Skip to content

Resources and time API

MethodPathDescription
GET/api/v1/resources/List (per-user throttle: 60 req/min)
POST/api/v1/resources/Create
GET/api/v1/resources/{id}/Retrieve
PUT / PATCH/api/v1/resources/{id}/Update
DELETE/api/v1/resources/{id}/Soft-delete (deactivate) — also removes the resource from every project roster; workspace Admin only from 0.4
POST/api/v1/resources/{id}/restore/Reactivate a deactivated resource, restoring the roster rows the deactivation removed — no body; 400 if it is not deactivated; workspace Admin only from 0.4
GET/api/v1/resources/{id}/assignments/Cross-project task assignments for one resource — workspace Admin only from 0.4
POST/api/v1/resources/{id}/rate/Preview (dry_run: true, the default) or save (dry_run: false) the resource’s hourly cost_rate; both return the same re-cost of every affected project — workspace Admin, signed-in session only (an API token gets 403). See Cost model

Creating and updating catalog rows requires the Project Manager or Project Admin role on at least one active project. From 0.4, deactivating and restoring a row, listing the deactivated pool with ?include_deleted=true, and reading assignments/ require the workspace Admin role. Those surfaces reach every project in the installation, and a project role cannot bound them: project creation is deliberately open, so any account can hold Owner on a project of its own.

The resource catalog is readable by any authenticated user, so the email field is gated to prevent org-wide address harvesting. From 0.4 only a workspace Admin receives email on catalog rows (previously any org admin), and a caller always sees their own email (is_me: true). For all other callers the email field is omitted from the payload entirely — absent means withheld, not “this person has no address”. ?search= matches email only for a workspace Admin; everyone else searches by name alone. A per-user throttle of 60 req/min applies to the list endpoint to bound bulk scraping; exceeding it returns 429 Too Many Requests.

The list endpoint’s two project-scoped filters are gated the same way, for the same reason. ?exclude_project=<project id> drops the resources already on that project’s roster, and ?task=<task id> annotates each row with its fit against that task’s skill requirements — both reach through an open catalog read into one project’s data, so both are honored only for members of the project they name. For a non-member the parameter is ignored and the response is identical to omitting it, so neither filter can be used to confirm that a project or task id exists. ?include_deleted=true is likewise honored only for a workspace Admin.

assignments/ returns every task the resource is assigned to, across all projects, ordered by project then task name (soft-deleted tasks excluded; completed tasks included; a deactivated resource still returns its assignments). Because it carries task and project names — project-scoped confidential data that the base catalog read deliberately withholds — from 0.4 it requires the workspace Admin role; every other caller, project admins included, receives 403 Forbidden. For the membership-scoped view of one person’s assignments, use GET /api/v1/task-resources/?resource=<id>, which needs no elevated role. It is a read-only projection: no utilization score, no overallocation flag, and no cross-program rollup. Each row carries:

FieldTypeDescription
idUUIDAssignment (allocation) id
taskUUIDTask id
task_namestringTask name
projectUUIDProject id (client group key)
project_namestringProject name
statusstringTask status
percent_completenumberTask completion percentage
unitsdecimalAllocated fraction of the resource’s capacity (0.5 = 50%)
MethodPathDescription
GET/api/v1/task-resources/List
POST/api/v1/task-resources/Assign
GET/api/v1/task-resources/{id}/Retrieve
PUT / PATCH/api/v1/task-resources/{id}/Update
DELETE/api/v1/task-resources/{id}/Remove

Writes on this route require Resource Manager (Scheduler) or above — it is the allocation-management surface. To assign an owner while composing a task, use the task write’s owners field below, which takes the authority of the task write itself.

POST /api/v1/tasks/ and PATCH /api/v1/tasks/{id}/ accept a write-only owners array that creates TaskResource rows in the same request:

{
"name": "Draft the migration plan",
"owners": [{ "resource": "8e2b…", "units": "0.5" }]
}
FieldTypeNotes
resourceuuidMust be on the destination project’s roster (/project-resources/). An id outside it is a 400 on the owners field — never a silent drop, and never a match-or-create against the workspace-wide resource library.
unitsdecimalFraction of full capacity, 0.01–2.0 (0.5 = 50%). Defaults to 1.0.

The array is capped at 100 entries per task write. The cap counts entries, not distinct resources: repeating a resource id is legal and meaningful (see the audit note below), and each repeat spends one of the 100. A longer list is refused with 400 before any roster lookup runs, under owners → non_field_errors:

{
"owners": {
"non_field_errors": [
"A task write may name at most 100 owners. Remove duplicate resource ids (naming the same resource twice only records an extra units change), or split the assignment across several task writes — owners are upserted, so a later write never removes an owner named by an earlier one."
]
}
}

Splitting is always safe because the field upserts: no later write removes an owner named by an earlier one. The cap is a bound on one write, not on a task — a task can still accumulate more than 100 owners across several writes.

