Rate limits and import caps
Rate limiting and access
Section titled “Rate limiting and access”| Variable | Default | What it does |
|---|---|---|
TRUEPPM_THROTTLE_GIT_WEBHOOK_IP_RATE | 600/min | Per-IP limit for inbound Git webhooks, in DRF <count>/<period> form. Deliberately high: a monorepo push fans out to many hook deliveries from one address, and throttling them drops commit links silently. Lower it only if webhooks are a load problem. |
TRUEPPM_FAILED_TASK_BULK_ACTION_MAX | 500 | Maximum failed background tasks one bulk retry/discard may act on. Bounds a single admin click’s blast radius on the queue. |
TRUEPPM_PASSWORD_RESET_TIMEOUT | 1800 | Seconds a password-reset link stays valid (30 minutes). Django’s own default is 3 days; this is deliberately much shorter, since the link is a bearer credential sitting in a mailbox. Raise it only if your users routinely hit expiry. |
TRUEPPM_RATE_LIMIT_DISABLE_ACK | (empty) | Acknowledgment sentinel required in addition to TRUEPPM_RATE_LIMIT_ENABLED=false to actually turn throttling off. Without both, limits stay on and the attempt is logged at CRITICAL — a stray env var cannot silently open a DoS path. See disabling rate limiting entirely. |
TRUEPPM_WS_LEGACY_TOKEN_AUTH_ENABLED | false | Re-enables the legacy WebSocket token-in-query-string authentication. Leave off. A query string is logged by proxies, load balancers, and browser history, so the token leaks into places a header never reaches. Only for a client too old to use the ticket flow, and only while you upgrade it. |
TRUEPPM_WS_ALLOWED_ORIGINS | (empty) | Comma-separated extra Origin values the WebSocket handshake accepts, on top of every host in ALLOWED_HOSTS. Use https://app.example.com (scheme and port must match) or a bare .example.com for a domain and its subdomains. Only needed when the web app is served from a different host than the API. A browser handshake from any other origin is refused. A bare * in ALLOWED_HOSTS (production with TRUEPPM_ALLOW_WILDCARD_HOSTS) disables the Origin check, and .example.com admits every subdomain, including any that serve user content. |
TRUEPPM_WS_REQUIRE_ORIGIN | false | A handshake with no Origin header comes from a non-browser client (script, integration), so it is allowed by default. Set true to refuse those too. |
TRUEPPM_WS_MAX_FRAME_BYTES | 8192 | Largest frame a client may send on a project socket. The server defines no client-to-server message, so a larger frame closes the socket with code 1009. |
TRUEPPM_WS_RATE_LIMIT_FRAMES | 30 | Frames one user may send per window across all of their sockets on one project. Going over closes it with code 4029. |
TRUEPPM_WS_RATE_LIMIT_WINDOW_SECONDS | 10 | Length of the sliding window for the frame budget above. The budget is per (project, user) per API worker process, held in memory, so it is not shared between workers. |
General API rate limiting
Section titled “General API rate limiting”TruePPM applies a general default rate limit to every API endpoint that does not declare its own throttle, so a self-hosted instance has baseline protection against runaway clients and resource-starvation abuse. Two tunable rates control it:
| Variable | Default | Applies to |
|---|---|---|
TRUEPPM_THROTTLE_ANON_RATE | 60/min | Unauthenticated requests, bucketed per client IP |
TRUEPPM_THROTTLE_USER_RATE | 1000/min | Authenticated requests, bucketed per account |
TRUEPPM_THROTTLE_READYZ_RATE | 2000/min | The readiness probe (/api/v1/readyz) only, bucketed per client IP — see below |
Both use Django REST Framework’s <count>/<period> syntax, where period is
sec, min, hour, or day (for example 120/min or 5000/hour).
