System Health

TruePPM runs scheduling, notifications, webhooks, MS Project imports, and retention purges as background work — jobs that run outside the request that triggered them, via Celery (the worker processes that do the work), Celery Beat (the single scheduler process that dispatches jobs on a timer), and a transactional outbox (a database table of pending jobs that survives a crash between “the triggering change committed” and “the job actually ran”). The System Health console gives a workspace operator a view of that machinery, and the actions to drain its dead-letter queue, without shelling into the cluster or scraping Prometheus by hand. Reach for this page first whenever something that should have happened automatically — a schedule recompute, a notification email, a webhook delivery — appears not to have.

Find it at Settings → Workspace → System health.

The landing page is live: it refreshes every 10 seconds while the tab is focused. Force refresh reloads immediately; Open runbook links to this page.

Five cards summarize the durable-execution layer. Each shows a status dot — green (healthy), amber (needs attention), red (broken), or a gray hollow ring (not measured).

ComponentWhat it watchesHealthy means
Outbox dispatcherCPM + workflow transactional outbox rowsno dead rows, nothing stuck dispatched > 10 min
Celery Beatthe Beat heartbeat singletonheartbeat younger than the stale threshold
Dead-letter alertingpermanently-failed Celery tasksno parked (dead) tasks
Notification dispatcheroutbound email deliveryno permanent failures in the last hour, no aging queue, credential usable
Retention purgethe most recent purge runlast run succeeded (ok)

Notification dispatcher. The card watches three independent signals, so a dead SMTP relay cannot go unreported:

StateWhat it means
crit — Credential unusableAn SMTP transport is configured but its stored password cannot be decrypted. No mail is leaving the workspace; sends fail closed rather than rerouting to the server-default transport. Re-enter the password at Settings → Workspace → Email.
crit — Delivery failingMail permanently failed in the last hour with zero deliveries in the same window. This is what a refusing or unreachable relay looks like.
warn — N failedSome mail permanently failed while other mail got through — usually a specific undeliverable recipient, not a broken relay.
warn — N queuedEmails have been queued more than an hour past creation, so sends are not completing at all: check the Celery worker and beat.
ok — DrainingNo failures, no aging queue, credential usable.

The same signals are exported for alerting at GET /api/v1/health/email/; see Outbound email.

Retention purge. The card reports the outcome of the most recent purge run — ok, partial, or failed. Before any run has been recorded it shows a gray hollow unknown (“not measured”) state rather than an error. Configure windows, schedule, and on-demand runs at System health → Retention & purge (see Retention).

The heartbeat panel shows seconds since the last recorded beat and the stale threshold (TRUEPPM_BEAT_STALE_SECONDS, default 120 s). Below it, the Scheduled tasks table lists every job Beat runs and its cadence (e.g. every 30s, daily 04:00 UTC), grouped by category (heartbeat, drain, purge, snapshot).

This list is the configured schedule, not per-task last-run status — TruePPM tracks a single global heartbeat, not per-task execution times. Overall Beat liveness is answered by the seconds-since-beat figure; if Beat dies, every drain and purge stops, so a stale heartbeat is the signal that matters.

The dead-letter card shows the parked count, the age of the oldest parked task, the most common failure cause, and an Open inspector link. The retention card shows the current per-table retention windows (read-only here) with a Manage retention link to the editor, where admins tune windows, schedule, and on-demand runs; see Retention and ADR-0081.

Reached from the overview’s Open inspector link. A split view over permanently-failed Celery tasks (the FailedTask records that back Dead-letter Alerting) — inspect a task on the left/detail, then requeue or drop it — a 0.4 action, see Triaging dead-lettered tasks.

  • Filter by status, task name (substring), and time window; sorted newest-failure-first.
  • Detail pane for a selected task:
    • Attempt summary — failure count, first/last failed timestamps, exception type. TruePPM records a single failure count, not a per-attempt log, so this is a summary rather than a blow-by-blow retry history.
    • Last error — exception type, message, and the full traceback (collapsible).
    • Payload — the pretty-printed task args and kwargs.

