API authentication
TruePPM uses JWT auth with a split-token model: the short-lived access token
is returned in the JSON body and held in memory by the client, while the
long-lived refresh token is delivered in an httpOnly, Secure,
SameSite=Strict cookie that JavaScript can never read. This protects the
high-value refresh credential from theft via XSS — an injected script can ride
the current session but cannot exfiltrate the refresh token.
Because the refresh token lives in a cookie, browser clients must send
credentials on the auth requests (fetch(..., { credentials: "include" }) or
xhr.withCredentials = true).
The access token is short-lived by design: 15 minutes (SIMPLE_JWT["ACCESS_TOKEN_LIFETIME"]).
Clients are expected to refresh well before it expires rather than wait for a
401 — see Refresh the access token below.
Log in
Section titled “Log in”POST /api/v1/auth/token/Content-Type: application/json
{"username": "...", "password": "...", "remember_me": false}username accepts either the account’s username or the email address on
the account. The username is matched first and the email is tried only if that
fails, so an existing username-based integration is unaffected — and an account
whose username is itself email-shaped is never displaced by a different account
carrying that string as its email. The field keeps its name for wire
compatibility; there is no second field and no second endpoint.
Email resolution is deliberately narrow, because Django’s user model puts no uniqueness constraint on the email column:
- An address held by more than one account is refused, not resolved to either. Signing a caller into an account they did not name is the failure this avoids, and it is the reason the endpoint does not simply pick the lowest id.
- Every refusal is the same
401with the same body — wrong password, no such email, and an ambiguous email are indistinguishable, so the endpoint is not an account-existence oracle. The response never names the resolved username. - Both login throttles still bound the attempt, and the per-account throttle
counts and enforces against the account rather than the address — an
email-form attempt is refused with
429once the account’s budget is spent, in whichever order the two identifiers were tried. Answering to two identifiers does not buy an attacker two guess budgets.
Returns only the access token in the body:
{"access": "<jwt>"}Failures are a {"detail": "..."} body: 401 for invalid credentials, and
403 when password sign-in is disabled for the account by policy (for example,
enforced single sign-on). Both are declared in the OpenAPI schema.
The refresh token is set in a response cookie (default name trueppm_refresh),
scoped to Path=/api/v1/auth/token/refresh/ so it is sent only on the refresh
request and never on ordinary API calls:
Set-Cookie: trueppm_refresh=<jwt>; HttpOnly; Secure; SameSite=Strict; Path=/api/v1/auth/token/refresh/Pass the access token on all subsequent requests:
Authorization: Bearer <access_token>remember_me and refresh-token lifetime (ADR-0544)
Section titled “remember_me and refresh-token lifetime (ADR-0544)”The optional remember_me boolean on the login body controls both the
refresh JWT’s exp and whether the refresh cookie survives browser close. The
lifetime is conditional on the flag — it is not simply “long-lived”:
remember_me | Refresh token exp | Cookie | Behavior |
|---|---|---|---|
true | 30 days (TRUEPPM_REFRESH_TOKEN_REMEMBER_DAYS, default 30) | Persistent (Max-Age set) | Survives browser close; a deliberate opt-in to a long-lived credential on a trusted device. |
false (default, or omitted) | 12 hours, sliding (TRUEPPM_REFRESH_TOKEN_SESSION_HOURS, default 12) | Session cookie (no Max-Age) | Dies when the browser closes. Each refresh rotates the token and re-mints the 12h window, so an actively-used session never expires mid-work — the 12h ceiling only bites after 12h of idle time with the browser still open. |
The choice is carried as a remember claim inside the refresh JWT itself (not
server-side state), so it survives rotation automatically. SSO logins
(below) have no checkbox and are always session-scoped (remember_me is
implicitly false). A refresh token minted before this behavior shipped (no
remember claim) keeps the legacy 7-day persistent cookie unchanged — nobody
already logged in is forced to re-authenticate or silently downgraded to a
session cookie.
Refresh the access token
Section titled “Refresh the access token”POST /api/v1/auth/token/refresh/The refresh endpoint reads the refresh token from the cookie — it is no longer accepted in the request body, so the request has no body. It returns a new access token:
{"access": "<jwt>"}A request that arrives without a valid refresh cookie returns 401. When refresh
rotation is enabled the cookie is re-issued (rotated) on each successful refresh;
the previous token is blacklisted if the blacklist app is installed.
The
TokenRefresh/TokenRefreshRequestbody schemas are intentionally gone from the OpenAPI document — the refresh endpoint takes no request body.
Log out
Section titled “Log out”POST /api/v1/auth/logout/Clears the refresh cookie and best-effort blacklists the presented refresh token
(when the blacklist app is installed). Idempotent — always returns 205 Reset Content, whether or not a cookie was present.