A few behaviors are worth knowing:
/api/v1/health/(liveness) and/api/v1/edition/(the shell’s startup edition read) are exempt. They are never counted, so an orchestrator’s tight liveness loop cannot exhaust the shared limit and trigger spurious pod restarts./api/v1/readyz(readiness) is not exempt — unlike the other two it does a real database and cache round-trip per call, so it gets its own dedicated, generous scope (TRUEPPM_THROTTLE_READYZ_RATE, default2000/min) instead of a full exemption, bounding an unauthenticated caller who reaches the pod IP directly (the probe path bypasses the Ingress) without risking a legitimate, tight readiness loop.- Scoped endpoints replace, not stack. Endpoints with their own stricter limit — login, token refresh, Monte Carlo, and the other scoped throttles — keep only that specific limit; the general default does not add to it.
- Exceeding a limit returns
429 Too Many Requestswith a standardRetry-Afterheader telling the client how many seconds to wait. - Reads that run the scheduling engine have their own, lower limits. The
schedule derivation (
TRUEPPM_THROTTLE_CPM_ON_READ_RATE, 60/min) and the merged program schedule (TRUEPPM_THROTTLE_PROGRAM_SCHEDULE_RATE, 60/min) recompute the critical path on every call. A program schedule read at the 5,000-task program limit took about 470 ms in testing, so one account at 60/min keeps about half a CPU core busy at most. At the general 1000/min limit it would be nearly eight cores. Lower these rates further on small API workers. See Optional and advanced settings.
The throttle count lives in the configured cache (Valkey/Redis in production), so the limit is shared across all API replicas rather than per-process.
Disabling rate limiting entirely
Section titled “Disabling rate limiting entirely”Rate limits tune how fast callers may go; the TRUEPPM_RATE_LIMIT_ENABLED
switch decides whether any throttle applies at all. It exists so a load test — or
a throwaway benchmarking instance — can measure raw throughput without the
per-account limit tripping. It is not for production use.
Turning it off deliberately takes two environment variables, in every environment:
TRUEPPM_RATE_LIMIT_ENABLED=falseTRUEPPM_RATE_LIMIT_DISABLE_ACK=i-understand-this-disables-abuse-protection- Setting
TRUEPPM_RATE_LIMIT_ENABLED=falsealone does nothing. Without the exact acknowledgment string the request is ignored, rate limiting stays on, and the server logs aCRITICALline at startup. A stray flag can never silently remove protection — and it never crashes the app either; it fails toward the protected state. - When both are set, every throttle is bypassed: the general anon/user limits, every scoped endpoint limit, and even the fail-closed offline-sync write-path limit. “Off” means off, with no hidden exceptions.
- It is deploy-time operator config only — there is no in-app toggle, so an
authenticated user can never switch off this protection through the API. While it
is off, the install operator (a Django superuser) sees a persistent red banner
and a card under Settings → System — not every workspace admin, since the
health endpoint the banner reads is operator-only — and the
trueppm.ratelimit.enabledOpenTelemetry gauge reports0, so the state is impossible to miss and easy to alert on.
Never set these on a production-facing deployment. Leave TRUEPPM_RATE_LIMIT_ENABLED
at its default true to keep abuse protection on.
Login brute-force protection
Section titled “Login brute-force protection”The login endpoint (POST /api/v1/auth/token/) is protected by two stacked
throttles — both must pass before credentials are checked, so an attacker is
bounded on two independent axes:
| Variable | Default | Buckets by | What it bounds |
|---|---|---|---|
(fixed) login scope | 10/min | Client IP | Password guessing from a single source address |
TRUEPPM_THROTTLE_LOGIN_ACCOUNT_RATE | 5/min | Account (hashed username) | Guessing against a single account across all source IPs |
The per-account throttle exists because the IP throttle alone only caps guesses
per source address. A distributed credential-stuffing attack that rotates
through a botnet or proxy pool gets the full per-IP allowance from every fresh
IP, so the aggregate guess rate against one account is unbounded. The
account-keyed throttle closes that gap: once the per-account rate is exceeded,
further login attempts for that username return 429 Too Many Requests no matter
how many IPs participate.
- The username is hashed before it becomes a cache key — the raw email or username is never written to the cache backend.
- Both success and failure count toward the per-account bucket, so a normal
interactive user (well under 5 logins/minute) is never affected while an
automated attack is stopped quickly. Tighten or loosen the rate with
TRUEPPM_THROTTLE_LOGIN_ACCOUNT_RATEusing the same<count>/<period>syntax as the general rate limits.
