Idempotency
TruePPM supports a Stripe-style Idempotency-Key request header so that retrying an
unsafe request is safe — a retry after a network timeout replays the original response
instead of applying the write a second time.
This is opt-in per request and applies to POST, PUT, PATCH, and DELETE.
How it works
Section titled “How it works”-
Generate a unique key per logical operation — a UUIDv4 is recommended — and send it in the
Idempotency-Keyheader:POST /api/v1/tasks/ HTTP/1.1Authorization: Bearer <jwt>Idempotency-Key: 9f1c2e7a-3b4d-4f5a-8c6e-2d1b0a9f8e7dContent-Type: application/json{"project": "…", "name": "Build", "duration": 3} -
The first request runs normally. Its response (status, body, and the
Locationheader if present) is stored atomically with the database write. -
A retry with the same key and the same request replays the stored response. The replay carries an
Idempotent-Replay: trueresponse header, and the underlying write is not repeated.
The stored response is written inside the same database transaction as the mutation, so a committed write always has a replayable response, and a failed (rolled-back) request stores nothing — a later retry re-runs it.
The published OpenAPI schema declares this contract on every mutating operation that
honors the header: an optional Idempotency-Key request header, an Idempotent-Replay
response header on the success responses, and the shared 422 key-reuse response
(IdempotencyKeyConflict). Operations that are exempt (see Scope) declare none
of these.
Rules and edge cases
Section titled “Rules and edge cases”| Situation | Result |
|---|---|
No Idempotency-Key header | Normal behavior — the key is opt-in. |
GET / HEAD / OPTIONS | Header ignored (safe methods). |
| Same key, same request | Stored response replayed (Idempotent-Replay: true). |
| Same key, different request body/path | 422 Unprocessable Entity, code idempotency_key_conflict. |
Validation error (4xx) or server error (5xx) | Not cached — these roll back the request, so a retry re-runs it (the error is deterministic). |
| Key older than the retention window | Purged; a later retry re-runs the request. |
Send byte-identical retries. The key is bound to a hash of the method, full path
(including query string), and the raw request body. A literal retry of the same request
matches; a semantically-equivalent request serialized differently (e.g. reordered JSON
keys, or multipart/form-data whose boundary changes per request) will not match and is
rejected with 422. Use application/json and resend the exact same payload bytes.
Keys are scoped per authenticated user. One user cannot replay another user’s stored response, even with the same key value.
422 conflict response
Section titled “422 conflict response”{ "detail": "Idempotency-Key was reused with a different request.", "code": "idempotency_key_conflict"}The header is honored on all standard mutation endpoints (tasks, dependencies, projects, risks, baselines, sprints, calendars, phases, custom fields, resources, skills, notifications, project/program memberships, integration credentials, comments, attachments, and the board/task structural operations).
A number of endpoints are intentionally exempt — each view opts out with
idempotency_exempt = True (trueppm_api.apps.idempotency.mixins.IdempotencyMixin),
for one of four reasons. This lists the exemptions by reason rather than
naming every view, since the set can grow without this page being updated in
lockstep — if you rely on the header against an endpoint not covered by the
categories below, send a real request first and confirm you get an
Idempotent-Replay header on a byte-identical retry:
- The response carries a one-time plaintext secret that must never be
persisted for replay — API token issuance
(
POST /api/v1/projects/{id}/api-tokens/andPOST /api/v1/me/api-tokens/, personal access tokens), webhook registration (POST /api/v1/{projects,programs}/{id}/webhooks/), and Git-automation secret rotation (POST .../git-automation/rotate-secret/). - Multipart file uploads already deduplicated server-side by their own
request-tracking table, so the generic key store would only add overhead —
MS Project import, both into an existing project
(
POST /api/v1/projects/{id}/import/msproject/) and as a new project (POST /api/v1/projects/import/msproject/); Jira XML import (POST /api/v1/projects/{id}/import/jira/); and CSV/Excel import, both the stateless preview and the commit (POST /api/v1/projects/{id}/import/csv/and its/preview/sibling). - Already idempotent by a different, purpose-built mechanism, so a second
layer would be redundant — inbound task sync
(
POST /api/v1/projects/{id}/task-sync/, idempotent by(project, source, external_id)upsert; see the inbound task-sync protocol), offline sync push (POST /api/v1/projects/{id}/sync/, idempotent byclient_batch_id), the inbound Git webhook receiver (an unauthenticated endpoint with no JWT user to key a store on — replay safety comes from a Redis delivery claim and a forward-only status guard instead), the Git-automation config toggle (PUT .../git-automation/, which converges to the same state on replay), the CI-verdict / acceptance-criteria endpoint (a repeated verdict is a no-op), and SSO provider create (POST /api/v1/workspace/sso/providers/, which keys on a unique(workspace, slug)constraint and answers409on a duplicate). - Replaying a stored response would bypass read-time redaction —
notification updates (
PATCH /api/v1/me/notifications/{id}/and snooze). A notification’s subject, body, and project are redacted when the recipient is no longer a member of that project; a cached response captured while they still were would replay the unredacted content. Both mutations are already naturally idempotent (marking read or archived twice is a no-op, and snooze overwrites its timestamp), so the header would add no double-submit protection here.
Several of these also carry a token-principal or unauthenticated caller rather than a JWT/session user, which the generic Idempotency-Key store keys on — a second, independent reason several of the above are exempt rather than simply covered by it.
Retention
Section titled “Retention”Stored idempotency responses are retained for 24 hours (configurable via
TRUEPPM_IDEMPOTENCY_RETENTION_HOURS;
set the Django setting to None to disable purging — the legacy bare
IDEMPOTENCY_RETENTION_HOURS is still read as a fallback when the prefixed variable is
unset) and removed by an hourly maintenance task. After expiry the key is free to be
reused, and a retry that arrives after the window re-runs the request.
Client behavior
Section titled “Client behavior”The web app and mobile SDK will attach an Idempotency-Key automatically when retrying a
failed mutation. (Those integrations build on this server contract and ship separately.)
Custom API integrations should generate one key per logical operation and reuse that same
key across retries of that operation.