at the same time: eight people opening the same large project waited 22.5 seconds each with the default of one, and 7.3 seconds with four. → Raising the uvicorn worker count
- Use a managed PostgreSQL and a managed Valkey (or Redis) for anything holding real data. The bundled ones are for evaluation and have no failover. → Production-vs-default caveats
- Use object storage (S3-compatible) for file attachments as soon as the API runs more than one copy. → Production-vs-default caveats
- Give the background worker more than its default 2 GB of memory if any project, or any program with cross-project dependencies, will pass about 50,000 tasks. → Toward 100,000 tasks
- Add a connection pooler (PgBouncer) for large teams. → Profile B and Bottlenecks
- Start from the sizing tiers, then load-test with your own schedules. → Before you commit
Technical reference
Section titled “Technical reference”Everything below is for the teams who will deploy and operate TruePPM: the sizing tiers and worked profiles, the defaults the Helm chart ships, the bottlenecks in the order they appear, and the full measured envelope with its method, raw data and open questions.
PostgreSQL JIT
Section titled “PostgreSQL JIT”PostgreSQL enables JIT compilation by default, and 0.4.0-beta.1 does not turn it off. On that build a 2,000-task project takes about 41 seconds to open in the Schedule on the test machine (see Method), against about 1 second with JIT off. Builds that include #3829 turn JIT off on every database connection TruePPM opens, the API’s and the Celery workers’ alike, and need nothing from you.
Two setups should also set it on the server:
- You run PgBouncer in transaction-pooling mode. TruePPM’s per-connection setting lands only on whichever server connection happened to serve it, so it is best-effort there.
- You are on 0.4.0-beta.1 and cannot upgrade yet.
Check with SHOW jit; as the TruePPM database user, and turn it off for that role:
ALTER ROLE trueppm SET jit = off; -- takes effect on new connectionsManaged PostgreSQL services (RDS, Cloud SQL, Azure) expose jit as a parameter-group setting; set it there if you cannot ALTER ROLE. TruePPM issues only short, repeated queries, which JIT’s compile cost never pays back.
”Users” means concurrent active users
Section titled “”Users” means concurrent active users”Throughout this page, users means concurrent active users, not named seats. PPM tools typically run at ~30–40% concurrency — a 200-seat license rarely has 200 people clicking at once. If the numbers you are planning against are named seats rather than simultaneous sessions, divide expected load by roughly three before reading the tables below.
Sizing tiers
Section titled “Sizing tiers”| 50 concurrent | 100 concurrent | 200 concurrent | |
|---|---|---|---|
| API (uvicorn) replicas | 2 | 3 | 4–6 |
| Web (nginx SPA) replicas | 2 | 2 | 2–3 |
| Celery worker replicas | 1 (concurrency 2–4) | 2 (concurrency 4) | 3–4 (concurrency 4) |
| API total CPU / RAM | ~1 vCPU / 2Gi | ~1.5 vCPU / 3Gi | ~3 vCPU / 6Gi |
| Celery total CPU / RAM | ~1 vCPU / 2Gi | ~2 vCPU / 4Gi | ~4 vCPU / 8Gi |
| PostgreSQL | 2 vCPU / 4Gi, 20Gi disk | 2–4 vCPU / 8Gi, 50Gi | 4 vCPU / 16Gi, 100Gi |
| Valkey / Redis | 1 vCPU / 1Gi | 1 vCPU / 2Gi | 2 vCPU / 4Gi |
| Cluster total (with headroom) | ~4 vCPU / 8 GB, 1 node | ~8 vCPU / 16 GB, 2 nodes | ~16 vCPU / 32 GB, 2–3 nodes |
Two worked profiles: team of 25 vs team of 250
Section titled “Two worked profiles: team of 25 vs team of 250”The tiers above are keyed to concurrent users. Most operators plan against a team size (named seats) instead, so here are two fully worked profiles at the ends of the OSS single-program range. Both apply the ~30–40% concurrency rule: a team of 25 is ~8–10 concurrent, a team of 250 is ~75–100 concurrent. Every number is a starting point to load-test against your own workload, not a guarantee.
Profile A — team of 25 (single program, one node)
Section titled “Profile A — team of 25 (single program, one node)”A single PM and their team. Fits comfortably on one small node; the bundled subcharts are still not recommended for real data, but a single managed Postgres and managed Valkey are inexpensive at this size.
| Component | Replicas | Requests (CPU / mem) | Limits (CPU / mem) |
|---|---|---|---|
| API (uvicorn, 2 workers/pod — non-default) | 2 | 250m / 512Mi | 1 / 1Gi |
Celery worker (--concurrency 2) | 1 | 250m / 512Mi | 1 / 2Gi |
| PostgreSQL (managed) | 1 | 1 vCPU / 2Gi | 2 / 4Gi |
| Valkey / Redis (managed) | 1 | 250m / 512Mi | 1 / 1Gi |
- Cluster total (with headroom): ~4 vCPU / 8 GB, 1 node, ~20Gi Postgres disk.
- PgBouncer: not needed — connection count stays well under
max_connections=100. - API workers: the single most important non-default change is
--workers 2on the API pods; at 2 replicas that is 4 request workers, ample for ~10 concurrent. It is genuinely non-default — see Raising the uvicorn worker count for what it takes on each deployment path.