Every rejected login also emits a structured auth.login_failed audit event on
the trueppm.auth logger, carrying the hashed username and client IP (never
the raw credential). Ship this logger to your SIEM to alarm on credential-stuffing
bursts — a spike of failures against one username_hash from many client_ip
values is the distributed-attack signature.
MCP read-surface rate limiting
Section titled “MCP read-surface rate limiting”The MCP server exposes a read-only view of the OSS API to
mcp:read API tokens so an AI agent can query schedules, forecasts, and Monte
Carlo results. Those token reads are rate-limited per token so an agent retry
loop — or a leaked read-only token — cannot burn arbitrary server compute. Two
throttles apply:
| Variable | Default | Buckets by | Applies to |
|---|---|---|---|
TRUEPPM_THROTTLE_MCP_READ_RATE | 120/min | API token | Every MCP-readable endpoint |
TRUEPPM_THROTTLE_MCP_READ_COMPUTE_RATE | 12/min | API token | The compute-heavy reads only |
The compute-heavy reads — what-if, latest Monte Carlo, forecast,
sprint-forecast, the schedule derivation (the “why” behind a computed date), and
the merged program schedule — each run a CPM or Monte Carlo pass per call, so
they stack the tighter mcp_read_compute bucket on top of the baseline mcp_read one.
A token calling one of them is bounded by whichever limit it hits first.
A few behaviors are worth knowing:
- Only token traffic is throttled. Requests authenticated by a human session
or JWT pass through untouched — they remain governed by the general
TRUEPPM_THROTTLE_USER_RATElimit above — so tightening these rates never slows an interactive user browsing the same views. - Each token has its own bucket, keyed on the token’s id. Revoking and re-minting a token starts a fresh window, and two agents holding two tokens neither share nor starve one budget.
- Exceeding a limit returns
429 Too Many Requestswith aRetry-Afterheader, the same as the other scoped throttles.
Both use Django REST Framework’s <count>/<period> syntax. Widen them for a
trusted internal agent fleet, or tighten them under load.
Disabling MCP access entirely
Section titled “Disabling MCP access entirely”Rate limits bound how fast agents read; the TRUEPPM_MCP_ENABLED kill switch
decides whether they can read at all. Set it to false to deny every MCP token
read across the whole instance:
- Every request authenticated by an
mcp:readtoken is refused with403, even though the token still exists and carries the scope — the check is fail-closed and lives at the single guard chokepoint every MCP-readable endpoint shares. - Human session/JWT traffic on the same endpoints is unaffected. The switch
gates only the agent-token (
mcp:read) path, so interactive users and the web client keep working normally. A member’s own full-access (legacy:full) personal access token is unaffected too — it is that person’s credential rather than an agent’s, and it reaches the general API on the same terms as their browser session regardless of this switch. - Each denied read is still recorded in the agent-action audit
log as a
policyrefusal, so you retain a trail of what was attempted while access was off.
The default is true for backward compatibility. Flip it to false when you want
“no agent access on this instance, period” — for a locked-down or regulated
deployment, or as an incident-response lever — then back to true to restore it.
Request body ceilings
Section titled “Request body ceilings”Every request body meets a transport ceiling before any feature cap sees it.
There are three tiers, and the API enforces them itself — a declared
Content-Length over the route’s ceiling is refused with 413 and
code: "request_body_too_large" before authentication or any database work — so
they hold on every topology, including the default Helm routing where /api
goes from the Ingress straight to the API Service:
| Tier | Ceiling | Routes |
|---|---|---|
| default | 2 MB | everything not listed below — including the sign-in, invite-accept, password-reset and share endpoints |
| bulk | 10 MB | offline sync push (/projects/{id}/sync/), task bulk operations (/projects/{id}/tasks/bulk/), inbound task push (/projects/{id}/task-sync/), the seed import and its dry run (/programs/import/, /programs/import/validate/), and the workspace logo |
| upload | 110 MB | task attachments and the MS Project, Jira, CSV/Excel and risk-CSV file imports |
The upload tier raises the ceiling for file parts only. A JSON body on an
upload route is still held to 2 MB, because Django streams uploaded files to
disk past 2.5 MB while it parses a JSON body entirely in memory. The 2 MB
default is also Django’s DATA_UPLOAD_MAX_MEMORY_SIZE.
