Projects, members and workspace API
Calendars
Section titled “Calendars”| Method | Path | Description |
|---|---|---|
| GET | /api/v1/calendars/ | List |
| POST | /api/v1/calendars/ | Create |
| GET | /api/v1/calendars/{id}/ | Retrieve |
| PUT / PATCH | /api/v1/calendars/{id}/ | Update |
| DELETE | /api/v1/calendars/{id}/ | Soft-delete |
Calendar exceptions (/api/v1/calendars/{calendar_pk}/exceptions/ and .../exceptions/{id}/, standard CRUD) are described in Managing exceptions.
Labels
Section titled “Labels”Project labels (/api/v1/projects/{project_pk}/labels/), task label assignment (/api/v1/projects/{project_pk}/tasks/{task_pk}/labels/) and the program-wide catalog (/api/v1/programs/{program_pk}/label-catalog/, .../label-tasks/) are described in Labels.
Projects
Section titled “Projects”| Method | Path | Description |
|---|---|---|
| GET | /api/v1/projects/ | List (scoped to your memberships) |
| POST | /api/v1/projects/ | Create (caller becomes Owner) |
| GET | /api/v1/projects/{id}/ | Retrieve |
| PUT / PATCH | /api/v1/projects/{id}/ | Update |
| DELETE | /api/v1/projects/{id}/ | Soft-delete |
| GET | /api/v1/projects/{id}/status-summary/ | Health and recency summary for the shell — see Status summary |
| GET | /api/v1/projects/{id}/cost/ | Budget, actual cost (hours × rate), earned value, cost variance, budget utilization (spend against budget, not a CPI), and CPI, EAC, ETC, VAC and TCPI with a reason when unavailable, a provenance block, per-person lines and definitions — Project Manager or Owner (ships in 0.5; see Cost model) |
| GET | /api/v1/projects/health-summary/ | One health row per project the caller is a member of: id, name, health_band, health_band_source, at_risk_count, critical_count. Same health_band and health_band_source rules as the status summary below |
Status summary
Section titled “Status summary”GET /api/v1/projects/{id}/status-summary/ returns task counts, health signals, and
recency metadata in one request, so a client rendering a project header does not have
to fan out.
| Field | Type | Meaning |
|---|---|---|
task_count | integer | Live (non-deleted) tasks in the project |
health_band | on_track | at_risk | critical | The project’s health band — see Read health_band, do not re-derive it |
health_band_source | reported | derived | Which of the two branches below decided health_band — see Which of the two produced the band |
at_risk_count | integer | Incomplete tasks with total_float ≤ 5 working days, including negative float. Leaf rows only — phase rows excluded, since a phase’s total_float is a rollup of its children, not a fact about the phase row itself |
critical_count | integer | Incomplete tasks on the critical path. Leaf rows only — phase rows excluded, since a phase’s is_critical is a rollup of its children, not a fact about the phase row itself |
at_risk_tasks | array | Up to 5 at-risk tasks as {id, name, wbs}, lowest float first |
critical_tasks | array | Up to 5 critical tasks as {id, name, wbs}, in WBS order |
blocked_count | integer | Live tasks flagged blocked, counted in full. The count on GET /projects/{id}/blocked/ is that list’s row count and stops at its cap |
monte_carlo_p80 | date | null | An echo of p80 on GET /projects/{id}/monte-carlo/latest/, which owns the figure. Reads the same latest result, so the two agree |
last_saved | date-time | null | Newest human-caused write to any live task |
recalculated_at | date-time | null | When the last CPM pass completed |
as_of | date-time | When the server computed this payload |
definitions | object | One sentence per figure (health_band, at_risk_count, critical_count, blocked_count). See Metric vocabulary |
Read health_band, do not re-derive it
Section titled “Read health_band, do not re-derive it”health_band is the project’s health in the three-word band vocabulary
(on_track, at_risk, critical). The server decides it in this order:
- the manual health report a project manager set on the project (
health, when it is notAUTO) — an explicit judgment call beats the arithmetic; - otherwise the counts on this same payload:
critical_count > 0→critical, elseat_risk_count > 0→at_risk, elseon_track.
