Offline sync architecture
Offline Sync documents the WatermelonDB-compatible delta protocol from a client’s point of view — the endpoint shape, the pull/push cycle, what a mobile app does with it. This page is the layer underneath that: the model primitive every synced entity extends, why it carries two version counters instead of one, how a delete becomes something a disconnected client can learn about, and how a batch of offline edits commits as one unit.
VersionedModel
Section titled “VersionedModel”Every entity a client can pull a delta of extends one abstract base:
class VersionedModel(models.Model): id = models.UUIDField(primary_key=True, default=uuid.uuid4, editable=False) server_version = models.BigIntegerField(default=0, editable=False) sync_seq = models.BigIntegerField(default=0, editable=False) is_deleted = models.BooleanField(default=False, db_index=True) deleted_version = models.BigIntegerField(null=True, blank=True, editable=False)
class Meta: abstract = TrueFour of these five fields are old news to anyone who has read
Architecture Overview.
The fifth, sync_seq, is not cosmetic, and the gap between “four fields” and
“five fields” is itself a story worth telling, because it’s the story of a real
bug in a shipped protocol.
Why there are two version counters, not one
Section titled “Why there are two version counters, not one”server_version is a per-row save counter. It increments by exactly one on
every save of that row, starting at 1. It answers “has this specific row
changed since I last saw it” — which is exactly the question an optimistic-lock
check needs.
That is a different question from the one a delta-sync endpoint needs
answered: “which rows, across an entire project, changed since I last synced.”
Comparing a per-row counter against a project-wide watermark conflates the two
questions, and for a while, that’s exactly what the sync endpoint did — the
watermark was MAX(server_version) across every synced table in the project.
The bug that forced the split (tracked as #2491, and the direct cause of
sync_seq existing) is worth stating precisely, because “add a version number”
sounds like it should obviously work and the reason it doesn’t is not obvious:
A task saved 7 times: task.server_version = 7A risk saved once: risk.server_version = 1Project watermark: MAX(server_version) = 7
Client's next `since` = 7. The risk (server_version=1) never clears`server_version > since` again — not until it happens to be savedat least 7 more times. It has silently fallen out of every future delta.This is not a race or a rare interleaving. It is the steady state of any
project with unevenly-edited rows, and it is silent in both directions — the
client believes it fully synced, the server believes it delivered everything,
and nothing anywhere raises an error. Because the watermark unions every
synced table, a hot Task can hide a stalled Risk, Sprint, or —
significantly — a ProjectMembership row a client relies on to enforce RBAC
while offline.
The fix, sync_seq, is a second field with a narrower job: it is not a save
counter, it is a replication cursor, allocated from a strictly monotonic
per-project sequence (backed by Project.last_sync_version) rather than
derived from anything about the row itself:
UPDATE projects_project SET last_sync_version = last_sync_version + 1 WHERE id = %s RETURNING last_sync_versionThe delta filter is sync_seq__gt=since; the watermark returned to the client
is Project.last_sync_version read directly, no aggregation required. Because
every synced write allocates from the same project-scoped sequence,
sync_seq values are totally ordered within a project, and “greater than the
last checkpoint” becomes a question that actually has a correct answer.
The program slice needs a different sequence
Section titled “The program slice needs a different sequence”There is a second delta endpoint — GET /api/v1/sync/user/programs/, which
delivers the caller’s Program and ProgramMembership rows — and the
per-project sequence cannot serve it. A program has no owning project to
allocate from, and the accessible set is per-user: the union of every program
the caller is a member of, which are independent of one another.
That matters because a scalar cursor over independent sequences reproduces the
identical failure one level up. Even giving each program its own counter, a
single since taken as the maximum across N programs lets a hot program’s
sequence outrun a cold one’s, and the cold program’s edits fall out of the delta
— exactly the shape described above, with “program” substituted for “row”.
