Attachment Policy

Two attachment settings — file attachments enabled and the allowed file types — are set at the workspace and inherit down to every program and project, where a Program Manager or Project Manager (or above) can override them for that scope. This page explains what the two settings do, how the Workspace → Program → Project inheritance model resolves a value, who may override it, and which file types are permanently blocked for security.

These settings govern uploaded files only. Pinned external links are a separate capability and are unaffected by the attachment policy.

SettingAPI fieldWhat it controls
File attachmentsattachments_enabledWhen on, members may upload files to tasks. When off, the + Attach file control is hidden and the API rejects file uploads. External links are unaffected.
Allowed file typesallowed_attachment_typesThe set of MIME types that may be uploaded. A child scope inherits the parent’s effective set and may narrow (remove types) or widen (add types) it.

The default allowed set is PDF, JPEG, PNG, WebP, Excel (.xlsx), CSV, and Word (.docx) — the system default that seeds a new workspace.

The value that actually applies at a given scope is resolved on the server and returned to every client (web, mobile, API), so no client re-implements the precedence. The chain is:

Workspace value → Program override → Project override
(the default) (optional) (optional)

Precedence — most specific wins:

  1. If the project sets an explicit override, that value applies.
  2. Otherwise, if the project’s program sets an explicit override, that value applies.
  3. Otherwise, the workspace value applies.

A standalone project (one not in a program) inherits directly from the workspace. A program inherits directly from the workspace; a project in that program inherits the program’s resolved value.

In the community edition, the parent value is a default, not a ceiling. A program or project may loosen or tighten the inherited policy — turn attachments off for one project even when the workspace allows them, or add a file type the workspace doesn’t. (The Enterprise Enforce policy changes this.)

Inherit vs. override — the allowed-types tri-state

Section titled “Inherit vs. override — the allowed-types tri-state”

On a program or project, the allowed-types override has three distinct states, which the settings UI keeps separate:

StateMeaning
InheritThe scope has no override and shows the parent’s resolved set. This is the default.
Explicit setThe scope defines its own list (narrower or wider than the parent).
Explicit emptyThe scope allows no file types at all. Attachments are still “on”, but no file can be uploaded — a deliberate “links only” policy. The settings page shows a clear warning when a scope is in this state.

Choosing Inherit at any time clears the override and the scope falls back to the parent’s resolved value. The settings page shows an “Inherited from the program or workspace default” indicator and, when overriding, whether the override is narrower or wider than the parent.

Permanently blocked types (security denylist)

Section titled “Permanently blocked types (security denylist)”

Some file types are always blocked at every scope and cannot be enabled — not by the workspace, not by widening a program or project, and not in any edition:

  • HTML (text/html)
  • XHTML (application/xhtml+xml)
  • SVG images (image/svg+xml)

These are active stored cross-site-scripting (XSS) vectors when served from the application origin, so they are removed from every resolved allow-list and rejected on upload regardless of policy. The settings UI shows them in an Always blocked group so it is clear why they cannot be selected. (External links to such files are served off-origin and remain allowed.)

Uploads are also validated by content sniffing — a file whose bytes do not match its declared type is rejected even if the type is allowed — and capped at a maximum size.

ActionRequired role
View the resolved policyAny member of the scope
Change the workspace policyWorkspace Owner / Admin
Override a program policyProgram Admin (or higher)
Override a project policyProject Admin (or higher)

Members, Schedulers, and Viewers see the resulting behavior (the + Attach file control appears or is replaced by a short “File attachments are disabled for this project” note) but cannot change the policy.

Open Settings → Attachments at the scope you want to configure:

  • Workspace — the root default for the whole workspace.
  • Program — overrides the workspace for every project in the program that inherits.
  • Project — overrides the program (or workspace) for that one project.

See also Sharing & Access Inheritance for the same inheritance model applied to public sharing and guest access, and Task collaboration for how attachments appear on a task.