Project templates and import API

MethodPathDescription
GET/api/v1/project-templates/Gallery (filter: ?program=)
POST/api/v1/project-templates/publish/Freeze a project’s shape as a template
POST/api/v1/project-templates/{id}/apply/Apply to a project — returns 202
GET/api/v1/template-applications/Adoption records (filter: ?project=)
POST/api/v1/template-applications/{id}/undo/Reverse one application

Both writes take a JSON body. publish requires project and name; apply requires project:

// POST /api/v1/project-templates/publish/
{
"project": "<uuid>", // required — the project to freeze
"name": "House shape", // required — trimmed, truncated at 200 chars
"description": "…", // optional — truncated at 2000 chars
"source_kind": "workspace", // optional — provenance chip, defaults to workspace
"new_version": true // optional — publish v(n+1) instead of getting a 409
}
// POST /api/v1/project-templates/{id}/apply/
{"project": "<uuid>"} // required — the project to seed

name and description are truncated, not rejected, when they exceed their limits. new_version is read permissively: true, "true" and "1" all enable it, anything else is false. Publishing under a name that already exists in the pool you can see returns 409 with code: name_taken and a next_version — resend with new_version: true to extend that template’s chain.

apply returns 202 {"queued": true, "application": "<uuid>"} — not a task id. Dispatch is best-effort behind a transactional outbox, so there may be no Celery id yet (or ever, for a delivery the drain re-dispatches). The application id is the durable handle: it exists the moment the request commits, and GET /api/v1/template-applications/{id}/ reports pending → running → success / failed.

On success, result_summary carries tasks_created, milestones_created and dependencies_created. Starting with 0.5 it will also carry warnings, a list of sentences naming every link the document held but the apply did not write. Today the only such link is a Start-to-Start or Start-to-Finish link out of a summary task, which the scheduler cannot honor (ADR-0370). The key is absent when nothing was skipped.

The gallery does not publish the structure document. A gallery reader is a wider audience than the source project’s members, so a whole project’s shape (task names included) must not ride a list endpoint. task_count is the server’s count off the frozen document, so it cannot disagree with what apply will write.

provenance is the display chip. source_kind is stored, so every reader agrees on workspace and community; Yours is resolved per reader, because it is the only tier that depends on who is asking.

Publishing and applying both require Project Manager (Admin) or above on the project in question (ADR-0773). Reading the gallery requires only authentication.

Apply and undo are refused on an archived project with a 403, at every role including Owner — archiving makes a plan read-only, and that is a property of the plan rather than of the caller. Reads are unaffected: you can still list applications and poll one on an archived project. Publishing from an archived project still works, because extracting a template reads the source plan and writes nothing into it. Unarchive the target project first, then re-apply.

A failed application never leaves partial rows. The claim and the materialization share one transaction, so any failure rolls the whole seed back — there is no half-applied state for a client to detect or clean up, undo has nothing to reverse, and created_task_ids stays empty. Poll for error_detail and surface it; that is the whole recovery surface.

Because apply is asynchronous, a project archived after a 202 is refused at seeding time rather than at request time: the application lands on status: "failed" with error_detail naming the archived project, and no rows are written. Poll GET /api/v1/template-applications/{id}/ for it — there is no second 403 to catch, because the request that would have carried one already returned.

Apply is rate-limited on the shared seed_import throttle scope — the same bound the seed and spreadsheet import paths carry.

A phase is a non-subtask task with at least one structural (non-subtask) child. A phase is a pure rollup: its status, estimate, assignee, percent-complete, and logged time are all computed from its children and cannot be set directly. The task serializer exposes a read-only computed boolean, is_phase, alongside the existing is_summary:

  • is_summary — the task has any direct WBS child (including drawer subtasks).
  • is_phase — the task has at least one direct child that is not a subtask.

The distinction matters: a leaf broken into drawer subtasks is is_summary: true but is_phase: false, and stays fully writable. Only a task with real structural children is a phase.

Writing a rolled-up attribute directly onto a phase returns 400 with a stable error code. Each lock fires only when the request actually changes the locked attribute — a PATCH that omits the field, or re-sends its current value, still succeeds.

Write to a phaseError code
percent_completesummary_rollup_locked
statusphase_status_rollup_locked
optimistic_duration / most_likely_duration / pessimistic_durationphase_estimate_rollup_locked
assigneeassignee_on_phase
logging time against a phase (see Time tracking)time_log_on_phase

Phase → phase dependencies, baselines, and Monte Carlo are not restricted — those are derived/aggregate, not direct writes of leaf-owned values.

Indent requires the phase to already exist, so a flat list can only become structured from the top down. These two endpoints are the missing primitive: they let a planner type the work, look at it, select it, and then wrap it.

POST /api/v1/projects/{id}/tasks/group/ takes { "task_ids": [...], "name": "..." } and creates a phase at the position of the first selected row, moving the selection — and everything beneath it — inside. name is optional; omit it and the phase gets a placeholder, because the design names the phase last.