So program-scoped writes allocate from one installation-wide sequence instead:
UPDATE sync_programsyncsequence SET value = value + 1 WHERE id = 1 RETURNING valueEvery Program and ProgramMembership write in the installation is ordered
against every other one, which is what makes a scalar checkpoint meaningful
again. The watermark is that counter read directly — deliberately not scoped
to the caller’s programs, since scoping it per caller is precisely what made it
a maximum-over-many-rows.
The cost is stated plainly rather than hidden: program writes serialize
installation-wide, because allocation holds the counter row’s write lock until
commit. That lock is the correctness mechanism, not overhead — without it a
transaction could allocate 100, a later one allocate 101 and commit first, and a
pull between the two commits would skip 100 permanently. (A PostgreSQL
SEQUENCE would avoid the lock and reintroduce exactly that race, because
sequences are non-transactional.) The trade is acceptable here because program
writes are rare and administrative — create, rename, add or remove a member —
never a hot path or a bulk import.
server_version is untouched by any of this — it still counts a row’s own
saves, and it is still what the conflict-detection mechanism below uses as an
optimistic-lock token. The two fields answer two different questions on
purpose, and the ADR that introduces sync_seq is explicit that repurposing
server_version itself as the project sequence was considered and rejected —
doing so would have broken the field-level merge mechanism’s arithmetic (which
depends on server_version incrementing in exact lockstep with a row’s history
records) and would have invalidated every offline client’s cached optimistic-lock
value at the moment of migration, producing a conflict storm on upgrade. A
second column costs one field; reusing the first would have cost correctness
in two other places.
One consequence worth flagging rather than glossing over: a delta source that
never allocates a sync_seq — because a write path bypasses save() entirely,
such as a bulk import — sits permanently at sync_seq = 0 and is filtered out
of every delta from a cold start onward. The fix is a rule, not a special case:
any model that appears as a delta source must allocate sync_seq on every
write that reaches it, including bulk paths.
Atomicity: an UPDATE ... RETURNING, not a Django F() expression
Section titled “Atomicity: an UPDATE ... RETURNING, not a Django F() expression”Both counters are advanced the same way, and it is not the pattern you’d get
from .update(server_version=F("server_version") + 1) followed by a refetch.
It’s a single raw-SQL statement that increments and reads back the new value
in one round trip:
cursor.execute( f"UPDATE {table} SET {version_col} = {version_col} + 1 " f"WHERE {pk_col} = %s RETURNING {version_col}", [self.pk],)There is no select_for_update anywhere in this path, and none is needed: the
UPDATE statement itself takes the row’s write lock as part of executing, and
the increment and the read-back happen inside that same locked statement, so
there is no read-then-write gap for a concurrent transaction to land in. A
second concurrent UPDATE against the same row simply blocks until the first
commits, then applies against the post-commit value — the lost-update race the
naive F() pattern would still be exposed to (read old value, compute new
value, write — with another writer’s commit landing in between) cannot happen
here, because there is no separate read step.
This project’s own history shows this was an evolution, not the original
design: the codebase’s comments describe an earlier two-query version
(update(F(...)+1) then a refetch) that this single-statement form replaced
purely for round-trip cost — the lost-update guarantee itself did not change
between the two, because both rely on the same underlying row-lock semantics.
What this page cannot tell you, in the interest of not inventing a
rationale that isn’t recoverable: no comment or ADR in this codebase weighs
this atomic-UPDATE approach against the alternative of explicit optimistic
locking — a client-supplied If-Match-style precondition checked with a
SELECT ... FOR UPDATE before the write. The two produce broadly equivalent
lost-update safety; this codebase settled on the atomic-statement form early
and the choice was never separately litigated in writing that survives. See
the retroactive ADR for VersionedModel
for the full account of what is and isn’t recoverable about this design’s
original reasoning.