Profile B — team of 250 (large program, dedicated pools)
Section titled “Profile B — team of 250 (large program, dedicated pools)”A large program at the top of the OSS single-program envelope. (Coordinating multiple programs under one PMO is portfolio governance — an Enterprise concern — not a bigger version of this profile.) Here the scheduler CPU and the Postgres connection ceiling both bite, so Celery gets its own pool and PgBouncer is mandatory.
| Component | Replicas | Requests (CPU / mem) | Limits (CPU / mem) |
|---|---|---|---|
| API (uvicorn, 2–3 workers/pod — non-default) | 4–6 | 500m / 1Gi | 1 / 2Gi |
Celery worker (--concurrency 4, pinned) | 3–4 | 500m / 1Gi | 2 / 4Gi |
| PostgreSQL (managed) | 1 (+ replica optional) | 4 vCPU / 16Gi | 4 / 16Gi |
| PgBouncer | 2 | 100m / 128Mi | 500m / 256Mi |
| Valkey / Redis (managed, persistent) | 1 | 1 vCPU / 2Gi | 2 / 4Gi |
- Cluster total (with headroom): ~16 vCPU / 32 GB, 2–3 nodes, ~100Gi Postgres disk.
- PgBouncer: required.
ATOMIC_REQUESTS=true+CONN_MAX_AGE=60means every API and Celery worker holds a Postgres connection; 6 API pods × 3 workers + 4 Celery pods × 4 will exceed the defaultmax_connections=100without pooling. - Celery pinning: set
processes.worker.concurrency: 4to match the pod CPU limit. The chart pins concurrency for you — it defaults to2— so the worker never falls back to Celery’scpu_count()default, which reads the node’s core count rather than the cgroup CPU limit and gets OOM-killed on a large shared node. - Dedicated Celery node pool: keep reforecast/Monte Carlo CPU bursts off the request-serving API pods so a portfolio recompute never starves interactive traffic.
Both profiles slot into the values reference —
set replicaCount / replicas.web, resources.*, the managed-datastore
env.DATABASE_URL / env.REDIS_URL, and (for Profile B) processes.worker.concurrency.
Raising the uvicorn worker count
Section titled “Raising the uvicorn worker count”Both profiles above assume more than one uvicorn worker per API pod. That is not what the shipped image does, and the two figures are not in conflict — one describes the default, the other describes the change you should make.
The image’s CMD is uvicorn trueppm_api.asgi:application --host 0.0.0.0 --port 8000, with no --workers. How you change it depends on the path:
| Path | How |
|---|---|
| Docker Compose | Override the api service’s command in docker-compose.override.yml, appending --workers 2. Copy the K=... and export JWT_SIGNING_KEY=... lines from the base file’s command into your override: without them the API refuses to start (it would otherwise sign tokens with the public dev key). |
| Single server with systemd | Add --workers N to the ExecStart line. |
| Helm | Set processes.api.workers (default 1, the shipped single-process behavior, unchanged). Builds that include #3833 render it as --workers N on the api container’s command — the same escape-hatch shape as processes.worker.extraArgs. See processes.api.workers in the values reference. |
Raising processes.api.workers is a memory and database-connection decision, not just a
CPU one. Each additional worker is its own process — about 160 MiB resident in
the measurement above, on top of Django’s base import footprint — and it comes
out of the pod’s resources.limits.memory; size that limit before raising the
worker count. Each worker also holds its own PostgreSQL connection for most of
its lifetime (CONN_MAX_AGE=600 under ATOMIC_REQUESTS in
trueppm_api.settings.prod, the settings module the chart sets), so
replicaCount x processes.api.workers counts against PostgreSQL’s max_connections — add
a connection pooler (PgBouncer) or raise max_connections before pushing
either number far (#2275).
The bundled PostgreSQL sub-chart is also part of the ceiling on what more workers buy you: it is capped at 2 CPU (see What the shipped defaults give you), and in the measurement above PostgreSQL itself used 11 cores at 8 concurrent users against an unconstrained test database — well past what the bundled sub-chart could supply. Point extra API workers or replicas at a database sized to match, not at the bundled sub-chart, or the database becomes the next wall.
On Kubernetes, replicaCount and multi-worker pods buy the same throughput; a
replica additionally buys you redundancy, which a second worker in the same pod
does not. Prefer replicas there. Only multi-worker pods have been measured (four workers cut eight concurrent Schedule opens from 22.5 s to 7.3 s); replicas are expected to behave the same but have not been. See Durability &
Redundancy for what that costs.
What the shipped defaults give you
Section titled “What the shipped defaults give you”The Helm chart (packages/helm/values.yaml) ships these defaults:
- API pod (Django + uvicorn) and Celery worker each request
250m CPU / 512Miand limit at1 CPU / 2Gi. Both are driven by the samereplicaCountkey — there is no separate worker replica key yet — and the production overlay sets it to2. - Web tier (nginx + the compiled SPA) follows the top-level
replicaCountwhilereplicas.webis empty (the default), sovalues-prod.yamlruns two web pods. Setreplicas.webto scale it independently. - Bundled PostgreSQL requests
250m / 1Gi, limits2 CPU / 4Gi, with an 8Gi PVC. - Bundled Valkey requests
100m / 256Mi, limits1 CPU / 1Gi, with a 2Gi PVC and AOF persistence enabled (valkey-server --appendonly yes).