The server may wrap fewer rows than you sent, and says so. Two rules apply, in order: any row whose own ancestor is also in the selection is skipped (you cannot wrap a phase together with the work inside it), and the phase is then created on the parent shared by most of what remains. Every skipped row comes back in left_alone with a reason of ancestor_selected (plus the ancestor_id that covered it) or different_parent. Clients are expected to surface this — a group that silently wrapped four of your six rows reads as a defect.

POST /api/v1/projects/{id}/tasks/ungroup/ takes { "task_id": "..." } and does the reverse: the phase’s rows move up one level into its position, and the wrapper is soft-deleted. Only the wrapper goes — the lifted rows keep their ids, dependency edges, resource assignments and estimates, because nothing about them changes except their WBS path. Dependency edges attached to the wrapper itself go with it, as they do for any deleted task, and are listed in removed_dependency_ids rather than disappearing silently. A phase carrying drawer subtasks is refused with container_has_subtasks instead, since dissolving it would delete them.

Each endpoint is one transaction, and that is the reason it exists. Composing either from repeated tasks/{id}/reparent/ calls is N+1 un-transacted requests whose partial failure strands a half-made phase with some rows moved and some not. Here a rejection at any point — including the dependency-graph check that runs over the resulting tree — leaves the plan exactly as it was. That also makes the pair mutually reversible: ungrouping a phase you just created restores the previous layout in one request. The reverse is not lossless, because ungroup deletes the wrapper row.

Both require plan-authoring authority on the project, and per-row edit authority on every row that moves — so a Team Member may wrap their own assigned rows but not a colleague’s, and one row they cannot touch refuses the whole operation rather than applying part of it.

POST /api/v1/projects/{id}/tasks/bulk/ applies many task writes in one request. It is the endpoint behind paste-many, import, and agent-authored drafting.

Rows apply independently, and the response is 207 — not 200. One unparseable row out of 38 does not discard the other 37. Every operation is reported in exactly one of three buckets:

{
"applied": [{ "index": 0, "id": "…", "op": "create", "outcome": "created", "task": { } }],
"rejected": [{ "index": 7, "id": null, "code": "malformed_id", "message": "…" }],
"skipped": [{ "index": 9, "id": "…", "code": "tombstoned", "message": "…" }],
"dependencies": { "applied": [], "rejected": [] },
"capabilities_denied": [],
"operation_id": "7c2e…9f",
"can_undo": true
}

index — the zero-based position of the operation in the request’s operations array — is the correlation handle, not id. A row rejected because its id could not be parsed has no usable id to echo back, and a create may legitimately omit one.

skipped is a documented no-op, never a failure: a create whose id matches a deleted row, or a classification that crossed a milestone gate.

The schema publishes code, and the set is open. It is emitted as the TaskBulkRefusalCodeEnum component, so a generated client types it as a union rather than as string and you can branch on it without reading our source. The “Retry” column is the distinction the enum exists to let you make. The component is marked "x-trueppm-enum": "open" (see Open and exhaustive enums), so a later release may add a code. Treat a code you do not recognize as a refusal that is not retryable: report the row as failed and do not resend it unchanged.

codeMeaningRetry?
malformed_idid was not a UUID. Reported before any database query runsNever — the row is wrong
id_unavailableThe id cannot be used. Deliberately non-asserting — it does not reveal whether the id exists in a project you cannot seeNever
not_foundNo such task in this projectNever
forbiddenYour role does not permit this row’s operationOnly after a role change
invalidThe row body failed validationNever — fix the row
conflictA database constraint rejected the rowYes — it may be a lost race
cyclic_dependency / self_referenceThe edge would make the schedule infeasibleNever
unresolved_endpointAn edge endpoint is not a live task in scopeYes — the endpoint may exist later
tombstonedA create whose id matches a deleted row here. A skipped no-op, not a failureNo — same request, same non-answer
milestone_gateA cascade crossed a milestone, which is a gate rather than a failure. Also a skipped no-opNo

The structural-undo surface publishes its own separate set as StructuralUndoBlockedReasonEnum (undo_blocked_reason on a StructuralOperation, and code in the 409 from POST .../undo/). Its values are already_undone, too_large, not_top_of_stack, shape_changed, forbidden — plus the empty string, which means the operation is undoable and is the value you will see most often.

Two fields govern the undo, and they answer different questions — read both before offering an Undo control. This is the same pair the classification cascade publishes, and it works the same way.

FieldAnswersnull / false means
operation_idIs there a ledger row to reverse?The batch created no rows, so nothing was recorded
can_undoMay this caller reverse it?Your role is below Project Manager on this project

POST /api/v1/paste-many-operations/{operation_id}/undo/ reverses the batch’s creates, and it requires Project Manager or above — a strictly higher floor than this endpoint admits. So a Team Member can receive a 207 here, with a real operation_id, and still be refused the undo. can_undo is that answer, computed from the same rule the undo endpoint enforces; read it rather than comparing role ordinals yourself.

can_undo is an authority answer only. It does not report the archived-project refusal (see Undoing a cascade below), and it does not promise the ledger row still exists: batch operations are purged after the deployment’s TRUEPPM_BATCH_OPERATION_RETENTION_DAYS window, after which the undo is a 404.