Soft delete: a flag on the row, not a separate tombstone table
Section titled “Soft delete: a flag on the row, not a separate tombstone table”A disconnected client cannot be told “this row no longer exists” by simply
removing the row — there is nothing left to sync. VersionedModel handles this
with two fields on the row itself, not a separate ledger table:
def soft_delete(self) -> None: self.is_deleted = True self.save(known_exists=True) type(self).objects.filter(pk=self.pk).update(deleted_version=self.server_version)is_deleted is what the sync pull actually keys on: a row’s collection in the
response splits into updated (live) and deleted (an id list) purely by
testing this flag against the same sync_seq__gt=since filter every other row
in the delta uses. deleted_version is not part of that mechanism — it is
explicitly a garbage-collection marker only, recording what server_version
was at the moment of deletion so the retention job below has something to
compare an age field against; no delta query reads it.
This flag was purpose-built for exactly one job: giving a mobile client a tombstone to reconcile against on its next pull. A user-facing Trash/Restore capability was layered on top of the same mechanism considerably later, and is a distinct feature built on infrastructure that predates it, not the reason the infrastructure exists.
As with the atomic-increment question above, this page states plainly what it cannot verify: no surviving comment or ADR explicitly weighs “a soft-delete flag on the row” against “a separate tombstone table” as alternatives. The flag approach is what shipped; whether a separate table was ever seriously considered and rejected, or simply never came up, is not something this codebase’s history answers.
Retention. Tombstones are not permanent. A nightly job hard-deletes rows
that have been soft-deleted for longer than TRUEPPM_TOMBSTONE_RETENTION_DAYS
(default 90 days), scoped to live projects only. Getting this grace window
right took a real fix: Task and Dependency originally had no age field
registered for this job at all, which meant they were eligible for hard
deletion on the very next nightly run after a soft delete — a zero-day grace
window that directly contradicted the offline-first premise, since a mobile
client that missed exactly one nightly cycle would never receive the
tombstone and would carry a phantom row indefinitely. The fix added a
dedicated deleted_at timestamp, stamped only inside soft_delete(), giving
both models the same 90-day window Risk and Sprint already had.
The retention window still needs a floor. A grace window only shrinks the
phantom-row problem; it cannot close it. Once a tombstone is hard-deleted, no
sync_seq__gt=since query can return that deletion, so a client offline for
longer than the window would still keep the row. Each project therefore carries a
tombstone_floor: the highest sync_seq of any tombstone the reap removed,
cascaded tombstones included, counting only rows that project’s own pull delivers.
If the reap’s delete also cascades to a live row, such as a live dependency of
a reaped task, the floor goes further: the reap draws a fresh sequence value and
raises the floor to it, because a client sitting exactly on that row’s cursor
already holds it and a floor equal to the cursor would not catch it. The reap
raises the floor in the same transaction as the delete and never lowers it. A pull with
0 < since < floor answers resync_required: true instead of a delta, and the
client discards its store and pulls again from since=0. The program pull has the
same guard against an installation-wide floor, raised whenever programs or program
memberships are hard-deleted (hard_delete_program and purge_workspace). The
floor never exceeds the sequence head, so the full re-sync always terminates. Deleting a task tombstones its task links, relations, recurrence rules and suggested assignees with it, so reaping the task later removes only tombstones. Its time entries stay live on purpose (they still count as cost), so reaping a deleted task that has time entries forces a full re-sync for every client of that project. So does reaping a task whose project was deleted and restored, because the project-level delete does not yet tombstone those children (#4951). See
Tombstone retention and resync_required
for the client contract and ADR-0686 for the concurrency argument.
UUID primary keys
Section titled “UUID primary keys”Every row’s primary key is a client-assignable UUID
(models.UUIDField(primary_key=True, default=uuid.uuid4)), not a database
auto-increment integer. No single comment in this codebase states the reason
in so many words, but the reason is demonstrated by the code that depends on
it: the mobile upload path applies a created row by upserting on its own
id — a client generates the UUID for a new task before that task has ever
touched the server, submits it in a batch, and the server treats a matching id
as an idempotent re-create rather than a conflict. An auto-increment integer
PK cannot support this — two offline clients would race to claim the same next
integer, and neither could know its assigned id until the server responded.