Each feature’s own cap (MSPROJECT_MAX_UPLOAD_MB, SEED_MAX_UPLOAD_MB, the
100 MB attachment cap, …) sits below its tier and is what normally rejects an
oversized file, with a 400 that names the limit. The tier is the bare 413
above it. The tiers are not configurable: raising a feature cap past its tier has
no effect.
The shipped nginx configs (the Docker Compose templates, the web image’s
nginx.conf, and the Helm web tier) carry the same three tiers as per-location
client_max_body_size values, so an oversized body is usually refused at the
edge first. A test in the API suite parses all four configs and fails if their
locations drift from the API’s table.
MS Project import limit
Section titled “MS Project import limit”MS Project import accepts .mpp and
.xml files. The upload is bounded on three axes, because file size alone does
not bound either the derived object count or the work converting a .mpp creates:
| Variable | Default | Unit | What it bounds |
|---|---|---|---|
MSPROJECT_MAX_UPLOAD_MB | 50 | MB | Maximum size of a single MS Project import upload |
TRUEPPM_MSPROJECT_MAX_ROWS | 20000 | tasks | Maximum tasks (also applied to resources and dependency links) a single import may contain |
TRUEPPM_MPXJ_MAX_OUTPUT_MB | 512 | MB | Ceiling on the XML MPXJ streams to stdout while converting a .mpp to MSPDI XML |
TRUEPPM_MPXJ_MAX_HEAP_MB | 512 | MB | JVM max-heap (-Xmx) for the MPXJ conversion subprocess |
This cap was raised from a previously hardcoded 10 MB. An import is read fully into memory and stored base64-encoded in a single database row (about +33%), so a 50 MB upload already costs roughly 67 MB of memory and row size — keep the limit close to the practical MS Project file ceiling rather than maximizing it.
The byte cap alone does not bound the object graph a request can materialize.
A 50 MB MSPDI XML file can encode roughly a million tasks, and the importer builds
one Task object per row, computes the WBS over all of them, then bulk-creates the
lot — a worker-memory / transaction-time denial-of-service that the byte ceiling
alone does not stop. TRUEPPM_MSPROJECT_MAX_ROWS rejects the import outright once the task
count (or resource or dependency-link count) exceeds it, rather than partially
processing an oversized file. 20,000 tasks is far above any realistic
hand-authored schedule.
Converting a .mpp is a bigger risk than parsing MSPDI XML. MS Project’s
binary .mpp format is converted to XML by an external MPXJ (Java) subprocess. A
decompression-bomb .mpp, still comfortably inside the 50 MB upload cap, can
expand to multi-gigabyte XML — buffering that unbounded would OOM the worker.
TRUEPPM_MPXJ_MAX_OUTPUT_MB streams the subprocess’s stdout and aborts past this many
bytes; TRUEPPM_MPXJ_MAX_HEAP_MB is a second line of defense that bounds the JVM’s own
heap, so even a bomb the byte ceiling hasn’t yet caught dies with a JVM
OutOfMemoryError (a clean non-zero exit) rather than driving the host into swap.
The import paths (below) share these knobs. IMPORT_MAX_RESOURCES_CREATED applies to
CSV/Excel and MS Project imports only, not Jira:
| Variable | Default | Unit | What it bounds |
|---|---|---|---|
TRUEPPM_IMPORT_BULK_BATCH_SIZE | 500 | rows | batch_size for the shared importer’s bulk_create() calls |
IMPORT_MAX_RESOURCES_CREATED | 200 | resources | New workspace resources one import may create for people who match nobody on the project’s roster or members; the rest get a warning and no row |
Without a batch_size, Django would emit one giant multi-row INSERT that pins
the whole task/dependency set in a single statement (and can exceed PostgreSQL’s
parameter limit); chunking bounds the per-statement memory and parameter count.
