Skip to content

Webhooks, sync and sharing API

Webhooks are scoped to a project or a program:

MethodPathDescription
GET/api/v1/projects/{id}/webhooks/List (also /programs/{id}/webhooks/)
POST/api/v1/projects/{id}/webhooks/Create
GET/api/v1/projects/{id}/webhooks/{wid}/Retrieve
PUT / PATCH/api/v1/projects/{id}/webhooks/{wid}/Update
DELETE/api/v1/projects/{id}/webhooks/{wid}/Delete
POST/api/v1/projects/{id}/webhooks/{wid}/test/Send a test ping (Project Manager+)
GET/api/v1/projects/{id}/webhooks/{wid}/deliveries/Delivery history, cursor-paginated (Admin)

On a closed program, creating or updating a program webhook returns 403. Deleting one still works: the program’s projects keep accepting writes, so its webhooks keep delivering, and deleting is how you stop that without reopening the program. The test ping and delivery history also stay available.

TruePPM emits 19 event types across tasks, dependencies, schedule, projects, sprints, risks, baselines, and comments. The full catalog — every event name, what triggers it, the payload shape, HMAC signature verification, request headers, delivery ordering and gap detection, and the retry schedule — is documented in Webhooks. Start there before subscribing:

The signing secret (used to HMAC-sign delivered payloads) is write-only and follows a one-time-secret model:

  • It is never returned on GET, list, or update responses.
  • It is echoed back exactly once, in the 201 Created response body, so the caller can record it. Refetching the webhook afterward never exposes it again — if the secret is lost it must be rotated by supplying a new one.
  • If omitted or left blank on create, a cryptographically strong secret is auto-generated (token_urlsafe(32), ~43 URL-safe characters) and returned in that one-time create response.
  • A supplied secret must be at least 32 characters. A whitespace-only value is rejected; blank is treated as “auto-generate”. Validation failures return 400.
  • Reads expose only secret_set — a boolean saying whether a secret is stored.
  • It is encrypted at rest, so there is no path (API, database dump, or admin) to the plaintext after that one-time create response.
  • Webhook create is exempt from Idempotency-Key for exactly this reason: the response carries a value that must not be persisted for replay. See Idempotency.
MethodPathDescription
GET/api/v1/projects/{id}/sync/Pull delta changes
POST/api/v1/projects/{id}/sync/Push a batch of offline changes

See Offline Sync.

The push endpoint accepts a batch of created / updated / deleted task rows with a client-generated client_batch_id for idempotent replay. Two boundary rules:

  • Idempotency replay is scoped per actor. A repeated batch with the same client_batch_id from the same authenticated user replays the original stored response. A different user who reuses the same client_batch_id gets a fresh batch — never the original actor’s response — because the stored response carries that actor’s task ids, server versions, and sync watermark. Replay never crosses the project or the user boundary.
  • Cross-project id collisions return 409. A created row whose client-generated id collides with a task that lives in another project returns 409 Conflict with a detail message telling the client to regenerate the id and re-upload — the server will not silently mutate a task in a project the caller’s URL scope does not own. The exception is internally tagged sync_id_collision, but — verified against the current DRF exception path — that tag is not serialized onto the response body; branch on the 409 status, not on a code field. See issue #2550.
MethodPathDescription
GET / POST / DELETE/api/v1/me/credentials/{provider}/Connect, read, or revoke your own credential for an external provider (ADR-0049)
GET / PUT / PATCH / DELETE/api/v1/me/connections/{source}/Your personal, read-only external task-source connection (ADR-0097 §3 — the OSS carve-out: user-scoped and one-way). PATCH takes poll_enabled alone. Session/JWT only — a personal access token gets 403
POST/api/v1/me/connections/{source}/sync/Trigger a manual pull of your connection; returns 202 {"queued": true}
GET/api/v1/me/external-items/Your cached external work items, for the My Work external section
GET / PUT/api/v1/integrations/projects/{project_id}/git-automation/A project’s Git-event board-automation config (Project Manager+, ADR-0158)
POST/api/v1/integrations/projects/{project_id}/git-automation/rotate-secret/Rotate the webhook signing secret
POST/api/v1/integrations/projects/{project_id}/git-webhook/Inbound Git-event receiver (unauthenticated by session; verified by the rotatable secret). Every refusal before signature verification — no automation, disabled, no secret, unknown provider, an undecryptable secret, bad signature — returns the same 404, so the endpoint cannot be used to discover which projects have automation configured; bodies over 1 MB get a 413