UUIDs make client-side id generation collision-safe by construction, which is
exactly what an app that must create a task while on an airplane needs.
Mobile batch atomicity
Section titled “Mobile batch atomicity”A batch of offline edits pushed from a mobile client has to behave as one unit: a connection that drops mid-commit must not double-apply on retry, and must not leave the batch half-applied with no way to know which half.
The mechanism is a durable idempotency envelope, not merely a Django
transaction wrapped around the apply logic. Every batch carries a
client-generated client_batch_id, and a SyncBatch row keyed on
(project, actor_user, client_batch_id) is the thing that actually makes a
retry safe:
- If a completed, still-fresh
SyncBatchrow already exists for this key, its stored response is replayed verbatim — the batch is not re-applied. - Otherwise, the whole operation — creating the
SyncBatchrow, applying every row’s create/update/delete, and marking the batch complete — runs inside onetransaction.atomic()block. TheSyncBatchrow is created first, deliberately: its unique constraint on(project, actor_user, client_batch_id)is what serializes two concurrent submissions of the same batch at the database level, not application logic. A second concurrent insert simply blocks on that unique index until the first transaction resolves. - An
IntegrityErroron that insert — the case where a concurrent duplicate won the race — is caught and resolved explicitly: replay if the winner already completed,409“retry shortly” if it’s still in flight, or a one-time retry if the winning row has expired.
Within the batch, rows apply in a fixed created → updated → deleted order,
so a batch that both creates a task and updates it in the same submission
resolves correctly regardless of client-side ordering. The whole batch is
atomic at the transaction level, with one deliberate, documented exception: a
single row whose edit conflicts with a concurrent server-side change (below)
is skipped and reported back as a conflict, without aborting the rest of the
batch.
Conflict resolution: last-writer-wins by default, explicit detection where it matters most
Section titled “Conflict resolution: last-writer-wins by default, explicit detection where it matters most”The baseline behavior for every VersionedModel is plain last-writer-wins: a
stale write simply overwrites, with no error and no signal to either party.
That is a real, documented trade-off, not an oversight — and it is explicitly
scoped as v1 behavior for the mobile batch path, with richer conflict handling
named as deliberately out of scope at the time.
For the three models a project’s collaborators are most likely to edit
concurrently — Task, Project, Risk — a sharper mechanism sits in front of
plain LWW. A client that wants conflict detection sends the server_version
it last saw as a request header. If the row’s current version is no higher,
there’s no conflict. If it is higher, the server reconstructs exactly which
fields changed in the interim — by walking the precise number of history
records the version gap implies — and checks whether those fields overlap the
incoming write:
- Disjoint changes (the concurrent writer touched different fields) — the write proceeds, and the response names what the other writer changed, so the client can merge rather than silently lose that context.
- Overlapping changes — the write is refused with a structured
409naming the conflicting fields and both versions of the disputed values, rather than silently discarding either side.
A client that never sends a base version gets plain LWW — this mechanism is opt-in and additive, not a replacement for the default. And it is worth being honest that the mobile batch path’s own version of this check has a known, documented gap: the batch conflict base falls back to the project-wide sync watermark rather than a true per-row baseline when a row doesn’t carry its own version, which means the field-level guard degrades silently back to last-writer-wins for any row sitting below that watermark. This is filed and acknowledged, not fixed as of this writing — the honest posture toward it is that conflict detection here is real but not yet airtight everywhere it’s exposed.
Where to go next
Section titled “Where to go next”- Offline Sync — the endpoint shapes, the pull/push cycle, and what a mobile client actually does with all of this.
- Broadcast and webhook delivery pipeline — how a change that just landed through this sync path also reaches a live, connected client in real time.
- Architecture Decision Records — ADR-0082 (mobile
sync upload batch atomicity), ADR-0142 and ADR-0686 (the sync watermark, and
why it moved from a
server_versionaggregate to a dedicated cursor), and ADR-0217 (conflict detection beyond plain last-writer-wins) are the primary records behind this page, alongside the retroactiveVersionedModelADR.