# Allow MS Project imports up to 80 MB. Must stay under the 110 MB upload tier.MSPROJECT_MAX_UPLOAD_MB=80Imported files are stored base64-encoded in an ImportRequest row only until
the import is processed, then purged on the schedule set by
TRUEPPM_IMPORT_RETENTION_DAYS (default 7 days). See
Outbox & Record Retention to tune that window.
Jira import limit
Section titled “Jira import limit”Jira import accepts a Jira Server / Data Center XML
export (.xml only). Like MS Project import, it is bounded on both size and
row count:
| Variable | Default | Unit | What it bounds |
|---|---|---|---|
TRUEPPM_JIRA_IMPORT_MAX_UPLOAD_MB | 25 | MB | Maximum size of a single Jira XML import upload |
TRUEPPM_JIRA_IMPORT_MAX_ROWS | 20000 | issues | Maximum issues a single Jira XML import may contain |
The size default is lower than the MS Project cap because a Jira issue export is typically small and, like the MS Project importer, an upload is read fully into memory and stored base64-encoded in a single database row (about +33%) until the import is processed. Files larger than the cap are rejected with HTTP 400 before any parsing happens.
TRUEPPM_JIRA_IMPORT_MAX_ROWS exists for the same reason as TRUEPPM_MSPROJECT_MAX_ROWS above:
the byte cap does not bound the derived task count, and every issue becomes a
Task object built and bulk-created through the same shared importer
(msproject.importer.import_project). An import past the row cap is rejected
outright.
# Allow Jira XML imports up to 40 MB. Same edge cap as MS Project imports: keep it# under the 110 MB upload tier, or the request is refused before the importer.TRUEPPM_JIRA_IMPORT_MAX_UPLOAD_MB=40The Jira XML parse goes through defusedxml (no entity expansion, no
external-entity resolution), so an XXE / billion-laughs payload is rejected at
parse time — the same unconditional protection the MS Project importer has.
CSV / Excel import limits
Section titled “CSV / Excel import limits”CSV / Excel import is bounded on three axes, because size alone does not bound the work an upload creates:
| Variable | Default | Unit | What it bounds |
|---|---|---|---|
TRUEPPM_CSV_IMPORT_MAX_UPLOAD_MB | 10 | MB | Maximum size of a single .csv / .xlsx upload |
TRUEPPM_CSV_IMPORT_MAX_ROWS | 5000 | rows | Maximum data rows parsed from one file |
TRUEPPM_CSV_IMPORT_MAX_UNCOMPRESSED_MB | 100 | MB | Maximum uncompressed size an .xlsx may declare |
The size cap is much lower than the MS Project one on purpose: a spreadsheet migration is a hand-maintained sheet, not a generated plan, and 10 MB is already far past what a real one weighs. Like the other importers, an upload is read fully into memory and stored base64-encoded in a single database row (about +33%) until it is processed.
The row cap is a separate limit for a reason: a 10 MB CSV can encode well over a million short rows, and the parser builds one task object per row before anything is written. Rows past the cap are reported back to the operator as skipped rather than silently dropped, so an import is never quietly partial.
# Allow larger sheets. Keep the upload cap under the 110 MB upload tier,# or the request is refused before the importer sees it.TRUEPPM_CSV_IMPORT_MAX_UPLOAD_MB=25TRUEPPM_CSV_IMPORT_MAX_ROWS=20000TRUEPPM_SCHEDULE_TASK_CEILING (default 1000) is not a fourth bound here — the three
limits above reject or truncate; this one never does. It is the Schedule’s own
tested-comfortable task count, and the import
preview compares your existing task count plus this file’s tasks against it purely to
warn, not to gate the commit. Raising TRUEPPM_CSV_IMPORT_MAX_ROWS does not raise this — they
answer different questions (“how big a file will the parser accept” vs. “how big a
project stays comfortable to open”), and a file well under the row cap can still carry a
project past it.