From the detail pane you can act on a parked task. Both actions require a workspace operator account (see Access above), and each opens a confirmation before it runs.

  • Requeue re-enqueues the original task with its stored args/kwargs after an operator-chosen backoff (immediately, or in 5 minutes / 30 minutes / 1 hour). The requeue does not re-dispatch on a side channel — it round-trips through the durable workflow backend, so a broker outage at the moment you click cannot silently lose the re-enqueue (the workflow outbox drain re-dispatches it). Only dead and pending_retry tasks are requeueable. The backoff is applied as a best-effort delay on the re-dispatched task; the guarantee that the re-enqueue happens is durable, while the delay itself is not yet durable across a broker restart.

  • Drop removes a parked task from the active queue with an optional note. A drop is a soft remove: the task moves to dismissed and the record — including the note, the operator, and the timestamp — is retained for audit (nothing is hard-deleted; see the “no silent discards” principle in Dead-letter Alerting). Dropped rows are reclaimed by the normal retention purge.

The audit line for a requeued or dropped task (who, when, and any drop note) appears in the detail pane once the action has run.

The list header offers Requeue all and Drop all, which apply the same action to the current filter set — for example, filter by task name to “all seven tasks routed to the vendor relay” and requeue them in one confirmation. Bulk actions are bounded: each run processes up to a fixed maximum (500 by default, set with TRUEPPM_FAILED_TASK_BULK_ACTION_MAX), oldest-first, so a “drop all” over a large parked queue cannot overload the database. When more tasks match than the cap, the result reports how many were processed and that the batch was capped — repeat the action to continue.

The bound is the Django setting FAILED_TASK_BULK_ACTION_MAX, which reads the TRUEPPM_FAILED_TASK_BULK_ACTION_MAX environment variable. Set the environment variable — the setting name has no TRUEPPM_ prefix and is not read from the environment under that spelling.

The console is API-first; every surface is workspace-operator-only (IsWorkspaceOperator):

  • GET /api/v1/health/system/ — the aggregated overview payload (component statuses, Beat panel, configured schedule, dead-letter summary, retention config).

  • GET /api/v1/admin/failed-tasks/ — the dead-letter list, filterable with ?status=, ?task_name=, ?failed_after=, and ?failed_before=.

  • GET /api/v1/admin/failed-tasks/{id}/ — a single failed-task record, including its payload, traceback, and (once acted on) the resolution_note / resolved_at audit.

  • GET /api/v1/admin/workflows/ and GET /api/v1/admin/workflows/{id}/ — workflow instances (filter with ?status= and ?name=), with a terminal flag, a retrying flag, and the latest step’s attempt count, next_attempt_at, failure_reason, and error. These two endpoints ship in 0.5.

The first three read endpoints above shipped in 0.4; the two workflow endpoints ship in 0.5. The four write endpoints below shipped in 0.4.

  • POST /api/v1/admin/failed-tasks/{id}/requeue/ — re-enqueue the task through the durable workflow backend with an optional { "backoff_seconds": N } (0–86400). The response is the task record plus a workflow_id. A task that is no longer dead or pending_retry is refused with a 400.

  • POST /api/v1/admin/failed-tasks/{id}/drop/ — soft-remove the task (→ dismissed) with an optional { "note": "…" }.

  • POST /api/v1/admin/failed-tasks/requeue-all/ and .../drop-all/ — the bulk actions over the current filter set (same query params as the list); bounded, returning { processed, matched, capped }.

See the API reference for full schemas.

  • Dead-letter Alerting — the structured alert log and Prometheus gauge this UI complements.
  • Retention — the environment/settings the retention summary reflects.
  • Durability & Redundancy — the transactional outbox the dispatchers run, and what survives a pod or node loss.
  • Troubleshooting — the same diagnosis from a shell when the UI is what is down.