Every surface that validates a task through this serializer inherits the cap:

SurfaceHow the refusal reaches you
POST /api/v1/tasks/, PATCH /api/v1/tasks/{id}/the 400 above
POST /api/v1/projects/{id}/tasks/bulk/207 with the row in rejected[], code: "invalid" and the same sentence in message. Bounded at 100 owners per operation on top of the endpoint’s own 500-operation cap
Offline-sync push (POST /api/v1/projects/{id}/sync/)a pushed task row carrying more than 100 owners is refused like any other row the task serializer rejects

The per-operation/per-row cap is not the only bound on these two batch surfaces. POST /api/v1/projects/{id}/tasks/bulk/ builds one task serializer per operation — up to 500 of them — so the 100-per-row cap alone still let one request compose 500 × 100 = 50,000 owner entries. Both batch surfaces also enforce a batch-wide budget, summed across every operation/row in the request, independent of the per-row cap:

SurfaceBatch-wide capRefusal shape
POST /api/v1/projects/{id}/tasks/bulk/500 owner entries total across operationsWhole-request 400 before any operation applies — never a partial 207, because the budget is spent across the batch and there is no single operation to blame
Offline-sync push (POST /api/v1/projects/{id}/sync/)500 owner entries total across the created/updated bucketsWhole-request 400 before the write transaction opens, alongside the existing row-count cap

A batch under both the per-row and the batch-wide cap on either endpoint also fires only one tasks_bulk_mutated WebSocket event for the whole request — an inline owners write no longer fires its own assignment_* event on POST /api/v1/projects/{id}/tasks/bulk/ or the offline-sync push, because each endpoint’s own tasks_bulk_mutated already covers every task id its batch touched. Only the single-task REST write (POST /api/v1/tasks/, PATCH /api/v1/tasks/{id}/) still fires assignment_* per changed assignment — it has no coarser event of its own to fall back on.

Semantics worth pinning down:

  • Write-only. The read projection is the nested assignments array on the task.
  • Upsert, not replace-set. Naming a resource already assigned updates its units; naming a new one adds it. Owners not listed are left alone, so a one-owner write can never delete a co-assignee. [] is a no-op, not “remove everyone” — removal goes through DELETE /api/v1/task-resources/{id}/.
  • Authority is the task write’s. owners adds no permission class: it is gated by whatever gates the surrounding create or update.
  • Never sets assignee. Task.assignee is the legacy quick-assign field and carries no units; every capacity, utilization, heat-map and sprint-capacity computation reads TaskResource only. owners is the field that makes assigned work count.
  • Assigned resources are auto-added to the project roster, so an owner is never assigned yet invisible in Team → Roster.
  • A summary task rejects an inline owner (400) — summary rows roll up from children.

See ADR-0774.

MethodPathDescription
GET/api/v1/project-resources/List the roster (filter: ?project=)
POST/api/v1/project-resources/Add a resource to a project’s roster (Resource Manager+)
GET/api/v1/project-resources/{id}/Retrieve
PUT / PATCH/api/v1/project-resources/{id}/Update (Resource Manager+)
DELETE/api/v1/project-resources/{id}/Remove from roster (Resource Manager+)
DELETE/api/v1/project-resources/{id}/?force=trueForce-remove and cascade-delete the resource’s task assignments

A roster entry carries units_override, a per-project capacity override, and the read-only effective_max_units it resolves to (units_override when set — 0 included — else the resource’s catalog-wide max_units).

From 0.4 effective_max_units will be the denominator behind GET /projects/{id}/utilization/ (max_units, load_pct, load_band, overallocated), /resources/heatmap/, /resources/summary/, /resource-allocation/ (max_units), the overallocation items on /projects/{id}/attention/, Task.assignee_is_overallocated, the resource_overallocated warning on POST /task-resources/, and GET /sprints/{id}/capacity/. Cross-project reads keep Resource.max_units — see the note under Programs above.

From 0.5 the over-allocation reads that key on a person will measure the load of the resources linked to that person through Resource.user, and will count an open task whose only assignment signal is Task.assignee (no TaskResource row) as a full-time estimate, as the assignment_not_unit_tracked warning already does. Task.assignee_is_overallocated will be accompanied by assignee_load_includes_estimate, which is true when that figure includes such an estimate; the overallocation items on /projects/{id}/attention/ will say so in their detail.

