Sharing & Access Inheritance
Two access settings — public sharing and guest access — are set once at the workspace and inherit down to every program and project, where an Owner or Admin can override them for that scope. This page explains what the two settings do, how the Workspace → Program → Project inheritance model resolves a value, who may override it, and how the “Inherit (On/Off)” indicator reads.
It also documents the broader scope matrix: which General settings live at which scope, and why — so it is clear at a glance why some settings are workspace-only, some inherit per scope, and some are deliberately scope-specific.
The two sharing settings
Section titled “The two sharing settings”| Setting | API field | What it controls |
|---|---|---|
| Public sharing | public_sharing | When on, designated read-only views can be shared via link so that anyone with the link can view, without signing in. When off, every view requires authentication. |
| Guest access | allow_guests | When on, external collaborators (users with guest status) may be added to projects. When off, only full workspace members may be added. |
Both are booleans, both default at the workspace, and both behave the same way under inheritance.
What the Share dialog does when the setting is off
Section titled “What the Share dialog does when the setting is off”Public sharing is off by default, so on a fresh install the Share dialog opens into
its blocked state. It says so up front — “Public sharing is turned off for this
workspace” — and the Create link button is disabled, rather than letting you fill in
the form and receive a 403 from the server on submit.
A workspace admin gets a link straight to Workspace Settings → General, where the switch lives. Anyone else is told that a workspace admin can turn it on: that page is admin-gated, so sending a project admin who is a plain workspace member there would only bounce them.
Already-minted links stay manageable while the setting is off. The dialog’s Manage panel still lists them and Revoke still works — turning the workspace switch off withdraws links from recipients (below) but does not remove them, and closing them for good is still something you may want to do.
Ships in 0.5: the policy is enforced where a link is created, not only in the Share dialog and the share-link endpoint. The server-side mint routine itself will refuse to create a link while the effective Public sharing policy is off, so a management command, the sample-data loader, or a future bulk or automation path cannot produce a link the policy forbids. The sample-data loader will skip its sample share link on an instance where Public sharing is off. In 0.4 only the share endpoint checks the policy at creation time; the policy is still checked when a link is served.
Turning Public sharing off revokes existing links
Section titled “Turning Public sharing off revokes existing links”The switch is retroactive and immediate. The effective policy is re-checked on every request to a public link, so turning Public sharing off at any scope stops every already-minted link below it from resolving — no restart, no cache flush, and no need to revoke links individually.
A recipient who opens a withdrawn link gets 410 Gone and the “this link is no
longer active” page — the same response as a link that was revoked by hand, that
expired, or whose project was moved to Trash. 410 rather than 404 is deliberate:
the link was real and was deliberately withdrawn, and the recipient is told to ask
the project owner for a new one rather than that the link never existed.
The recipient is not told which of those four causes applied. That is the link owner’s business, and the recipient’s next step is the same either way.
Turning the setting back on restores the links that were not otherwise revoked or expired — withdrawal is a policy check at read time, not a change to the links.
The inheritance model
Section titled “The inheritance model”The value that actually applies at a given scope is resolved on the server and returned to every client (web, mobile, API), so no client re-implements the precedence. The chain is:
Workspace value → Program override → Project override (the default) (optional) (optional)Precedence — most specific wins:
- If the project sets an explicit override, that value applies.
- Otherwise, if the project’s program sets an explicit override, that value applies.
- Otherwise, the workspace value applies.
A standalone project (one not in a program) inherits directly from the workspace. A program inherits directly from the workspace; a project in that program inherits the program’s resolved value.
In the community edition, the parent value is a default, not a ceiling. A program or project may loosen or tighten the inherited value — a single project can be made public even when the workspace has public sharing off, and vice versa. (The Enterprise Enforce policy changes this; see below.)
How a scope inherits vs. overrides
Section titled “How a scope inherits vs. overrides”Each program or project stores its override as a nullable value:
- No override set → the scope inherits the resolved parent value. This is the default for every new program and project.
- Override set to On or Off → the scope uses that explicit value, regardless of the parent.
Clearing an override returns the scope to inheriting from its parent.
The “Inherit (On/Off)” indicator
Section titled “The “Inherit (On/Off)” indicator”When a program or project has no override, its General settings show the control as Inherit (On) or Inherit (Off). The On/Off in parentheses is the value the scope would receive from its parent — i.e. the resolved parent value — so an admin can see the consequence of leaving inheritance in place before deciding whether to override.
When a scope does override, the control shows the explicit On/Off it has set, not an inherit label.
Who can override
Section titled “Who can override”Setting (or clearing) an override at a scope uses the same General-settings write gate as the rest of that scope’s identity settings: the scope’s administrators: Project Manager or above on a project, Program Manager or above on a program, and a workspace Admin on the workspace.
- Owner / Admin of a program or project can set, change, or clear that scope’s override.