The key constraint to understand: uvicorn runs a single worker per pod by default — packages/api/Dockerfile sets CMD ["uvicorn", …] with no --workers flag, and the chart’s processes.api.workers value (default 1) preserves that until you raise it — so on Kubernetes request throughput scales by replica count alone unless you also raise the per-pod worker count. That one process is a measured limit, not a theoretical one: eight people opening the same 8,000-task Schedule at once waited 22.5 s each with it, and 7.3 s with four workers (Many users, many projects, and programs). See Raising the uvicorn worker count for the memory and database-connection cost of doing so. Celery concurrency is pinned by the chart at processes.worker.concurrency (default 2); raise it toward the pod’s CPU limit as you scale.
The web row was absent from this table until 0.4, and so was its redundancy:
the web replica key (then web.replicaCount, now replicas.web) shipped as a
truthy 1, which meant the fallback to the top-level replicaCount that
values.yaml documented could never fire. A
values-prod.yaml deploy rendered api=2, worker=2, web=1, with no
PodDisruptionBudget on any tier — the only tier a browser actually loads was the
unprotected singleton. It now follows replicaCount like the rest.
Production-vs-default caveats
Section titled “Production-vs-default caveats”These defaults are tuned for evaluation, not scale. At every tier above:
- The bundled PostgreSQL and Valkey sub-charts are dev/demo only — single replica, small PVCs, and no replication or failover on either. Both do persist: PostgreSQL on an 8Gi PVC and Valkey with AOF on a 2Gi PVC (
--appendonly yes, defaultappendfsync everysec→ roughly a 1 s broker RPO). What they cannot do is survive the loss of their one pod — and because/api/v1/readyzgates on a live cache round-trip, losing the Valkey pod marks every API podNotReadyand returns 503 for the whole application. Use a managed PostgreSQL (RDS, CloudSQL, etc.) and managed Valkey (ElastiCache for Valkey, Memorystore for Valkey, etc.) instead; operator-managed in-cluster HA modes for both are planned for 0.5 (#3403, #3404). See Valkey High Availability for which topologies are supported, and Durability & Redundancy for how the Compose stacks differ —docker-compose.prod.ymlruns Valkey on atmpfswith no persistence at all. - File attachments default to the local filesystem, which is not durable and — above one replica — not even correct. From 0.4 the chart can back local storage with a claim (
persistence.media), but aReadWriteOnceclaim binds to one node, so an upload accepted by one API pod is a404from the next; the chart refuses to render that combination. Every tier on this page runs the API at 2+ replicas, so at these sizes object storage is a requirement, not a durability nicety: setTRUEPPM_DEFAULT_FILE_STORAGEto an S3-compatible backend (MinIO, SeaweedFS, etc.) together withTRUEPPM_S3_BUCKET_NAME— see object storage. If you must stay on local disk, the claim needs aReadWriteManystorage class (CephFS, NFS, Azure Files, EFS); see attachment storage. - Check
jiton the database you bring. PostgreSQL enables JIT by default. Behind PgBouncer in transaction-pooling mode, setALTER ROLE <user> SET jit = offor the managed service’sjitparameter yourself — TruePPM’s own setting is best-effort there regardless of build. (Legacy case: the original 0.4.0-beta.1 release didn’t turn JIT off on its own at all, making a 2,000-task Schedule take tens of seconds to open; every beta since turns it off per connection.) See PostgreSQL JIT. values-prod.yamlships a static two API replicas. Installing it gives youreplicaCount: 2and no autoscaling: the API does not add pods under load unless you enable the HPA yourself. The Horizontal Pod Autoscaler is off by default, not absent. The chart ships anautoscaling/v2HPA for the API tier (and optionally the worker tier) behindautoscaling.enabled; the defaults scale the API between 2 and 6 replicas at 75% CPU utilization. It is opt-in because an HPA overrides the staticreplicaCountand requiresmetrics-server(or a custom metrics adapter) to be installed in the cluster. Without it, scale replicas manually. To enable it: installmetrics-server(confirmkubectl top podsreturns data), then setautoscaling.enabled=true(--set autoscaling.enabled=true, or uncomment the line in the commented block invalues-prod.yaml); keepautoscaling.worker.enabled=false. Size the database connection budget forautoscaling.api.maxReplicas(default 6), not for the static two replicas. See the values reference for the full key list.- Autoscale the API tier; keep the worker tier on fixed replicas. The
processes.worker.concurrencypinning advice above and a CPU-utilization HPA are two different answers to the same load, and following both naively double-counts: the HPA adds worker pods while each pod’s concurrency is already pinned to its CPU limit, so a Monte Carlo burst can multiply total in-flight tasks well past what the database connection ceiling tolerates. Until worker autoscaling keys off queue depth rather than CPU, the safe posture isautoscaling.enabled=truewithautoscaling.worker.enabled=false— HPA for request-serving traffic, fixed replicas plus pinned concurrency for the CPU-bound queue.
Bottlenecks, in the order they bite
Section titled “Bottlenecks, in the order they bite”Items 1 and 2 are measured; items 3, 4 and 5 are reasoned from the deployment shape and have not been load-tested.
- Project size in the Schedule. Opening a project fetches every task. Up to about 2,000 tasks that takes about a second; past 8,000 it rises steeply, and every change someone makes costs each open Schedule that load again. This is fixed in code, not hardware — see Toward 100,000 tasks. On 0.4.0-beta.1, PostgreSQL JIT makes this far worse.