Because step 1 is invisible to the counts, a client that computes a band from
at_risk_count and critical_count will contradict the project’s own manager — a
plan a PM reported Critical has clean counts by definition. Print this field. The
health_band on GET /api/v1/projects/health-summary/ is the same value from the
same rule, so the two endpoints never disagree about one project.
AUTO is the “no report filed” value of health; it is never returned as a band.
Do not confuse health_band with schedule_health on
GET /api/v1/projects/{id}/overview/. That is a different signal — a
schedule-performance-index proxy, with a fourth value unknown for a project that
has no planned work to measure against — and it does not read the manual report at
all.
Which of the two produced the band
Section titled “Which of the two produced the band”health_band_source says which of the two steps above ran: reported when a project
manager’s manual report decided the band, derived when no report is filed and the
counts on this payload decided it. There is no third value — AUTO is the derived
case.
A client cannot work this out for itself, which is why the server sends it. A
report that happens to agree with the counts is indistinguishable from no report at
all: a PM who reports At risk on a plan whose float numbers also say at-risk produces
exactly the band the counts would. Comparing health_band against the counts
therefore misses that report silently — and on a reported on_track over a critical
plan it blames the counts for a disagreement a person created.
Read it whenever you show the band next to the evidence the counts represent. A
surface that prints Critical above a list of at-risk and critical tasks is claiming
those rows explain the word; when the source is reported they do not, and the
surface has to say so and point at the report instead. TruePPM’s own shell health chip
does exactly this.
For who filed a reported band and when, read GET /api/v1/projects/{id}/history/ — Project.health is a tracked field. This field says
which branch ran, not who ran it.
Read the nulls as facts. Each of monte_carlo_p80, last_saved and
recalculated_at is null for exactly one reason,
and that reason is the answer rather than “not available yet”:
monte_carlo_p80— no Monte Carlo run has been recorded for this project, or the run produced no distribution to anchor on (a project with no committed tasks).last_saved— nobody has edited a task yet. A freshly seeded or imported project reportsnulluntil a person touches a row; a CPM recalculation is deliberately not an edit, so a schedule pass does not clear it.recalculated_at— the first CPM pass has not completed.
Projects and programs carry the inheritable sharing settings. The override fields
public_sharing and allow_guests are nullable (null = inherit from the parent
scope) and writable by a Project Manager or Program Manager and above; the resolved fields effective_public_sharing,
inherited_public_sharing, effective_allow_guests, and inherited_allow_guests are
read-only. See Sharing & Access Inheritance.
Projects and programs also carry the inheritable attachment policy (the same Workspace → Program → Project chain). The override fields are writable by a Project Manager or Program Manager and above:
| Field | Type | Meaning |
|---|---|---|
attachments_enabled | boolean | null | Whether file uploads are permitted. null = inherit from the parent scope. |
allowed_attachment_types | string[] | null | MIME allow-list (tri-state): null = inherit, [] = explicitly allow nothing, [...] = an explicit set. |
The resolved fields effective_attachments_enabled,
inherited_attachments_enabled, effective_allowed_attachment_types, and
inherited_allowed_attachment_types are read-only. effective_* is the value in
force after inheritance; inherited_* is what the parent scope would supply
(what effective_* falls back to when the override is null).
Writing a MIME type that is permanently security-denied (text/html,
image/svg+xml, application/xhtml+xml) into allowed_attachment_types returns
400 — these can never be allowed, at any scope. An empty list is accepted. See
Task collaboration for how the resolved policy
governs uploads.