- Lower roles (Scheduler, Member, Viewer) receive the same resolved values on read and see the setting as a read-only inherited indicator — they cannot change it.
Override rights are evaluated server-side and reflected in the API payload, so the UI never has to guess whether a control should be editable.
Auditing overrides
Section titled “Auditing overrides”Every override change is captured automatically in the program’s or project’s change history (actor, timestamp, old → new value) through the standard settings write path — no separate audit step is required.
Locking the workspace value (Enterprise)
Section titled “Locking the workspace value (Enterprise)”The workspace carries a public sharing override policy (public_sharing_override_policy)
with two values:
| Policy | Behavior |
|---|---|
| Suggest (default) | The workspace value is a default. Downstream programs and projects may override it (loosen or tighten). This is the community-edition behavior. |
| Enforce | The workspace value is a hard ceiling: downstream scopes cannot loosen it (cannot turn sharing on when the workspace has it off). |
When Enforce is active (Enterprise), a Project Manager or Program Manager (or above) downstream can still tighten sharing for their scope, but cannot loosen it past the workspace ceiling, and the resolved effective value is clamped to the workspace value.
Scope matrix — which General settings live where
Section titled “Scope matrix — which General settings live where”The settings surface spans three scopes. Not every setting exists at every scope — this is by design. The table below documents where each General setting lives and why.
Workspace-only
Section titled “Workspace-only”These describe the installation as a whole; a single value is correct and overriding them per program or project would be meaningless or contradictory.
| Setting | Why workspace-only |
|---|---|
| Fiscal year start | A fiscal calendar is an organization-wide accounting anchor; per-project fiscal years would make rollups and quarter labels incoherent. |
| Work week (working-day flags) | Per-project working time is expressed through project calendars, not a second copy of this flag — which is why there is no per-scope override here. Note that the workspace field itself is currently inert: nothing reads it, and working days resolve entirely from the working calendar chain. See Settings that are stored but not yet read. |
Per-scope, inheritable
Section titled “Per-scope, inheritable”These are set once at the workspace and inherit down, but a program or project may override them when a local exception is genuinely needed.
| Setting | Why inheritable |
|---|---|
| Public sharing | Sharing posture is usually uniform, but one program or project may legitimately need to be public (or kept private) independent of the rest. |
| Guest access | Whether external collaborators are allowed is usually a workspace default, but a single program/project may need to admit (or exclude) guests on its own. |
| Iteration label (sprint/iteration terminology) | Teams differ in vocabulary; the term inherits the workspace default but a program or team may rename it locally. |
Scope-specific by design
Section titled “Scope-specific by design”These deliberately exist only at certain scopes — they describe something about that scope and there is nothing to inherit.
| Setting | Where it lives | Why scope-specific |
|---|---|---|
| Visibility | Project | Describes a single project’s discoverability; it is not a value a parent hands down. |
| Health | Project | A RAG health indicator is a property of one project’s current state; it is not inherited. |
| Methodology | Project | The Waterfall/Agile/Hybrid preset drives that project’s tab visibility and defaults; each project chooses its own. |
| Time zone | Workspace and Project | Both scopes carry the field, but they do not form a cascade: a project’s time zone anchors that project’s quiet hours and falls back to the server’s UTC, not to the workspace value. Neither one changes how dates are displayed to you — that follows your personal time zone. A program has no time zone — it is a coordination grouping, not a place where work is scheduled, so there is nothing to set or inherit. |
| Accent color | Program | A program’s accent color is part of its visual identity for wayfinding; projects and the workspace do not carry one. |
| Export | Program | Program-level export packages the program’s projects together; it is a program operation with no per-project or workspace equivalent. |
Backing API
Section titled “Backing API”The inheritance model is exposed entirely through the existing settings endpoints — there are no new endpoints.
| Scope | Endpoint | Override fields (writable) | Resolved fields (read-only) |
|---|---|---|---|
| Workspace | PATCH /api/v1/workspace/ | public_sharing, allow_guests, public_sharing_override_policy | — |
| Program | PATCH /api/v1/programs/{id}/ | public_sharing, allow_guests (nullable; null = inherit) | effective_public_sharing, inherited_public_sharing, effective_allow_guests, inherited_allow_guests |
| Project | PATCH /api/v1/projects/{id}/ | public_sharing, allow_guests (nullable; null = inherit) | effective_public_sharing, inherited_public_sharing, effective_allow_guests, inherited_allow_guests |
- The override fields on a program or project are nullable: send
nullto clear the override and return to inheriting; sendtrue/falseto set an explicit value. - The
effective_*fields report the resolved value that actually applies at the scope, after walking the precedence chain. - The
inherited_*fields report what the scope would inherit if its own override were cleared — this is what drives the “Inherit (On/Off)” indicator.
See Workspace Settings and Project Settings for the rest of each scope’s General page.