Why .xlsx has a third limit
Section titled “Why .xlsx has a third limit”An .xlsx file is a zip archive of XML. TruePPM parses it with openpyxl,
which automatically enables defusedxml hardening (no entity expansion, no
external-entity resolution) because defusedxml is installed — so XXE and
billion-laughs payloads are rejected at parse time.
That protection does not bound decompression. A 1 MB upload can inflate to
gigabytes and exhaust worker memory while sitting comfortably inside the byte
cap. Before parsing, TruePPM sums the sizes declared in the zip’s central
directory and rejects anything above TRUEPPM_CSV_IMPORT_MAX_UNCOMPRESSED_MB. The check
reads no member data and runs before any XML parser is invoked.
Seed import limit
Section titled “Seed import limit”A JSON program seed
(POST /programs/import/, ADR-0109) has its own, much smaller size cap:
| Variable | Default | Unit | What it bounds |
|---|---|---|---|
SEED_MAX_UPLOAD_MB | 5 | MB | Maximum size of a single JSON program seed payload |
TRUEPPM_SEED_IMPORT_MAX_CONCURRENT_JOBS | 3 | jobs | Seed imports one account may have queued or running at once. 0 disables the bound. |
Seeds are bounded relative to the other importers because they are a different
kind of payload: the largest bundled sample seed is a few hundred KB, so 5 MB is
generous headroom while still bounding the memory a single authenticated import
request can consume. The ceiling is enforced on both request shapes — a
multipart/form-data upload and a raw JSON body — so it cannot be sidestepped by
posting the document as the body. It is measured against the bytes that actually
arrived rather than a declared Content-Length, which a chunked request may omit;
a declared length over the cap is refused before a byte is read. Both shapes sit on
the 10 MB bulk tier, so SEED_MAX_UPLOAD_MB must stay
below 10. See
general API rate limiting
above for the separate TRUEPPM_THROTTLE_SEED_IMPORT_RATE /
TRUEPPM_THROTTLE_SEED_VALIDATE_RATE throttles that bound how often a caller
may hit this endpoint, independent of payload size.
TRUEPPM_SEED_IMPORT_MAX_CONCURRENT_JOBS bounds a third, independent thing: how many
imports one account may have outstanding. The rebuild runs on a worker, so
the rate throttle alone lets a caller keep adding full subtree builds to the
queue at its permitted rate without ever waiting for one to finish. Over the cap
the endpoint answers 429 with code: seed_import_concurrency_limit, which —
unlike a throttle 429 — is cleared by an outstanding import finishing rather
than by waiting out a window. Raise it if your operators legitimately run
imports in parallel; set it to 0 to leave the rate throttle as the only limit.
The seed document itself is bounded field by field as well as in total: prose
fields (description) accept up to 100,000 characters and narrative fields
(notes, goal, trigger, contingency) up to 10,000, and the top-level
accounts, calendars, resources and risks collections carry item ceilings.
These are schema-level and not configurable; a document that exceeds one is
rejected with a 400 naming the field.
Monte Carlo simulation caps
Section titled “Monte Carlo simulation caps”The Community (OSS) tier bounds Monte Carlo risk analysis with the caps below. Like the email settings above, these are Django settings constants, not environment variables — override them in a Django settings module; setting bare env vars of the same name has no effect. The Enterprise edition raises or removes them.