Driving chain
Section titled “Driving chain”GET /api/v1/projects/{id}/schedule/driving-chain/ (query: task_id, optional depth) returns the
chain of driving links through one task: upstream along the links that hold it to
the tasks nothing drives, downstream to the project finish. It is read from one
server-side CPM pass over the network the engine actually schedules, so a link on a
summary task arrives as the leaf edges it expands to — rebuilding the chain from
stored dependencies misses those. Any project member (Viewer and up) and an
mcp:read token may read it. It shares the cpm_on_read throttle with
GET /projects/{id}/schedule/derivation/.
| Field | Type | Meaning |
|---|---|---|
computable | boolean | false for a task the CPM pass does not schedule; nodes and edges are then empty |
reason | string | null | Why it is not computable: backlog, not_committed (an epic or recurring task), summary, or not_in_network |
depth, node_cap | integer | The limits applied: depth hops per direction (default 25, max 50) and at most 200 nodes |
schema_version | integer | Contract version of this payload. Additive changes keep it |
truncated, truncated_reason | boolean, string | null | true when a limit cut the walk, with depth or node_cap |
total_links | integer | Driving links in the whole chain, uncapped. Larger than edges.length exactly when the response is truncated |
omitted_non_driving_count | integer | Non-driving links into the task or its upstream chain: predecessors that carry float and are not drawn |
near_critical_threshold | object | {value, unit: "working_days"} — the effective near-critical threshold the node bands were computed against |
calendar_id | string | null | Id of the base calendar the schedule is computed against: the project’s own, else its program’s, else the workspace’s. null only when none resolves and the system default applies. Overlay layers (exceptions, resource calendars) are not named |
project_finish | date | null | The project finish date of the same pass |
nodes | array | {task_id, name, status, direction, hops, early_start, early_finish, total_float, band, is_critical, is_project_finish, sprint}. total_float is {value, unit: "working_days"}. band is complete (finished: zero float but never critical), critical, near_critical or ample; the set is open, so a client must tolerate a value it does not know. direction is self, upstream or downstream; sprint is {id, name, finish_date} or null. No assignee, hours or velocity |
edges | array | {predecessor_id, successor_id, dep_type, lag, is_driving, via_summary}. lag is {value, unit: "calendar_days"} — float counts working days and lag counts calendar days, so the unit always travels with the value. via_summary is a list of {task_id, name} for the summary task(s) the stored link was expanded from, or null for a direct link |
_provenance | object | {schema_version, engine_version, api_version, input_hash, computed_at}. The same inputs give the same input_hash |
When the throttle is exceeded the endpoint answers 429 with the standard Retry-After header. There is no response cache: each call runs one schedule pass.
An unknown task id returns 404, and a depth outside 1–50 returns 400.
Project and program keys
Section titled “Project and program keys”Every project and program has a key, the short name that appears in its links
and IDs. The API field is still named code. Project keys are 2 to 10 letters and
digits and start with a letter (PLAT). Program keys are lowercase slugs of up to
40 characters (atlas-platform-launch). Keys are unique across the workspace for
each kind, compared case-insensitively, and a key is never reissued: renaming
a project keeps its old key as an alias that still resolves to it. After a
project is permanently deleted, its keys stay reserved, so an old link returns
404 rather than opening a different project. A project reference is
<KEY>-T-<n> for a task, <KEY>-SP-<n> for a sprint, and <KEY>-R-<n> for a
risk.
- Create.
codeis optional onPOST /projects/andPOST /programs/. If you leave it out or send"", the server derives a key from the name (PLAT, orPLAT2whenPLATis taken) and returns it. - Rename. Send a new
codein aPATCHto rename. You need the same role you need to edit the General settings. The old key is retired. An object can have at most 10 retired keys; the next rename returns400. Project and program detail responses includeretired_key_count. - Errors. A
400oncodeis one of:This key is already in use.(held now or in the past by any project, including one you can’t see; the holder is never named),That word is reserved.(new,settings,trash, or a UUID-shaped value), or a format message. - Existing codes. A project code created before keys were introduced may
contain hyphens and be up to 12 characters (
GA-SEC). It is kept and still resolves, and aPATCHthat sends the unchanged value is accepted. A new value must use the current format.
| Method | Path | Description |
|---|---|---|
| GET | /api/v1/resolve/?kind=project|program&ref=<ref> | Resolve a key, a retired key, a UUID, or a <KEY>-<T|SP|R>-<n> reference to ids |
| GET | /api/v1/keys/?kind=project|program&name=<name> | Suggest a free key for a name: {suggestion} |
| GET | /api/v1/keys/?kind=project|program&key=<key>[&object_id=<uuid>] | Check a key: {available, reason, suggestion} |
Both endpoints require authentication and share the per-user resolve rate limit
(120/min, TRUEPPM_THROTTLE_RESOLVE_RATE).