- Single uvicorn worker per pod. Request CPU is a single process per pod, and it pins at one core: eight concurrent opens of an 8,000-task Schedule took 22.5 s each with one process and 7.3 s with four. WebSocket collaboration keeps connections open (the Channels capacity of 1500 is fine). Add
--workersor scale replicas before reaching 100 users — see Raising the uvicorn worker count. This is the single most important non-default change. - Celery / recalculation and Monte Carlo. The scheduler is the heavy part. A full CPM recalculation runs on every change, costs about 1 ms per task, and holds about 30 KB of memory per task — a program with cross-project dependencies counts its whole task total (#3831). A portfolio reforecast or a Monte Carlo run is a CPU-bound burst. Scale Celery replicas, and raise
processes.worker.concurrencyto match the pod’s CPU limit. The chart pins this at2by default precisely so it never falls back to Celery’scpu_count()auto-detection, which reads the node’s cores rather than the cgroup limit, over-allocates, and gets OOM-killed (the dev compose file caps it at 2 for the same reason). - Postgres connection ceiling.
CONN_MAX_AGE=60andATOMIC_REQUESTS=truemean every request runs inside a transaction and holds a connection. With many API and Celery workers, you approach PostgreSQL’s defaultmax_connections=100at the 200-user tier — add PgBouncer or raisemax_connections(#2275). With four workers, eight concurrent users kept 11 PostgreSQL cores busy, so give the database cores to match the API tier you scale to. - Per-project write serialization. The first synced write in a request allocates the project’s sync sequence number with an
UPDATEon the project row, and that row lock is held until the request commits. Writes to one project therefore run one at a time, so per-project write throughput is capped at roughly one over the request latency. A long operation against a single project (an MS Project import, a template apply, a bulk paste) holds up every other edit to that project until it finishes, and interactive saves queued behind it can hit proxy timeouts. Writes to different projects do not contend. Schedule large imports outside working hours, and keep proxy timeouts above your longest import. The lock is what keeps the offline sync cursor from skipping rows, so it is not a setting you can turn off. Shrinking the lock window is tracked in #4469.
Startup budget
Section titled “Startup budget”How long each component can take to boot before Kubernetes gives up on it and
restarts the container, at the chart’s shipped probe defaults. This is the
number to compare against your node’s actual boot time (image pull, migration
count, broker reconnect) when deciding whether to raise a failureThreshold or
periodSeconds for a slower environment. Full probe semantics — what each one
checks, and what to do when it fails — are in
Startup, Readiness, and Liveness Probes; this table
is only the arithmetic.
| Component | Time to first Ready (typical) | Time to restart if never Ready |
|---|---|---|
| api | ~10s (readiness.initialDelaySeconds) once migrations are applied and the DB/cache answer | With no startup probe (default): livenessInitialDelaySeconds (30) + livenessFailureThreshold (3) × livenessPeriodSeconds (30) = 120s. With probes.api.startupEnabled=true: startupFailureThreshold (30) × startupPeriodSeconds (5) = 150s, and liveness is suspended until startup passes. |
| celery worker | ~15s (readiness.initialDelaySeconds) once worker_ready has fired once | Startup: failureThreshold (30) × periodSeconds (5) = 150s — this gates whether the container is ever considered for liveness at all. Liveness (once startup passes): initialDelaySeconds (60) + failureThreshold (5) × periodSeconds (60) = 360s total, derived to match the worker’s 300s termination grace so a kill never costs more unavailability than the detection that ordered it. |
| celery beat | N/A (liveness-only; no readiness, see below) | initialDelaySeconds (30) + failureThreshold (5) × periodSeconds (60) = 330s. Beat’s grace is only 30s, so a kill itself is cheap — the generous threshold exists to absorb a brief worker blip on the fleet ping, not a slow beat boot. |
| web (nginx) | ~5s (readinessInitialDelaySeconds) — no startup dependency, so this is close to the container’s actual start time | livenessInitialDelaySeconds (10) + failureThreshold (3, chart default) × livenessPeriodSeconds (30) = 100s |
Two numbers on this page are not tunable per-component budgets, on purpose:
- Beat renders no readiness probe. It is a pinned singleton behind no
Service (
strategy: Recreate,replicas: 1), so a readiness probe would gate nothing beyond rolling-update pacing that a singleton doesn’t do, while still costing a Django import in the chart’s tightest cgroup (250m CPU / 256Mi). “Schedule loaded” — the readiness question the scope table poses for beat — is answered instead by the presence of the--scheduleshelve file, which is what the Docker Compose healthchecks check directly (Helm has no Service to gate, so it does not render an equivalent probe). - The API’s
failureThreshold(3) on liveness is not itself configurable independent of the shared default — it comes fromprobes.api.livenessInitialDelaySeconds/livenessPeriodSecondsplus Kubernetes’ own defaultfailureThreshold: 3on any probe block that does not set one explicitly (the API’sprobes.*values invalues.yamldo not expose it as a separate key). Set it directly in a chart patch if your environment needs a different one.
Tested envelope
Section titled “Tested envelope”The envelope has been measured three times, and the first two runs were read wrongly. On 2026-09-16 both earlier measurements were re-examined on one machine, back to back (#3829). That run found:
- The 2026-07-26 and 2026-09-15 runs were taken on different computers. This page previously recorded only the first, so the difference between them read as a change in the product.
- The harness had been measuring whatever query plan PostgreSQL happened to pick before its planner statistics caught up with the freshly seeded data.
- The cause of the 2,000-task “cliff” is PostgreSQL’s JIT compiler, which TruePPM now turns off.
The whole-project row below is from that run; the other rows carry their date and machine.
These are the numbers TruePPM has been tested to hold. They are not the maximum it can hold, and they are not a promise about your hardware. Where a ceiling is set by known, already-triaged work, that issue is named — so you can judge whether your shape of project sits near an edge.