PUT /api/v1/me/connections/{source}/ takes jql and project_keys, which compose rather than compete: project_keys is applied as an additional AND project IN (...) on top of jql (or on top of the default “assigned to me and not done” when jql is blank), so it can only narrow the pull. Each key must be a Jira project key — a letter followed by letters, digits or underscores — and is stored upper-cased and de-duplicated; anything else is a 400 on the field. jql must have balanced parentheses and quotes for the same reason (the narrowing wraps it), and an unbalanced value is likewise a 400.

GET /api/v1/me/connections/{source}/ returns a last_sync object describing the outcome of the last pull: {at, ok, reason, fetched, stored, total_available, truncated}. fetched is what the provider returned on this pull; stored is what survived the cache cap and de-duplication, and is therefore the “first N” a user is shown. total_available is the provider’s own count of everything matching your filter, or null when it did not report one — null means unknown, never zero, so do not render it as a denominator. truncated means the source had more than this pull carried (a pull is one page — 100 items for Jira — and the cache is capped at 500 rows per source), so the items you see are the first stored of your assigned work. On a failure reason is a token from a fixed set — auth_failed, invalid_filter, unreachable, rate_limited, credential_unreadable — deliberately never a formatted message, so nothing from the request URL or the provider’s response can reach it; an unrecognized value is served as "".

last_sync is null in two cases: before the connection’s first pull completes, and after any successful PUT /api/v1/me/connections/{source}/. The PUT rebuilds the stored config from its payload and deliberately discards the previous outcome — that outcome described a pull made with the old token and filter, so carrying it onto a re-connect would report a count, or a truncation, that no longer applies. PUT returns the same summary object as GET.

The same last_sync object rides on each external_sources row of GET /api/v1/me/work/.

PATCH /api/v1/me/connections/{source}/ takes exactly one field, poll_enabled, and turns the background poll (ADR-0097 §4) on or off for your connection. It is a separate verb from PUT because PUT requires secret, which is write-only and can never be read back — reusing it would make re-entering your API token the price of changing one boolean. Anything else in the body is ignored, so this endpoint cannot rewrite a host, a token, or a filter. It returns the same summary object as GET, and 404s when you have no connection to that source; a connection belonging to another user is a 404 for the same reason every other action here is scoped — the (user, source) filter is the only lookup.

poll_enabled also appears on the summary and is accepted by PUT. On PUT it is the one config key that is preserved when omitted: the rest of the stored config is rebuilt from the payload, but silently switching a connection’s polling off on every token rotation would be a change the caller never asked for. Send poll_enabled: false explicitly to turn it off. A connection whose status is auth_failed or invalid_filter is skipped by the poll regardless of the flag — those states need a re-connect, and polling them would spend a request per tick to fail the same way.

The org-wide, admin-configured, bidirectional Integration Hub is Enterprise; everything in this table is the OSS carve-out — a personal, one-way credential or connection, or a single project’s own Git automation. See Webhooks for the outbound event side.

The per-user notification matrix is one row per (event_type, channel) pair. The first GET lazily backfills the default matrix for a user who has none.