A plain DELETE returns 409 Conflict with code roster_has_assignments if the resource has live task assignments on the project; the response body lists the affected_tasks, a sample of task_names, and the assignment_count. Passing ?force=true cascades the deletion to the resource’s TaskResource rows on the project and triggers a CPM recalculation for the affected tasks, returning 200 with cascaded_assignment_count. All write and delete operations require the Resource Manager role or higher on the project.

Deactivating a resource (DELETE /api/v1/resources/{id}/) removes it from every roster: the list no longer returns its row, and POST refuses the resource with 400. POST /api/v1/resources/{id}/restore/ puts back exactly the rows the deactivation removed — a membership already removed by hand stays removed. Task assignment rows are retained throughout, so assignment history survives an off-boarding; it is the roster and every capacity read that drop the person.

From 0.4, every write on /api/v1/project-resources/, /api/v1/task-resources/ and /api/v1/task-skill-requirements/ — create, update, delete, and the ?force=true cascade — is refused with a 403 when the project is archived, at every role including Owner. Reads are unaffected. Before 0.4, those writes still succeeded on an archived project.

MethodPathDescription
GET/api/v1/projects/{project_id}/teams/List a project’s teams
GET/api/v1/teams/{team_id}/members/List a team’s roster
PATCH/api/v1/teams/{team_id}/members/{id}/Change a member’s role/facets

This release ships the read + role/facet-patch slice only; team create/delete and the team activity feed are tracked for a later release (#599). See Multi-team lens for the UI this powers.

/api/v1/skills/, /api/v1/resource-skills/, and /api/v1/task-skill-requirements/ are documented alongside the rest of the resource catalog in Resources — see that page for the full CRUD surface and the skill-match warning codes.

/api/v1/resource-skills/ lists tags for active resources only. A deactivated resource’s catalog row is already admin-only, and its skill tags follow it: they leave the list for every caller, and POST refuses the resource with 400. An org admin still sees them expanded on the resource itself via GET /api/v1/resources/?include_deleted=true.

Logging time requires Team Member role or above on the task’s project (can_log_time); a Viewer who reads a task sees can_log_time: false. Every entry is owned by the logged-in user — the owner is server-set and cannot be supplied in the request body. Each contributor sees only their own hours; there is no cross-contributor rollup in the community edition.

MethodPathDescription
POST/api/v1/tasks/{task_pk}/time-entries/Log time against a task (minutes 1–1440, optional entry_date, note); Member+
GET/api/v1/tasks/{task_pk}/time-entries/The caller’s own entries on the task plus total_logged_minutes; Viewer+ (theirs may be empty)
PATCH/api/v1/me/time-entries/{id}/Edit minutes / entry_date / note — author only (others get 404)
DELETE/api/v1/me/time-entries/{id}/Soft-delete an entry — author only
GET/api/v1/me/time-entries/?from=&to=Weekly cross-project rollup (results + totals.by_day / by_cell / today_minutes / week_minutes); defaults to the current week
GET/api/v1/me/timer/The caller’s running timer with server-computed elapsed_seconds / stale, or {active: false}
POST/api/v1/me/timer/start/Start a timer ({task, note?}); Member+ on the task’s project, 403 if it’s archived. A second start atomically stops and logs the running timer first, returning it as finalized_entry — unless that timer’s own project is archived or your access there has lapsed, in which case it’s discarded (finalized_entry: null) rather than logged
POST/api/v1/me/timer/stop/Stop the running timer and log it as a TimeEntry (source: "timer"); 409 if no timer is running, or if the timer’s project is archived or your access there has lapsed — the timer is discarded, never finalized, and never answers 403 (there’s no other way to clear a stuck timer)

A manual entry_date cannot be in the future, nor older than the backdate window (TRUEPPM_TIMETRACKING_BACKDATE_DAYS, default 60 days). A timer left running past the stale ceiling (TRUEPPM_TIMETRACKING_TIMER_MAX_MINUTES, default 600) is flagged stale: true, and on stop its logged minutes are capped at the ceiling rather than the raw elapsed time. Both settings ship under the TRUEPPM_ prefix in 0.5; 0.4 reads them without the prefix (TIMETRACKING_BACKDATE_DAYS, TIMETRACKING_TIMER_MAX_MINUTES).

Time cannot be logged against a phase (a task with structural children — see Phase rollup locks): a phase rolls up the logged time of its child tasks, so a direct entry would double-count. Logging time or starting a timer on a phase returns 400 with code time_log_on_phase.