Computed, not guessed
Every date and forecast is calculated by the engine, with the derivation to show for it; a language model may ask your schedule but never invents your dates.
This is the one principle TruePPM states positively rather than as a line against something — because it is the architectural commitment the other three rest on.
The stance
Section titled “The stance”Every incumbent is bolting a language model onto a project database and letting the model guess dates. TruePPM takes the opposite stance: an AI-surfaced answer is never the model’s opinion — it is a CPM or Monte Carlo computation the engine performed, carrying a server-side derivation you can cite. The model’s only job is to translate a question into an engine call and to phrase the engine’s answer back in natural language. It never supplies the number.
Compute, cite, refuse, reproduce
Section titled “Compute, cite, refuse, reproduce”“Computed, not guessed” is one capability with four parts — the contract every AI-facing surface honors, described with the same four verbs everywhere so it reads as one capability, not a scattered feature list:
- Compute — an AI client gets an answer the engine calculated (critical path, a P80 date, a non-mutating what-if), never a number the model made up.
- Cite — every computed value carries a server-side derivation the agent quotes instead of asserting: “P80 is Oct 22, derived from this critical chain.”
- Refuse — the engine rejects any change that would violate the plan’s own rules — an impossible dependency, a cycle, a broken rollup — and it refuses identically for a human and an agent. There is one rulebook, not a softer one for automation.
- Reproduce — what an agent read, and the refusals it was handed, are attributable and
re-derivable: each one appends a row to a hash-chained agent-action log recording the
acting token, the accountable human behind it, the capability used and the verdict — and
manage.py audit_verifyre-derives the whole chain on your own instance. What that chain covers today is stated precisely below; it is narrower than “everything that happens in TruePPM”, deliberately.
The arc is the whole point. An agent that can only compute, cite, be refused, and reproduce cannot quietly corrupt the record — it never supplies a number the engine did not compute, and never commits a change the engine did not allow. The 0.4 beta closed that arc the strongest way available: the agent surface ships read-only, so there is no agent write to corrupt anything with. The gated write path (0.5 – 0.6) is where the arc has to hold under mutation, and it is being built against the same rulebook.
What the reproduce chain records today
Section titled “What the reproduce chain records today”Precision here matters more than a bigger claim, because this is the sentence a governance buyer will test in a demo.
Recorded. Every request made with an mcp:read-scoped API token — the read the
MCP server performs — appends one row, whether it was allowed or
refused, and so does every rejection of a revoked, expired or deleted token. Each row is
hash-chained to its predecessor, so a removed or altered row breaks the chain that
audit_verify recomputes.
Not recorded. A human working in the UI is not an agent and is not in this log — that is
deliberate, not a gap. Neither are calls made with a
broadly-scoped legacy token, which is why an agent integration should be given an
mcp:read-scoped token and not a general one. Engine feasibility refusals — the cycle and
infeasible-dependency rejections under Refuse above — are enforced for every caller but
leave no agent-action row; they join the chain with the gated write surface, when there is a
proposed change worth recording the refusal of.
Inside the hash, and outside it. The verdict, the refusal reason, the actor, the capability, the payload fingerprint and the timestamp are all inside the hashed body. The finer constraint code and the projected impact of a refusal ride alongside as a non-hashed side-car — an explicit, documented trade-off (ADR-0421) that keeps the chain format stable while the write-side producers are still being built, and one we would rather state than let you discover. A signed engine-version and input-hash stamp on each answer is a separate piece of work and follows at 0.9.
Why it holds
Section titled “Why it holds”It is an architectural commitment, not a feature toggle. It holds because of three design choices TruePPM already makes:
- The scheduling engine is a separate, deterministic package (
trueppm-scheduleron PyPI) — the same math draws the Gantt, answers the API, and answers an agent. - Every feature is an API fact first. If a value is computed server-side and reachable over the API, an agent can retrieve it and cite it; if it lived only in a chat prompt, the agent could only guess at it.
- Refusal is enforced in the engine, for every caller. Feasibility, RBAC, and the read-only guards sit below the API, so a human write and an agent write hit the same checks — the refusal is not a policy bolted onto the agent, it is a property of the record.
The human stays in the loop: the engine computes, the AI translates and explains, and the human decides.
Where the line falls — OSS vs Enterprise
Section titled “Where the line falls — OSS vs Enterprise”The engine’s ability to refuse is never Enterprise-gated. The feasibility checks, RBAC, the read-only guards, and the agent-action audit chain are all Apache-2.0: the first three apply identically to every caller, and the chain records agent calls for every self-hoster on the same terms — a self-hosted team gets the full compute / cite / refuse / reproduce contract with no paid tier and nothing withheld behind a licence check. The Enterprise overlay is governance at scale: signed compliance-evidence bundles, retention and legal hold, cross-team approval chains, and org policy — the things an organization adds on top of an already-grounded practice, never the grounding itself.
For the compliance-minded evaluator
Section titled “For the compliance-minded evaluator”Two ideas live here, one scroll down, because they matter to a governance buyer and would only distract the practitioner who just wants a schedule:
- This is not a probabilistic guardrail. The market’s default answer to “can I trust an agent against my system of record” is an LLM-as-judge that scores plausibility — “the guardrail model was 94% confident.” That is not defensible to an auditor. TruePPM’s refusal is non-probabilistic: it computes the correct answer from a formal model and refuses violations with certainty plus a derivation. In model-risk terms (SR 11-7), the deterministic engine is an effective challenge to probabilistic agent behavior.
- One pipeline, many rule domains — a hypothesis, not yet a claim. Today the engine grounds
exactly one domain: scheduling feasibility. Whether the same verdict / refusal / audit path
can ground a second domain — a budget cliff, a DORA control, a data-residency rule —
behind a domain-agnostic
Invariant → Verdictregistry is a backlog item to prove (the instance-#2 experiment on the roadmap), not a shipped capability. We name it so the roadmap stays honest, and we will not describe TruePPM as a general “grounding engine” until that test passes.
Go deeper
Section titled “Go deeper”- AI-native by design — the full architecture: discoverable API, the MCP entry point, the anti-hallucination substrate, provenance, and the OSS vs Enterprise line for AI.
- Guiding principles — how this fits with the other three commitments.
- The Story — the same truth, now answerable by an agent, in context.