Dead-letter Alerting
When a background Celery task in TruePPM exhausts its retries, the work is permanently abandoned — a CPM recalculation, a notification email, an MS Project import, all driven asynchronously. Without a signal, a solo operator has no way to know that work silently died short of reading the failed-task admin viewset by hand.
Dead-letter alerting closes that gap. Every permanently-failed task records a durable row, emits a structured alert log line, and is counted on a Prometheus endpoint you can scrape and alert on.
What happens when a task is dead-lettered
Section titled “What happens when a task is dead-lettered”A task is dead-lettered when it has exhausted all configured retries and will not run again. At that point, three things happen exactly once per failed task:
-
A durable
FailedTaskrow is recorded (statusDEAD). This is the system of record — it survives restarts and is what the metrics endpoint counts. It is the same row the failed-task admin viewset reads. From 0.4, the row will also carry aproject_idcolumn (nullable — not every dead-lettered task is project-scoped) so failures will be attributable to a project directly from the admin API or the ORM, not only from the alert log line’sextrafield. -
A structured
WARNINGlog line is emitted by thetrueppm_api.apps.scheduling.receiverslogger:WARNING dead-letter alert: task scheduling.recalculate (a1b2c3d4-…) permanently failed: connection timed outThe line carries machine-readable
extrafields for log-based alerting:Field Meaning task_nameThe registered Celery task name (e.g. scheduling.recalculate)task_idThe Celery task id of the failed run exception_typeThe exception class name that caused the final failure project_idThe owning project id, or nullwhen the task is not project-scoped -
A
celery_task_permanently_failedsignal fires, which Enterprise (or your own code) can subscribe to for off-box alerting. The OSS receiver only logs — see Routing alerts off-box.
The alert fires once per newly dead-lettered task: a re-delivered failure for a task id that is already parked does not re-alert, so you do not get an alert storm from a single stuck task. The dedupe is by task id, so it does not cover separate runs: each run that fails gets its own task id, and therefore its own row and alert. A project that keeps producing refused recalculations (below) alerts once per refused run, for example once per edit that triggers a recalculation.
Alerting on the log line
Section titled “Alerting on the log line”If you forward worker logs to an aggregator (Loki, CloudWatch, Datadog, an ELK
stack), alert on the dead-letter alert: message from the
trueppm_api.apps.scheduling.receivers logger. The extra fields are emitted as
structured fields, so you can route or group by task_name or project_id without
parsing the message string. This is the fallback signal for deployments with no
Prometheus.
The /api/v1/health/dead-letter/ metrics endpoint
Section titled “The /api/v1/health/dead-letter/ metrics endpoint”For metrics-based alerting, scrape the Prometheus-text endpoint. It requires a
workspace operator (superuser) account — it exposes operational state, so it is
gated with IsWorkspaceOperator and is bearer-scrapeable, mirroring
/api/v1/health/beat/ (see Beat Liveness).
It emits a single gauge, trueppm_task_dead_letter_parked, labeled by task name:
# HELP trueppm_task_dead_letter_parked Permanently dead-lettered Celery tasks currently awaiting operator action, by task name.# TYPE trueppm_task_dead_letter_parked gaugetrueppm_task_dead_letter_parked{task_name="scheduling.recalculate"} 3curl -fsS -H "Authorization: Bearer $ADMIN_JWT" \ https://trueppm.example.com/api/v1/health/dead-letter/The metric is a gauge, not a counter: it counts dead-lettered tasks that are
currently parked — awaiting operator action. The value falls when a parked
task is dismissed, retried, or purged. A value of 0 (or the series disappearing
for a given task_name) means nothing is currently dead-lettered for that task.
Wiring it into Prometheus
Section titled “Wiring it into Prometheus”The endpoint is authenticated, so it is not a drop-in unauthenticated scrape target. Configure the scrape job with a bearer token:
scrape_configs: - job_name: trueppm-dead-letter metrics_path: /api/v1/health/dead-letter/ scheme: https authorization: type: Bearer credentials: <admin-jwt> # or credentials_file: /etc/prometheus/trueppm-token static_configs: - targets: ["trueppm.example.com"]This example scrapes through your public hostname, so it reaches the api pod
through the ingress controller. If you point the job at the api Service from
inside the cluster instead, the Helm chart’s default-deny NetworkPolicy drops it
until you set
networkPolicy.monitoringSelector to your
monitoring namespace. The gauge then never appears, and the alert below can never
fire.