Resolve
Section titled “Resolve”ref can be a current key, a retired key, a UUID, or (for kind=project) a
reference such as PLAT-T-10. The server reads the reference from its last
marker, so a hyphenated key still works: GA-SEC-T-10 is task 10 of GA-SEC.
{ "type": "task", "id": "5b0f…", "project_id": "9c1e…", "program_id": "2d44…", "key": "PLAT", "canonical_ref": "PLAT-T-10"}type is project, program, task, sprint, or risk. key and
canonical_ref are always the current form, so a client that holds a retired
key gets the new one back. A project with no key yet has key: null and uses
its UUID as canonical_ref.
The lookup only searches projects you’re an active member of (and programs you
belong to). With a project- or program-scoped API token, it is further limited to
that token’s scope. If nothing you can read matches, the response is
404 {"detail": "Not found."}. That response is the same whether the key doesn’t
exist, belongs to a project you can’t see, is outside your token’s scope, or is a
retired key of a hidden project.
Key suggestion and availability
Section titled “Key suggestion and availability”With name, the response is {"suggestion": "PLAT"}. With key, it is
{"available": false, "reason": "taken", "suggestion": "PLAT2"}. reason is
taken, reserved, invalid, or null when the key is available. Pass
object_id when you’re renaming: that object’s own current and retired keys
are reported as available, because renaming back is allowed. An object_id you
can’t read is ignored.
This endpoint tells you whether some project holds a key, even one you can’t see. That is by design: a workspace-wide unique name can’t be refused without saying it’s taken. It never says which project holds the key.
Project members
Section titled “Project members”| Method | Path | Description |
|---|---|---|
| GET | /api/v1/projects/{id}/members/ | List (Viewer+) |
| POST | /api/v1/projects/{id}/members/ | Add member (Project Admin only; see the target rule below) |
| GET | /api/v1/projects/{id}/members/{mid}/ | Retrieve |
| PATCH | /api/v1/projects/{id}/members/{mid}/ | Change role (Project Admin only). role only — user is not accepted |
| DELETE | /api/v1/projects/{id}/members/{mid}/ | Remove (Project Admin, or self) |
Program membership is the same shape, one tier up:
| Method | Path | Notes |
|---|---|---|
| GET | /api/v1/programs/{id}/members/ | List (Viewer+) |
| POST | /api/v1/programs/{id}/members/ | Add member (Program Admin only; same target rule) |
| GET | /api/v1/programs/{id}/members/{mid}/ | Retrieve |
| PATCH | /api/v1/programs/{id}/members/{mid}/ | Change role (Program Admin) or role_title (Program Manager+). user is not accepted |
| DELETE | /api/v1/programs/{id}/members/{mid}/ | Remove (Program Admin, or self). On a closed program only self-removal is accepted; removing another member returns 403 |
Who user may name
Section titled “Who user may name”From 0.4 the caller’s role decides who they may add, not just whether they may add:
- a workspace Admin or Owner may name any active account;
- anyone else may name themselves, or an account already on a project or program roster they belong to — including one whose membership was revoked, so re-adding somebody you removed keeps working.
Deactivated accounts are never accepted. An id outside the caller’s reach is refused
with 400 and a user error carrying the same message a nonexistent id gets, so
this field cannot be used to test whether an account exists. To bring in somebody
further out, send a workspace invite — it is
keyed on an email address the sender already holds.
user is not part of a PATCH body on either route. A membership’s account is fixed
at creation; remove the member and add the other account instead. See
API stability for the Breaking-change record.
See RBAC for the permission matrix and role escalation rules.
Workspace
Section titled “Workspace”| Method | Path | Auth | Description |
|---|---|---|---|
| GET | /api/v1/workspace/ | Any active member | Retrieve workspace config. |
| PATCH | /api/v1/workspace/ | Workspace Admin+ | Update workspace config (partial). |
timezone is an IANA identifier (there is no auto sentinel — unlike the per-user
profile timezone, this one is resolved server-side). From 0.4 a non-IANA value is
rejected with a 400 instead of stored, and the field is the quiet-hours fallback for
a project that sets no timezone of its own — not a display timezone. See
Default timezone.