The legacy bare AUTH_REFRESH_COOKIE_* names are still accepted as fallbacks.
| Setting | Default | Purpose |
|---|---|---|
TRUEPPM_AUTH_REFRESH_COOKIE_NAME | trueppm_refresh | Cookie name for the refresh token. |
TRUEPPM_AUTH_REFRESH_COOKIE_PATH | /api/v1/auth/ | Restricts the cookie to the auth endpoints that read it (refresh and logout). |
TRUEPPM_AUTH_REFRESH_COOKIE_SAMESITE | Strict | CSRF posture — the cookie is never sent cross-site. |
TRUEPPM_AUTH_REFRESH_COOKIE_SECURE | True | HTTPS-only cookie. Set False only for non-TLS local development. |
Project-scoped API token (projectApiTokenAuth)
Section titled “Project-scoped API token (projectApiTokenAuth)”The inbound task-sync surface (and the
CI acceptance-result ingest endpoint, POST /api/v1/projects/{id}/acceptance-results/,
ADR-0148 — see Acceptance criteria) use a separate,
non-JWT scheme. Mint a token in Project settings → API tokens; it is scoped
to a single project (or, for programs/{id}/api-tokens/, to every project in a
program) and authorizes only these two endpoints (ADR-0068). Send it as a
bearer token:
POST /api/v1/projects/{project_id}/task-sync/Authorization: Bearer tppm_<64-hex>The schema advertises this scheme as projectApiTokenAuth. It is deliberately
not interchangeable with the JWT session — a logged-in user cannot call
task-sync with their normal credentials, so every inbound push is attributable
to a minted token. A token whose project does not match the URL returns 401
(not 403) so callers cannot enumerate project existence.
The token’s minter is also checked on every request, and a failure there returns
the same 401 — {"detail": "Token does not authorize this project."}. A
program-scoped token’s minter must hold a live membership on the target project.
That membership must also be Member or above, and
a project-scoped token is checked too — its minter’s last recorded role on
the project, live or removed, must be Member or above. A minter demoted to
Viewer, or demoted and then removed, gets a 401; a minter removed in good
standing does not. A token whose minter’s account has been deleted is refused
with a 403, because it authenticates as no user.
A push into an archived project is refused with a 403, and writes nothing —
no task, no external-link row, no audit entry. Archiving makes a plan read-only,
and that is a property of the plan rather than of the caller, so the refusal
clears for no token and no scope: re-minting a legacy:full token will not get
past it and neither will retrying. The project has to be unarchived, after which
the same push succeeds unchanged. The 401 above is checked first, so a token
that does not authorize the URL project never learns whether it is archived
(#3413).
The only scope this endpoint mints is the full-access scope (legacy:full;
named api:full from 0.5, see the note below). Sending
{"scopes": ["mcp:read"]} to POST /api/v1/projects/{id}/api-tokens/ (or the
program equivalent) is a 400: a token minted at project or program scope has no
owner, and the MCP read surface accepts owner-scoped (personal) tokens only, so
such a token could read nothing at all. Mint MCP credentials from
POST /api/v1/me/api-tokens/
instead.
Personal Access Tokens (/api/v1/me/api-tokens/, ADR-0214)
Section titled “Personal Access Tokens (/api/v1/me/api-tokens/, ADR-0214)”GET /api/v1/me/api-tokens/POST /api/v1/me/api-tokens/DELETE /api/v1/me/api-tokens/{id}/A Personal Access Token (PAT) is a tppm_-prefixed, user-owned credential
minted from your own account rather than a project or program. POST returns
the raw token exactly once; it is never retrievable again. Two scopes on
create (scopes, defaulting to ["legacy:full"]): legacy:full (acts as
you, no expiry required) or mcp:read (safe methods only, expiry
required). Capped at 10 active tokens per user, and every PAT is revoked
automatically when the owning account’s password changes. DELETE
soft-revokes; both mint and revoke are audited. See
Personal Access Tokens for the full
walkthrough (creating, scope picker, the MCP-client config snippet) and
MCP server for connecting an AI client with an
mcp:read token.
A legacy:full PAT authenticates the general API — reads and writes — exactly
as your own session would (personalApiTokenAuth in the schema, #2547).