Method
Section titled “Method”Measured with the capacity harness in packages/api/perf/capacity/, which you can re-run yourself. It steps load up until the first sustained breach rather than driving a fixed profile, where a breach is p95 > 2 s or an error rate > 1%. 2 s is the “still usable” line for opening a schedule.
The stack under test is an isolated Docker Compose stack running settings.prod with DEBUG=False and the shipped image’s default command — which is a single uvicorn process. That single process is itself one of the constraints below. PostgreSQL 16 runs with shared_buffers=1GB, effective_cache_size=3GB, max_connections=200.
Hardware. Two machines have been used, and figures from different machines cannot be compared with each other — the chips differ in core generation, performance/efficiency core mix, and memory bandwidth, and those differences do not all point the same way:
| Run | Machine | Docker Desktop allocation | Used for |
|---|---|---|---|
| 2026-07-26 | Apple M1 Max — 8 performance + 2 efficiency cores, 32 GiB | 10 CPU / 7.75 GiB | Dependency and workspace rows |
| 2026-09-15 | Apple M5 Pro — 6 performance + 12 efficiency cores, 64 GiB | 18 CPU / 8 GiB / 1 GiB swap | Task-list page row |
| 2026-09-16 | Apple M5 Pro, as above | 18 CPU / 8 GiB / 1 GiB swap | Whole-project row, the diagnosis, and every section from “Toward 100,000 tasks” on |
Both are single-node developer-class machines, not a tuned multi-node cluster, and both are faster per core than a typical small VPS. Do not read either as a worst case.
Statistics. PostgreSQL chooses a query plan from statistics that autovacuum refreshes some time after data changes. The harness re-seeds a project at every step and, on 0.4, does not run ANALYZE (planned for 0.5), so its readings depend on whether autovacuum has caught up yet. A real database has been running long enough that it has. The whole-project row is therefore measured with ANALYZE run after seeding — the steady state — and every load in it was measured individually, 7 per size. (On 0.4 the harness’s own “p95” is its slowest of 7 samples, so it can be set by a single outlier; 0.5 is planned to take 21.)
What was measured
Section titled “What was measured”| Dimension | Tested to | Measured | What sets the ceiling |
|---|---|---|---|
| Tasks per project — one page of the task list | 10,000 tasks | 2026-09-15, single run: 0.15 s @ 1k · 0.25 s @ 2k · 0.64 s @ 4k · 0.68 s @ 8k; a separate targeted run measured 0.44 s @ 10k — no breach at any size | Page-bounded — on page 1. Deep pages cost far more (see below). Not re-measured at steady state; the 2026-07-26 breach at 8k (8.3 s) was on the other machine and cannot be compared |
| Whole-project load — every page, what the Schedule fetches before drawing a bar | 100,000 tasks | 2026-09-16, current main with JIT off: 0.47–0.58 s @ 1k · 1.07–1.37 s @ 2k · 2.6–3.05 s @ 4k · 6.8–8.4 s @ 8k · 37 s @ 16k · 112 s @ 32k · ~37 min @ 100k — breaches the 2 s line between 2k and 4k. 16k and above are each on a freshly created database; the 100k figure is computed from first-, middle- and last-page timings, a method that overestimated the measured 32k load by 13% | #3381 — every page skips the rows before it with an OFFSET, and the skipped rows are not free: the last page of a 100,000-task project takes 8.7 s while the first takes 0.11 s. Without the JIT fix the same build takes 14.4 s @ 2k — see why, and toward 100,000 tasks for where everything else runs out |
| Dependency edges per project | 12,000 edges on a 4,000-task project | 2026-07-26: 0.12–0.15 s, flat — no breach found | Not the binding constraint at this scale. Untested above 12,000 |
| Projects per workspace / total tasks | 50 projects · 50,000 tasks | 2026-07-26: 0.04–0.06 s, flat — no breach found | The project-list N+1 (#1482) does not bite at this scale. Untested above 50 projects |
PostgreSQL’s JIT compiler caused the 2,000-task cliff described below. What to do about it on your own database is in PostgreSQL JIT.
Two things in this table matter more than the rest.
The Schedule is the binding constraint, not the database. A project holds several thousand tasks comfortably while you page through a list, and a workspace absorbs 50,000 tasks without noticing. But when the Schedule opens a project the client pulls every page, and that is a far lower ceiling. Plan against ~2,000 tasks per project on a build with the JIT fix, and ~1,000 on 0.4.0-beta.1 — not the 10,000 in the first row, which measures a single page rather than opening a project.
Above that it slows steadily to 8,000 tasks, then steeply. With JIT off, each doubling up to 8,000 multiplies whole-project load by 2.2–2.7×, so a 4,000-task project opens in about 3 seconds and an 8,000-task one in about 8. The next doubling is 5.5×: a 16,000-task project takes about 37 seconds, and a 32,000-task one about two minutes. The sudden 2,000-task cliff this page used to warn about was JIT; the steepening past 8,000 is the OFFSET cost described below, and toward 100,000 tasks covers what runs out after it.
Why the whole-project ceiling is where it is
Section titled “Why the whole-project ceiling is where it is”This is the number most likely to decide whether TruePPM fits your project, so here is the mechanism rather than just the figure. Raw data for everything in this section is committed under packages/api/perf/capacity/results/2026-09-16-same-host/.