| Setting | Default (OSS) | What it bounds |
|---|---|---|
MC_SIMULATION_CAP | 1000 | Maximum simulation runs (iterations) per request. The Monte Carlo run endpoint rejects an n_simulations above this. |
MC_TASK_CAP | 5000 | Largest project — by task count — Monte Carlo will run on. The vectorized NumPy path handles 5000 tasks × 1000 runs in a few seconds; a larger project is refused rather than run unbounded. |
MC_LAG_DELTA_CELL_CAP | 5000000 | Ceiling on the lag-delta table one Monte Carlo simulation may build: distinct dependency type/lag combinations × the project’s working-day span, at 4 bytes per cell (5M cells is about 20 MB). A project with too many distinct lag values for its span is refused with HTTP 400 rather than allowed to spike worker memory. Set to None to fall back to the scheduler library’s 50M-cell default. |
MC_CELL_CAP | 2500000 | Ceiling on runs × tasks for one simulation. The two caps above bound each dimension, but memory and run time follow their product: a 5,000-task × 1,000-run simulation (5M cells) peaks around 234 MB of NumPy working set (about 336 MB of process memory) in the process that runs it — the API process in 0.4, which also serves every WebSocket; from 0.5, a Celery worker for a forecast run and still the API process for a what-if, which runs two in a row. At 2.5M cells, a project of up to 2,500 tasks still gets the full 1,000 runs, and a 5,000-task project gets 500. When n_simulations is omitted, the run uses the largest count that fits, and the response’s n_simulations field reports the count actually simulated (runs carries the same value and is deprecated). An explicit n_simulations above that count is refused with HTTP 400 (simulation_cell_cap_exceeded, carrying max_runs; on the failed task run for a forecast run from 0.5, in the response for a what-if), never quietly reduced. Set to None for no product cap. |
MC_MAX_CONCURRENT | 2 | Monte Carlo simulations one process runs at once. Concurrent requests run on separate threads, so without a bound their memory stacks. A request waits up to 10 seconds for a free slot, then gets HTTP 503 (simulation_busy) with a Retry-After header. The limit applies per process, so N API workers admit up to N × this value. Ships in 0.5: the forecast run moves to a Celery worker, where a prefork child runs one simulation at a time and never waits on this slot; there the worker’s own concurrency (--concurrency, shared with CPM recalculation, imports and email) is what bounds simultaneous simulations, and this setting will bind only the what-if, which still runs in the API process. Set to None for no limit. |
MC_WALL_CLOCK_BUDGET_SECONDS | 15.0 | Ships in 0.5. Wall-clock budget, in seconds, for one simulation. The caps above bound cost through the cell count, which tracks run time on a healthy host but not on a slow one or with an unusual calendar. Past the budget the simulation stops at its next phase boundary and is refused with HTTP 503 (simulation_time_exceeded, on the failed task run for a forecast run) with no Retry-After header; retry with a smaller n_simulations. A what-if shares one budget across its two runs. The 10-second slot wait above is not counted. Set to None for no limit. The budget needs the scheduler bundled in the API Docker image or trueppm-scheduler 0.5 or later: the trueppm-api package pins trueppm-scheduler>=0.4.0,<0.5, and on a 0.4 scheduler this setting has no effect. |
TRUEPPM_TASK_RUN_REAP_MARGIN_SECONDS | 120 | Ships in 0.5. Seconds added to a task’s own Celery time_limit before the five-minute stale-run sweep marks a pending or running task run failed because its worker was killed or lost (a forecast run gets simulation_abandoned, HTTP 503 in result_summary). The sweep covers five task types: Monte Carlo, schedule recalculation, and the MS Project, Jira, and CSV imports; every type except Monte Carlo is marked with the error task_abandoned. A pending run that has waited in the queue longer than the limit plus the margin is reaped too, and a worker that outlives the sweep does not overwrite the run it marked failed. |
MC_HISTORY_CAP | 100 | Forecast-history rows kept per project. The nightly purge trims each project to its newest MC_HISTORY_CAP MonteCarloRun rows. |
Set any cap to None for unlimited — the Enterprise default, where unbounded
forecast history plus cross-program rollup is part of the portfolio tier.
MC_CELL_CAP and MC_MAX_CONCURRENT are the exception. They protect the API
worker’s memory rather than gating a tier, so size them to your hardware. In the
measured 5M-cell run, the NumPy working set was about 234 MB (about 47 bytes per
cell), and the process’s peak resident memory was about 336 MB (about 67 bytes per
cell). Container memory limits
apply to resident memory, so size against the larger figure: keep MC_CELL_CAP ×
67 bytes × MC_MAX_CONCURRENT well inside the API container’s memory limit,
leaving room for everything else the worker holds.
Operators on constrained hardware can lower MC_TASK_CAP to keep simulations
cheap.
# settings override — raise the task ceiling for a large-project deployment.MC_TASK_CAP = 10_000