MethodPathDescription
GET/api/v1/me/notification-preferences/Your full matrix (paginated)
PATCH/api/v1/me/notification-preferences/{id}/Toggle one row — only enabled is writable
POST/api/v1/me/notification-preferences/apply-preset/Apply a preset across the whole matrix

Project-scoped routing is a separate, per-(project, user) document:

MethodPathAuthDescription
GET/api/v1/projects/{id}/notification-preferences/Any project memberYour routing for this project. Lazily created on first read.
PATCH/api/v1/projects/{id}/notification-preferences/Any project memberPartial update; the matrix is merged, not replaced.

Each member reads and writes only their own row — there is no admin surface for editing another member’s routing, and the row is resolved from the authenticated user rather than from a path segment.

Alongside the stored window (quiet_hours_enabled, quiet_hours_from, quiet_hours_until), the response carries the zone that window is actually read in. Both fields are read-only; PATCHing them is ignored.

FieldTypeDescription
quiet_hours_timezonestring (IANA)The zone quiet_hours_from / quiet_hours_until are interpreted in, e.g. "Asia/Tokyo".
quiet_hours_timezone_sourceenumWhich tier of the chain supplied it: project, workspace, server, or fallback.

The chain is the project’s own timezone, then the workspace timezone, then the server’s TIME_ZONE, then UTC; an unparseable value at any tier falls through to the next. In normal operation only project and workspace occur — server means no workspace row exists yet, and fallback means no tier was usable at all. These two fields shipped in 0.4; see Project notifications.

Both methods return the same document, published as the ProjectNotificationPreferenceDocument schema — the stored row plus two fields the view adds:

FieldTypeDescription
event_deliveryobject of event_type → booleanWhether a delivery path is wired for that matrix row. false means the row is stored and honored but nothing dispatches it yet, so render it as such rather than implying a delivery that never happens.
channel_deliveryobject of channel → booleanWhether TruePPM delivers on that matrix column at all. false means the column is rendered and the preference stored, but nothing delivers on it yet and no setting anywhere turns it on — so label it rather than imply a delivery that never happens.

Both fields shipped in 0.4. They are independent axes: a cell delivers only when its event is dispatched and its channel delivers. Both are server-global — they report server wiring, not anything about the user or project whose document carries them — and both are read-only. Read them rather than hard-coding either list: a client-side copy drifts the moment a delivery path lands.

apply-preset takes a preset name, not a preference row:

{ "preset": "signal_only" }

signal_only turns in-app on for the two attention-worthy events (a task being blocked, a due date moving) and turns every other pair off — the escape from a noisy default without auditing the grid cell by cell. everything restores the shipped defaults. Any other value returns 400.

The response is the full rewritten matrix as a bare JSON array, not the paginated {count, results} envelope the list route returns and not a single preference object — apply the array to your local state directly rather than refetching.

Do Not Disturb and the digest schedule use GET /api/v1/me/notification-settings/ and PATCH /api/v1/me/notification-settings/; see Do Not Disturb.

A user-defined @mention group is a named alias for a curated set of people, so a comment can address @design-review instead of five usernames. Groups are scoped to a project or to a program; the two surfaces are mirrors of each other and take identical payloads.

MethodPathDescription
GET / POST/api/v1/projects/{project_pk}/mention-groups/List / create a project group
GET / PATCH / DELETE/api/v1/projects/{project_pk}/mention-groups/{id}/Retrieve, rename, or soft-delete one
POST/api/v1/projects/{project_pk}/mention-groups/{id}/add-member/Add one member to the roster
POST/api/v1/projects/{project_pk}/mention-groups/{id}/remove-member/Remove one member from the roster
POST/api/v1/projects/{project_pk}/mention-groups/{id}/mute/Mute the group for yourself
POST/api/v1/projects/{project_pk}/mention-groups/{id}/unmute/Unmute it for yourself
GET / POST/api/v1/programs/{program_pk}/mention-groups/The program-scoped mirror of the whole table above

add-member and remove-member take a body, and it is required:

{ "user": 42 }

user is the integer id of an active project (or program) member; a stringified integer such as "42" is also accepted.