The cliff was JIT compilation. PostgreSQL JIT-compiles a query whose estimated cost passes jit_above_cost (100,000 by default), and optimizes and inlines it past 500,000. The task list’s page query carries a dozen correlated subqueries, and once statistics describe a ~2,000-task project its estimate crosses all three thresholds. EXPLAIN (ANALYZE, BUFFERS) of one page, 2,000 tasks, OFFSET 1000, on the 2026-09-15 code:
| Execution time | |
|---|---|
jit = on (default) | 4,512 ms — of which JIT: optimization 549 ms, emission 3,872 ms |
jit = off | 49 ms |
That cost is paid on every page, independent of the offset. The PostgreSQL slow-query log over seven 2,000-task loads recorded 56 statements over 3 s, every one of them the page query and none the pagination COUNT. Whether a given measurement paid it depended on whether statistics had caught up yet, which is why it appeared as one slow sample on some runs, as a 60 s outlier on another, and not at all on the fastest.
With JIT off, one cost dominates: the OFFSET. A whole-project load is ceil(N / 200) page requests. Each page skips the rows before it, and skipping a row is not free. EXPLAIN (ANALYZE, BUFFERS) of the last page of a 32,000-task project (OFFSET 31800, ordered by wbs_path, name) shows PostgreSQL producing all 32,000 rows — evaluating the task list’s 21 per-task subqueries for each — and then discarding all but 200: 1,800 ms, against 24 ms for the same query at OFFSET 0. Page timings, each on a freshly created database:
| Tasks | First page | Middle page | Last page |
|---|---|---|---|
| 2,000 | 67 ms | 86 ms | 123 ms |
| 16,000 | 69 ms | 442 ms | 884 ms |
| 32,000 | 82 ms | 625 ms | 1.5 s |
| 100,000 | 113 ms | 3.3 s | 8.7 s |
Keyset pagination (#3381) removes the skip, so every page costs about what the first page costs now.
The pagination COUNT is no longer a meaningful cost. The first page includes it, and the first page takes about 110 ms at 100,000 tasks. It used to dominate: annotate_tasks_queryset’s aggregate annotations made .count() recompute every annotation for every row (#2815), measured at 457–503 ms against a 115 ms page on a 4,000-task project (#2807). That figure and page 70 at 4,890 ms predate both #2814 and the JIT finding, and did not separate compile time from execution.
What has already moved it. On one machine at 2,000 tasks with JIT on, whole-project load fell from ~41 s on the 2026-09-15 code to ~14 s on current main. That span includes #2814, which replaced the aggregate annotations with subqueries and removed the query’s GROUP BY, but it also includes every other change merged in between, and the gain has not been isolated to #2814. Turning JIT off, the only difference between the last two builds measured, took the same load from ~14 s to ~1.1 s.
How this ceiling is raised in 0.5
Section titled “How this ceiling is raised in 0.5”With JIT off, the measured curve now has the shape the remaining costs predict:
| Step | Whole-project load | Growth for 2× the data |
|---|---|---|
| 1,000 → 2,000 | 0.50 s → 1.10 s | 2.2× |
| 2,000 → 4,000 | 1.10 s → 2.85 s | 2.6× |
| 4,000 → 8,000 | 2.85 s → 7.7 s | 2.7× |
| 8,000 → 16,000 | 6.8 s → 37.4 s | 5.5× |
| 16,000 → 32,000 | 37.4 s → 112 s | 3.0× |
From 2,000 to 32,000 tasks — 16 times the data — the load takes about 100 times as long. The changes that bend this curve, in the order their measured effect now suggests, tracked on #3383:
| What ships in 0.5 | Effect on the curve | |
|---|---|---|
| #3381 | Keyset pagination on the task read | Removes the OFFSET term, which is now the dominant cost — every page costs about what page 1 does |
| #3382 | A slim bootstrap projection, so the Schedule stops fetching 99 fields per task to draw a bar | Cuts the per-page cost and the ~2.3 KB of JSON per task (below) |
| #2341 | Splice a remote task_updated into the cache instead of re-fetching | Stops a plain field edit (name, notes, labels, custom fields) from costing every open Schedule a whole-project load; status, progress, duration, dates, parent, order, sprint, dependency, owner and assignee edits still re-fetch (#4950) |
| #2815 | Count on the unannotated queryset | Now small — the first page, count included, is 127 ms at 100,000 tasks |
No 0.5 number is promised here. Each change has a mechanism but not yet a measured outcome. The nightly budgets set in #2826 are gross-regression tripwires (roughly the observed ceiling plus headroom for run-to-run contention), not a capacity signal: a green nightly rules out a large regression, and confirms no improvement. This page has already published one figure that a better measurement overturned. When the work above is measured, the rows will carry numbers instead of mechanisms.
One thing that is not on this list, and is deliberately not: loading only the visible part of the schedule. The outline numbers each task by its position among the siblings actually loaded, so a partial task set renders wrong rather than merely incomplete. Fetching less is a correctness hazard in a way that fetching more cheaply is not, which is why every change above makes the fetch cheaper instead.
