Board sprint panel

When a project has an ACTIVE sprint, the Board view renders a sprint panel directly above the Kanban lanes. The panel composes the existing burndown chart, an inline 8-sprint velocity sparkline, and a capacity_points planning editor so a Scrum Master or PM does not have to switch routes to /sprints to see how the sprint is tracking against commitment.

  • Header band (always visible while the panel is rendered): sprint SP-XXXXXXXX, goal, dates, day-N-of-M, days-remaining, points committed.
  • Body (collapsible):
    • Burndown — reuses <BurnChart sprintId={…}> in sprint-scoped mode.
    • Velocity sparkline — 64×24px SVG, up to 8 closed sprints, most recent bar emphasized; caption shows the rolling average ± stdev. As of 0.3, sprints flagged exclude from velocity (e.g. a “Sprint 0” setup sprint) stay visible but marked, and are omitted from the rolling average; the velocity API reports how many were excluded via excluded_count (ADR-0113).
    • Capacity card — planning target (capacity_points) vs committed points snapshot, with an on-plan / at-risk / over-capacity status.

Hidden in two situations:

  1. The project’s methodology is WATERFALL — no sprint context, no panel (per methodology preset — ADR-0041).
  2. The project has no ACTIVE sprint — there is nothing to summarize.

Default open / collapsed state:

RoleDefault
VIEWER, MEMBERCollapsed
SCHEDULER+Expanded

User choice persists in localStorage under trueppm.board.${projectId}.sprintPanel.open and overrides the role-based default on subsequent visits.

A new field on the Sprint model — the team’s planning ceiling in story points, set pre-activation by the Scrum Master / Resource Manager. It is distinct from two existing quantities:

  • Sprint.committed_points — snapshotted on activation from the current backlog; immutable after that.
  • services.capacity_summary(...) — derived from resource allocations and PTO; reported in hours, not points.

capacity_points is the answer to “how many points do we plan to take?”, not “what does the backlog hold right now?” or “how many hours are the team available?”. All three are useful at different points in the cadence.

  • Editable on PLANNED and ACTIVE sprints (a team’s capacity may change mid-sprint — PTO, joiners). Locked on COMPLETED and CANCELLED.
  • Field-level RBAC: SCHEDULER+ writes only. Capacity is the team’s planning artifact, not a per-contributor field. MEMBER and below see the panel and the current planned value but cannot edit it; the inline editor is hidden in the UI and the server rejects the write at the serializer level.
  • Every change is recorded in Sprint.history (django-simple-history) so a coach or PM can see the audit trail of capacity revisions.

When tasks are injected into a sprint after it goes ACTIVE, the panel header surfaces a ⚠ N tasks added mid-sprint badge. The count is the number of tasks added to the sprint since its activation timestamp — the scope the team did not commit to at planning.

Clicking the badge opens a read-only scope-change audit drawer. Each row records one mid-sprint change:

  • Who added the task and when.
  • The task (key + title, deep-linking to the card).
  • Its point value at the time it was added.
  • Its statusaccepted, pending, or rejected — so the team can tell committed scope creep from a proposal still awaiting a decision.

The drawer reads from the GET /sprints/{id}/scope-changes/ endpoint and never mutates sprint state — it is a visibility surface, not an approval gate. The same audit is reachable from the milestone side via the scope-changed chip.

Screenshot TODO: Board sprint panel header showing the ⚠ 3 tasks added mid-sprint badge, and the open scope-change audit drawer.

  • Route: any project Board, /projects/:projectId/board
  • Tab: Board (the second tab in the canonical view order — ADR-0030)
MethodEndpointPurpose
GET/api/v1/projects/{id}/sprints/Reads the project’s sprint list to find the active one
PATCH/api/v1/sprints/{id}/Updates capacity_points (field-gated to SCHEDULER+)
GET/api/v1/sprints/{id}/burndown/Burndown series for the active sprint
GET/api/v1/projects/{id}/velocity/Rolling 8-sprint velocity for the sparkline
GET/api/v1/sprints/{id}/scope-changes/Read-only audit of tasks added to the sprint after activation — backs the mid-sprint scope-change badge and drawer (added in 0.3)

The scope-changes endpoint is the one new addition (added in 0.3); the rest of the panel is a UI composition over existing data.