The response to all four actions is the group’s read shape — id, name, members (id + username only — no email, so a program Viewer reading a program group’s roster never sees a member’s address from a project they cannot otherwise see), member_count, and muted_by_me, the per-user override reflecting whether the calling user has muted it. Omitting user returns 400 {"user": "This field is required."}; naming an unknown id, an inactive account, or someone who is not a member of the project (or, for a program group, of any project in the program) all return the same 400 body — the refusal does not reveal which of the three happened, so it cannot be used to probe whether a given user id exists.

mute and unmute take no body. They act on the caller’s own subscription only — there is no way to mute a group on someone else’s behalf.

Roles differ per action. On a project group: Project Manager+ creates, renames, and deletes; Resource Manager+ curates the roster; any member mutes or unmutes. On a program group the lifecycle actions are Program Admin-only and roster curation is Program Manager+. A group in an archived project or a closed program is read-only.

MethodPathDescription
GET/api/v1/assets/?mine=&program=&kind=&label=&provider=&q=&cursor=&page_size=Workspace-wide feed across every project the caller can read
GET/api/v1/projects/{id}/assets/?kind=&label=&provider=&q=&cursor=&page_size=One project’s feed (Viewer+; readable even on an archived project)
GET/api/v1/programs/{id}/assets/?kind=&label=&provider=&q=&cursor=&page_size=A program’s feed, aggregated across its member projects

Read-only, cursor-paginated aggregation of every task’s file attachments and external links (ADR-0215/ADR-0428). The workspace tier never surfaces an asset from a project the caller cannot already open — it grants no new reach, which is what keeps it OSS rather than a portfolio-governance surface. ?mine=true hard-scopes to the caller’s own assigned tasks; there is no ?user= escape hatch. See Assets.

These endpoints ship in 0.5. See Project status updates.

MethodPathDescription
GET/api/v1/projects/{id}/status-updates/The history, newest first, page-number paginated (project members)
POST/api/v1/projects/{id}/status-updates/Post {rag, narrative}; the server freezes the snapshot (Project Manager+, signed in; API tokens are refused)
GET/api/v1/projects/{id}/status-updates/{update_id}/One update with its frozen snapshot and live_diff (project members)

There is no PUT, PATCH or DELETE: a posted update is immutable, and a correction is a new post. A status-update share link is minted on /share-links/ with content_kind: "status_update" and the status_update id; its public endpoint returns the same 404 for every unavailable link, revoked and expired included.

MethodPathDescription
GET / POST/api/v1/projects/{id}/share-links/List / mint a public link (Project Manager+)
POST/api/v1/projects/{id}/share-links/{link_id}/revoke/Revoke a link (Project Manager+, idempotent)
GET/api/v1/share/board/{token}/Public, unauthenticated board snapshot
GET/api/v1/share/schedule/{token}/Public, unauthenticated schedule/Gantt snapshot
GET/api/v1/share/status-update/{token}/Public, unauthenticated snapshot of one posted status update (ships in 0.5)

The board and schedule endpoints return 410 for a revoked link and a uniform 404 for an unknown token or a disabled instance-wide sharing kill switch (so a caller cannot distinguish “never existed” from “feature disabled”). The status-update endpoint returns the same 404 for every unavailable link: unknown, revoked, expired, for a project in Trash, blocked by the sharing policy, minted by a deactivated account, or the kill switch. All three support ETag/If-None-Match (304 on an unchanged snapshot). See Board sharing.

MethodPathDescription
GET/api/v1/agent-actions/List the append-only, hash-chained log of MCP/agent decisions
GET/api/v1/agent-actions/{id}/Retrieve one action record

Read-only team-visible audit trail (ADR-0112). See Agent oversight.

MethodPathDescription
GET/api/v1/users/search/Typeahead over workspace users, for the member-invite / mention-group pickers

GET /api/v1/me/search/ is the omni-search behind the global search box; its parameters and response are in the interactive schema.

Throttled at user_search (60/min per user — see Rate limiting) to bound bulk scraping of the user directory.