OwnerScopedApiTokenAuthentication is in the API’s default authentication
stack (prepended before JWT): it accepts an owner-scoped token carrying
legacy:full on any endpoint your JWT session could already reach, subject to
the identical RBAC — a Viewer’s PAT can only read what a Viewer sees, and a
PAT never elevates its owner’s role. Two narrower surfaces are unaffected by
this and keep their existing, more restrictive rules:
-
mcp:read-only tokens stay confined toMcpReadableViewMixin. That mixin is not a list of fifteen read-only endpoints: it is mixed onto the primary CRUD viewsets — Task, Project, Risk, Label, Sprint, Program, backlog item, board config — plus a dozen read-only views (your profile, project/program overview, forecast, schedule derivation, Monte Carlo, search, My Work, workspace assets) — close to 200 routes once each viewset’s actions are counted, not fifteen. What the mixin adds is a set of agent guards, and that distinction is the whole contract:- an
mcp:readtoken gets safe methods only (writes403), must be owner-scoped, and is subject to the instance kill switch and the per-project agent opt-out — see MCP server; - a
legacy:fulltoken reads and writes here exactly as on any other endpoint, governed by the same RBAC as its owner’s session. It is not an agent credential, so none of the agent controls apply to it (#2877).
A project- or program-scoped token is rejected on this surface outright (
401), whatever its scope. And anmcp:read-only token is rejected everywhere else — it is deliberately not interchangeable withOwnerScopedApiTokenAuthentication. - an
-
Token management is session-only.
/me/api-tokens/,/projects/{id}/api-tokens/,/programs/{id}/api-tokens/and the twoapi-token-audit/reads refuse any token-authenticated caller with a403, whatever its scope (#2878). A token cannot mint a token, list its siblings, or revoke one, so revoking a leaked credential is actual containment rather than a step an attacker has already worked around. Manage tokens from a signed-in session; for an operator-side sweep seerevoke_api_tokens. -
Revocation outlives the scope’s lifecycle. Revoking (
DELETE) a project token still works on an archived project, and revoking a program token still works on a closed program, because both stay readable and a leaked token keeps that read access until it is revoked. Minting a new token on either is refused with a403. -
SSO provider configuration is session-only too.
/workspace/sso/providers/,/workspace/sso/providers/{slug}/and/workspace/sso/providers/{slug}/test-connection/refuse token callers the same way, on every method including the reads. Provider configuration decides who may become a member and at what role, so a token that could widen a provider’s allowed domains and switch on auto-create at the Admin default role would turn one leaked credential into a durable admin account that revoking the token does not reach. Configure providers from a signed-in session.The refused
403carries the same body in both cases: adetailstring plus arefusalenvelope of{"verdict": "refused", "reason": "policy", "constraint": "capability_scope"}. A token that is revoked, expired, or carries the wrong scope never reaches that check — the authenticator answers401withreason: identityfirst. -
TaskSyncViewand the acceptance-result ingest endpoint (above) still requireIsTokenForProject— the token’sproject/programFK must resolve to the URL’s project. A personal token has neither set, so a PAT still cannot authenticate inbound sync or CI acceptance ingestion; those two endpoints remain project/program-token-only by design (they attribute every push to a minted, team-visible integration credential, not an individual’s personal one).
Single sign-on (OIDC / OAuth2)
Section titled “Single sign-on (OIDC / OAuth2)”Self-service login against your own identity provider (built-in presets for Keycloak, Authentik, Zitadel, Okta, Auth0, Microsoft Entra ID, Google, GitLab and GitHub, plus Generic OIDC for any other OIDC-compliant IdP such as Authelia) is a three-endpoint browser redirect flow, configured per-provider under Workspace settings → SSO providers. All three are unauthenticated and public by design — they are the login flow:
| Method | Path | Purpose |
|---|---|---|
| GET | /api/v1/auth/oidc/discover/?email= | Which enabled provider(s) apply to an email’s domain (or all enabled providers with no email). Always 200; never reveals whether an account exists. |
| GET | /api/v1/auth/oidc/login/?provider=<slug> | Starts the flow for one provider: mints a single-use state/PKCE/nonce and 302s to the IdP’s authorization endpoint. |
| GET | /api/v1/auth/oidc/callback/?code=&state= | The IdP redirects here. On success: validates state, exchanges the code, verifies the ID token (or fetches GitHub userinfo), resolves or creates the local user, sets the refresh cookie, and 302s to the SPA completion route — no token ever appears in a URL. On failure it 302s to the same completion route with a non-sensitive ?error= code (see SSO error codes). |
SSO-authenticated sessions are always session-scoped (12h sliding, session
cookie) — there is no remember_me checkbox in an IdP redirect, so the safe
default applies unconditionally. The admin-facing provider CRUD
(/api/v1/workspace/sso/providers/) is a separate, authenticated surface — workspace
Admin on every method, and session/JWT only: it refuses API tokens, reads
included (see the top of this page). See
Workspace Settings and
Single sign-on.
This is deliberately basic, self-service login federation — OSS per the auth carve-out: an admin points TruePPM at their own IdP and users log in through it. SAML federation, SCIM provisioning, LDAP/AD directory sync, enforced org-wide SSO, and group→role mapping are Enterprise org-identity governance, not part of this surface.