Toward 100,000 tasks
Section titled “Toward 100,000 tasks”A 100,000-task project is not usable today, and the whole-project load is only one of the reasons. Measured 2026-09-16 on current main with JIT off, one project and one user, with ANALYZE after seeding, on the M5 Pro above. Load times at 16,000 and above are from freshly created databases; the recalculation, memory and size columns come from the single re-seeded sweep described in the note above, where churn affects load time far more than memory:
| Tasks | Whole-project load | JSON sent to the browser | CPM recalculation | Recalculation peak memory | Task table on disk |
|---|---|---|---|---|---|
| 2,000 | 1.1 s | 4.6 MB | 1.7 s | 189 MiB | 6 MB |
| 8,000 | 6.8 s | 18 MB | 6.9 s | 357 MiB | 25 MB |
| 16,000 | 37 s | 37 MB | 14.0 s | 583 MiB | 46 MB |
| 32,000 | 112 s | 73 MB | 28.4 s | 1.0 GiB | 70 MB |
| 64,000 | not measured on a fresh database | 146 MB | refused in 0.4 | 1.1 GiB | 129 MB |
| 100,000 | ~37 min (computed) | 229 MB | refused in 0.4 | 1.6 GiB | 208 MB |
Each part of the system runs out at a different size, and for a different reason:
| Part | What limits it | Where it runs out | Tracked on |
|---|---|---|---|
| Opening the Schedule | The OFFSET cost above | Past the 2 s line near 3,000 tasks; ~37 s at 16,000 | #3381, #3382 |
| Editing with others watching | A plain field edit refreshes one row; a status, progress, duration, dates, parent, order, sprint, dependency, owner or assignee edit still re-fetches the whole project for every open Schedule | Each edit costs each viewer a whole-project load — ~7 s at 8,000 tasks | #2341, #2598, #4950 |
| The browser | ~2.3 KB of JSON per task, all held in memory, plus paint and hit-testing that scale with the task count | Never measured in a browser — 229 MB of JSON at 100,000 tasks | #3832, #1539, #1540, #3119 |
| Schedule recalculation — limits | The engine bounds the longest dependency chain at 366,000 days and the total of all task durations and lags at 3,660,000 days (a CPU bound: ~2 s to schedule at the cap) | A 100,000-task project at 20 days per task totals 2M and is within it; parallel work no longer counts against the span | #3830 |
| Schedule recalculation — agile limits | A scrum story’s velocity worst case counts only along its dependency chain, but the sprint horizon summed over every scrum story must stay under 366,000 sprints | About 26,000 five-point stories in an all-agile project | #4695 |
| Schedule recalculation — memory | ~30 KB of resident memory per task; the chart limits the worker to 2 GiB | Extrapolates past 2 GiB near 60,000 tasks | #3831 |
| Schedule recalculation — time | Linear, ~0.9 ms per task, and repeated in full on every edit | Well inside the 480 s task limit at 100,000 tasks; the cost is per edit | #235 |
| Dependencies | MAX_DEPENDENCIES and MAX_EXPANDED_EDGES = 100,000 | 100,000 edges — about one per task | #3825 |
| Monte Carlo | MC_TASK_CAP = 5,000. The forward pass runs over chunks of runs; the sampled durations, one runs × tasks float64 matrix, are held whole up to 32M cells and replayed a row block at a time above that | Refuses above 5,000 tasks; ~475 MB at 50,000 × 1,000 runs if the cap were lifted (~785 MB with the matrix held, 2.1 GB before the chunked pass) | #3825, #3824, #4953, #2273 |
| Import | CSV/Excel parser limit | 5,000 rows per file | #743 |
| The database | Not a constraint at this size | 208 MB for 100,000 tasks fits in shared_buffers; the first page stays at 127 ms | — |
The seeded projects are flat — leaf tasks with no summary rows — and their dependencies are strictly forward-linked, so a real WBS will cost more in the per-row subqueries, and a real network’s sum of durations will be smaller than a single chain’s. Treat the table as the shape of the problem, not as a guarantee at any size.
Many users, many projects, and programs
Section titled “Many users, many projects, and programs”Everything above is one user opening one project. Three more measurements, same machine and build, show what changes when that is not true.
Concurrent users on one project cost far more than project size does, and the limit is the API process, not the database. Users open the same 8,000-task Schedule at the same moment, each fetching page 1 and then the rest four at a time, as the web client does:
| Users at once | One uvicorn process (shipped default) | Four uvicorn workers |
|---|---|---|
| 1 | 3.4 s | 2.4 s |
| 2 | 5.3 s | 3.0 s |
| 4 | 11.0 s | 4.0 s |
| 8 | 22.5 s | 7.3 s |
With one process the API pins at one core (118%) while PostgreSQL still has room; with four workers the API used 434% and PostgreSQL 1,107% at eight users. The shipped image runs one process and the chart has no setting to change it — #3833 adds one; until then see Raising the uvicorn worker count, or scale replicaCount. Each edit a user makes then multiplies this: a plain field edit (name, notes, labels, custom fields) refreshes one row in every open Schedule, but a status, progress, duration, dates, parent, order, sprint, dependency, owner or assignee edit still re-fetches the whole project, because it changes values on other rows (#4950).
Other projects in the same database barely matter. A 5,000-task project opened in 1.87 s on its own and in 2.14 s with 19 more 5,000-task projects beside it — 100,000 tasks in the database. The program rollup went from 15 ms to 27 ms and the project list from 15 ms to 30 ms. Per-project reads are indexed on the project, so a large workspace costs a little, not a lot.
A program with cross-project dependencies recalculates as one project the size of the whole program. Once a program holds an accepted cross-project dependency, every change to any member project re-runs CPM over every member’s tasks together (ADR-0120). Twenty 1,500-task projects: one project alone recalculated in 1.4 s and 176 MiB; the merged program — 30,000 tasks — took 36.1 s and 855 MiB, in line with a single 32,000-task project. Every limit in toward 100,000 tasks that is about recalculation — the span guard, worker memory, the dependency cap — therefore applies to the program’s total task count, not to any one project’s.