A useful alert rule fires when anything is parked:
groups: - name: trueppm-dead-letter rules: - alert: TruePPMTaskDeadLettered expr: sum(trueppm_task_dead_letter_parked) > 0 for: 5m labels: severity: warning annotations: summary: "TruePPM has permanently-failed background tasks awaiting action"Because the metric is a gauge of currently parked work, the alert clears automatically once the parked tasks are retried, dismissed, or purged — no manual alert reset.
Routing alerts off-box (Enterprise)
Section titled “Routing alerts off-box (Enterprise)”The OSS edition only logs the alert and counts it on the metrics endpoint. It never calls out to PagerDuty, Slack, or any external pager — that is an Enterprise capability.
The integration point is the celery_task_permanently_failed Django signal in
scheduling/signals.py. Enterprise (or your own custom app) registers an
additional receiver against it from its own AppConfig.ready() — the OSS
log-only receiver stays in place and the two run side by side:
# In an enterprise / custom app's apps.pyfrom django.apps import AppConfig
class AlertingConfig(AppConfig): name = "trueppm_enterprise.alerting"
def ready(self) -> None: # Importing scheduling.signals gives the stable extension contract; # connecting a new receiver does not modify or replace the OSS one. from trueppm_api.apps.scheduling import signals
@signals.celery_task_permanently_failed.connect(weak=False, dispatch_uid="enterprise.page_on_dead_letter") def page_on_dead_letter(sender, *, task_name, task_id, exception, project_id, **kwargs): pagerduty.trigger( summary=f"TruePPM task {task_name} permanently failed", dedup_key=task_id, custom_details={ "exception": type(exception).__name__, "project_id": project_id, }, )The signal payload carries task_id, task_name, exception, traceback_str,
and project_id (None when the task is not project-scoped).
Outbound webhook deliveries
Section titled “Outbound webhook deliveries”Outbound webhook delivery is covered by this page’s machinery, with one wrinkle worth knowing: the delivery task does not fail the way a normal Celery task does.
A delivery that will never be attempted again — a permanent 4xx, an exhausted
retry chain, a host blocked by the SSRF egress guard, or a missing signing secret —
marks its own delivery row failed and returns normally. Nothing raises,
because raising would hand the retry decision back to Celery for something the task
has already decided not to retry. The task therefore parks itself explicitly, and
the result is indistinguishable from any other dead-lettered task:
WARNING dead-letter alert: task webhooks.deliver_webhook (a1b2c3d4-…) permanently failed: WebhookDeliveryFailedtrueppm_task_dead_letter_parked{task_name="webhooks.deliver_webhook"} 2The FailedTask row carries the delivery id in args, the webhook id in
kwargs, and the project (for project-scoped webhooks) in project_id. The
exception_message is the human-readable cause — Permanent client error HTTP 410 — not retried, HTTP 503 after 5 attempts, and so on.
Two things this does not cover:
-
A delivery to an inactive webhook is not parked. Skipping a paused subscription is a deliberate state, not a fault; parking every skipped delivery would bury real failures under noise from a webhook nobody expects to fire.
The consequence is worth internalizing, because it inverts the usual reading of your alert stream: when the automatic guard deactivates a subscription, that webhook’s dead-letter records stop. Silence after a burst of
webhooks.deliver_webhookfailures means the integration is dead, not that it recovered. The parked record for the failure that crossed the threshold carriesSUBSCRIPTION DEACTIVATEDin itsexception_messageprecisely so the transition is greppable — alert on that string, not only on the parked count. -
Requeuing a parked delivery does not resend it. The dead-letter admin’s requeue action re-dispatches scheduling tasks; there is no replay path for a webhook delivery. Treat a parked delivery as evidence for the operator, and reconcile missed events through the API.
Alongside this, a webhook that fails terminally five times in a row (from 0.5, over at least five minutes; 0.4 applies no time floor) is deactivated automatically, which is the project-admin-facing half of the same signal.
Related
Section titled “Related”- Webhooks — outbound delivery, its retry classification, and the automatic-deactivation guard.
- Beat Liveness — the sibling
/api/v1/health/beat/detector for a dead Celery Beat process. - Outbox & Record Retention —
FailedTaskretention is governed by the retention purge; parked dead-letters are reaped along with other terminal records.