The workspace config includes public_sharing and allow_guests (the inheritance
defaults for all programs and projects) and public_sharing_override_policy
(suggest/enforce). enforce is an Enterprise-only lock and degrades to suggest in
the community edition. See Sharing & Access Inheritance.
The workspace config also carries the attachment policy root — the non-null
top of the Workspace → Program → Project inheritance chain (lower scopes leave
their override null to inherit these):
| Field | Type | Meaning |
|---|---|---|
attachments_enabled | boolean | Whether task file uploads are permitted by default (external links are unaffected). |
allowed_attachment_types | string[] | MIME allow-list (seeded from the system default). An empty list is a deliberate “no file types allowed” policy. |
attachments_override_policy | string | inherit / suggest / enforce (default suggest). enforce is an Enterprise lock and is a no-op in the community edition. |
These three fields are writable by a Workspace Admin+. Writing a permanently
security-denied MIME type (text/html, image/svg+xml,
application/xhtml+xml) into allowed_attachment_types returns 400 — these
can never be allowed.
Workspace members
Section titled “Workspace members”| Method | Path | Auth | Description |
|---|---|---|---|
| GET | /api/v1/workspace/members/ | Admin+ (non-admin sees own row only) | List workspace members. |
| PATCH | /api/v1/workspace/members/{user_id}/ | Admin+ | Change a member’s role or status. |
| DELETE | /api/v1/workspace/members/{user_id}/ | Admin+ | Deactivate a member. |
| POST | /api/v1/workspace/members/{user_id}/send-set-password-link/ | Admin+, session or JWT only (API tokens refused); member’s role must be lower than the caller’s | Email a member who has no password a one-time, 30-minute set-password link. The link is never returned. 200 {"sent": true}; 409 with code member_has_password, member_inactive, member_has_no_email or set_password_link_unavailable; 503 email_delivery_failed. 10/hour per caller. Ships in 0.5; see Restoring access for a member with no password. |
Workspace invites
Section titled “Workspace invites”| Method | Path | Auth | Description |
|---|---|---|---|
| GET | /api/v1/workspace/invites/ | Admin+ | List invites. Defaults to ?status=pending; pass a terminal status (accepted, revoked, expired, failed) or all to read the invite history. Rows carry accepted_at / accepted_by, both null unless the invite was taken up. |
| POST | /api/v1/workspace/invites/ | Admin+ | Create an invite (email queued asynchronously). |
| DELETE | /api/v1/workspace/invites/{id}/ | Admin+ | Revoke a pending invite. |
| POST | /api/v1/workspace/invites/accept/ | Public | Accept an invite with a one-time token. Rate-limited: 20 req/min. |
See Workspace Settings for invite token security and the group-access cascade.
Workspace groups
Section titled “Workspace groups”| Method | Path | Auth | Description |
|---|---|---|---|
| GET | /api/v1/workspace/groups/ | Any member | List groups. |
| POST | /api/v1/workspace/groups/ | Admin+ | Create a group. |
| GET | /api/v1/workspace/groups/{id}/ | Any member | Retrieve a group. |
| PATCH | /api/v1/workspace/groups/{id}/ | Admin+ | Update name, description, or lead. |
| DELETE | /api/v1/workspace/groups/{id}/ | Admin+ | Delete group (removes group-conferred memberships). |
| POST | /api/v1/workspace/groups/{id}/members/ | Admin+ | Add a member (triggers project-access cascade). |
| DELETE | /api/v1/workspace/groups/{id}/members/{user_id}/ | Admin+ | Remove a member (triggers cascade). |
| POST | /api/v1/workspace/groups/{id}/projects/ | Admin+ | Link group to a project with a conferred role (triggers cascade). |
| DELETE | /api/v1/workspace/groups/{id}/projects/{project_id}/ | Admin+ | Unlink group from a project (removes group-conferred memberships). |