Would bigger machines, or Kubernetes, help?
Section titled “Would bigger machines, or Kubernetes, help?”It depends on which limit you are hitting:
- Many users at once — yes. This is a throughput limit, and it scales out. More API workers or replicas is the single most effective change measured on this page (22.5 s → 7.3 s at eight users). Give PostgreSQL the cores to match: the chart’s bundled PostgreSQL is limited to 2 CPU, and eight users needed eleven.
- One large project opening — barely. Each page request is a single query on a single PostgreSQL core, and the load grows about 100-fold for 16 times the tasks, so a core twice as fast buys well under twice the tasks. More cores and more replicas do not make one person’s load faster. This is fixed in code (#3381, #3382), not in hardware.
- Recalculating a large project or program — memory, yes. Raise the Celery worker’s
resources.limits.memoryabove the chart’s 2 GiB before a project or program passes ~50,000 tasks (#3831). In 0.4 no amount of hardware gets past the serial-sum span guard (#3830); 0.5 will replace it with a longest-chain bound. - The browser — no. A 100,000-task Schedule is a 229 MB download held in each user’s browser. Server hardware does not change that.
What was explicitly not measured
Section titled “What was explicitly not measured”These are untested, not unbounded. Do not read silence as a guarantee.
| Dimension | Status |
|---|---|
| Concurrent authenticated users, beyond one scenario | Measured once: up to eight users opening one 8,000-task Schedule (above). Not measured: mixed read/write traffic, more than eight users, or a multi-node deployment. With many API workers, database connections become the next constraint — #2275 (ATOMIC_REQUESTS with no connection pooler) |
Concurrent visitors on the public share-link demo (try.trueppm.com, unauthenticated read-only board/schedule projections) | Not measured. This is a different, much lighter workload than the row above — a small fixed projection rather than an 8,000-task Schedule — so the number above does not transfer. #4226 added Valkey caching of the built projection (short TTL) and raised the demo overlay to 3 API/worker replicas, but did not add a load test for the share endpoint itself; treat this row as still open |
| Concurrent WebSocket connections per project | Not measured. See #2339 — reconnect-storm scaling is a known open question |
| Monte Carlo iterations at the task ceiling | Not measured, but capped: MC_TASK_CAP (default 5000) bounds the tasks a simulation will accept, alongside MC_SIMULATION_CAP. Within that cap it is untested. In 0.4 Monte Carlo runs on the request thread, so your gateway timeout binds before the cap does; from 0.5 the forecast run will execute on a Celery worker (#2273), so the worker task’s 300-second soft limit binds instead, and only the what-if will still run in the request |
| Import size (rows) | Not measured here. CSV/Excel import shipped in 0.4 (#743); its 10 MB / 5,000-row limit is enforced at the parser, not derived from this run. Note that importing to the row limit puts a project well past the whole-project Schedule ceiling above — the import preview warns when this would happen (see below), but does not block it |
| Board rendering at scale | Not measured as a latency figure. From 0.5 the board draws at most 50 cards per cell or phone column (#1538 / #2340), so the number of cards in the DOM no longer grows with project size on the board (the Queue and Backlog lists are not windowed yet, #5002); in 0.4 it renders every card |
| Gantt interaction and browser memory at scale | Not measured. #3832 adds the benchmark; #1540 / #1587 — O(N) hit-test per pointermove |
| Sustained multi-day / multi-user soak | Not measured. Every figure above is a point-in-time read sweep |
Fidelity caveats
Section titled “Fidelity caveats”The seeded database is written with bulk_create, so it carries no django-simple-history rows and leaves server_version at 0. Neither is read by a schedule or task-list request, so read latency is unaffected — but on-disk size and sync-delta timings would understate an organically grown database. Generated dependencies are strictly forward-linked, which is tidier than a real plan’s topology.
Re-running this
Section titled “Re-running this”The numbers carry the version they were measured against so they can be compared next release:
The stack takes its secrets from the environment rather than from committed defaults, so mint throwaway values first — they are discarded with the stack. CAPACITY_DB_PASSWORD is read from 0.5 onward; on 0.4 the variable is ignored and you edit the compose file as described above:
export CAPACITY_INTEGRATION_KEY=$(python3 -c \ 'import base64,os; print(base64.urlsafe_b64encode(os.urandom(32)).decode())')export TRUEPPM_CAPACITY_PASSWORD=$(python3 -c \ 'import secrets; print(secrets.token_urlsafe(16))')export CAPACITY_DB_PASSWORD=$(python3 -c \ 'import secrets; print(secrets.token_urlsafe(18))')
docker compose -f packages/api/perf/capacity/docker-compose.capacity.yml up -dpython packages/api/perf/capacity/run_capacity.py --dimension all \ --out packages/api/perf/capacity/resultsdocker compose -f packages/api/perf/capacity/docker-compose.capacity.yml down -vRaw results are committed under packages/api/perf/capacity/results/: the 2026-07-26 sweep at the top level, and the 2026-09-16 same-host run — every sweep, the steady-state diagnostics, EXPLAIN output, slow-query logs and the driver scripts — under results/2026-09-16-same-host/. The 2026-09-15 sweep’s raw output was not committed.
Before you commit
Section titled “Before you commit”Load-test against your own workload before committing budget or hardware. The dominant cost is workload-specific — how many schedules are active and how often reforecasts and Monte Carlo runs fire matters far more than raw user count. The project-size figures on this page are measured, on one machine; the team-size hardware figures are still estimates until a multi-user benchmark exists.