Every undo action returns its ledger row plus an undo object carrying what the reversal actually did. Read it: an undo deliberately leaves behind rows a person has edited since the batch wrote them, so a non-zero “kept” count means the plan still carries part of what you asked to remove.

Endpointundo keys
POST /api/v1/paste-many-operations/{id}/undo/deleted, kept
POST /api/v1/cascade-classification-operations/{id}/undo/reverted, kept
POST /api/v1/template-applications/{id}/undo/deleted, kept
POST /api/v1/structural-operations/{id}/undo/restored, created_removed, deleted_restored, dependencies_restored, dependencies_skipped

The structural undo is all-or-nothing, so its counts always describe a completed reversal — a refusal is a 409 with no summary at all, including one whose result would make a task that has since gained a Start-to-Start or Start-to-Finish link a summary again (code: "summary_start_link", with blocking_dependencies; ships in 0.5). A non-zero dependencies_skipped there means an edge was not re-created, so the restored graph is incomplete and the user has links to redraw: either its other end no longer exists, or (ships in 0.5) it is a Start-to-Start or Start-to-Finish link out of a task the undo makes a summary again (ADR-0370).

A create may carry its own id, and the server takes that UUID as the primary key verbatim — it is never remapped. This matches the offline sync push, so a row authored in the planner, pulled to a phone, edited offline, and pushed back travels under one id the whole way. Omit id and the server mints one.

A create whose id already exists in this project is not a duplicate and not an error: it applies as an in-place edit ("outcome": "updated") under the stricter edit permission, and never creates a second row.

An optional top-level origin names how the rows this batch creates were produced, which the server records on each created row’s source_kind (the same provenance column GET/history responses expose elsewhere). Omit it and rows record as hand-authored (source_kind: "hand") — the endpoint’s own default, unchanged. The only value accepted today is "paste", for a client submitting a pasted block of rows:

{
"operations": [{ "op": "create", "data": { "name": "Survey", "duration": 3 } }],
"origin": "paste"
}

An unrecognized origin is a 400 — it is validated against the listed values, not free text. A later release may accept more values (the enum is open). origin has no effect on update/delete ops or on a create whose id resolves to an existing row (that applies as an edit, and an edit never rewrites the row’s original provenance).

An optional dependencies.created bucket writes edges after every task row exists, so an edge may name a task whose create appears later in operations:

{
"operations": [
{ "op": "create", "id": "3f1c…a1", "data": { "name": "Survey", "duration": 3 } },
{ "op": "create", "id": "9b40…c7", "data": { "name": "Design", "duration": 5 } }
],
"dependencies": {
"created": [{ "predecessor": "3f1c…a1", "successor": "9b40…c7", "dep_type": "FS", "lag": 0 }]
}
}

Edges name plain task UUIDs — there is no positional or by-name reference syntax. Every edge is checked against the dependency-graph guard before any of them is written; a detected cycle refuses the edges on the cycle path and leaves the task rows applied.

Writing edges needs a higher role than writing rows, and this is the one part of the endpoint that is easy to get wrong when provisioning a service account. The check is per edge, so a Team Member’s task rows still apply while only their edge rows are refused — a partial success, not an error.

RoleTask rowsDependency edges
Team Member✅❌ forbidden per edge
Resource Manager❌ 403 on the whole request❌
Admin✅✅
Owner✅✅

Read that middle row carefully. The edge check names the Resource Manager band, but who may create a task excludes that band from this endpoint entirely — so a Resource Manager token is refused outright and never reaches the edge gate its own role appears in. A service account that writes dependencies through this endpoint must be Project Manager or above.

That is a property of this endpoint, not of the role. A Resource Manager may author dependency edges — see POST /api/v1/dependencies/, which gates on IsProjectScheduler and admits the band. The two rules do not nest: task content admits Team Member, Admin and Owner and excludes Resource Manager, while dependency edges admit Resource Manager, Admin and Owner and exclude Team Member (ADR-0773 §7). Each admits exactly the band the other refuses. This endpoint writes both in one request and so applies the stricter of the two at the door, which is why the band that may draw an edge cannot draw one here.

When a caller’s role cannot author edges at all, the response says so once, at the top level, rather than leaving you to infer it from N rejected edges:

{ "capabilities_denied": ["dependencies"] }

It is [] whenever every capability the request used was available — including a batch that carried no edges, which is not the same claim as “this caller could have written them”. The per-edge dependencies.rejected entries are unchanged and still present; capabilities_denied explains them, it does not replace them.

  • At most 500 operations and 500 dependency edges per request.
  • Send an Idempotency-Key header. A byte-identical replay returns the stored 207 with Idempotent-Replay: true and performs no writes at all — see Idempotency.
  • Whenever any row commits, the schedule is recalculated and a tasks_bulk_mutated event is broadcast carrying only the ids that actually changed.

Authoring the plan requires Team Member or above. The Resource Manager role is excluded: it sits above Team Member in the role order but cannot edit task content, so it could otherwise create rows it was then unable to change. Read can_author on the project resource rather than comparing role ordinals yourself.

PATCH /api/v1/projects/{id}/tasks/classification/ declares how a subtree is governed and how it is delivered, in one call.

These are two orthogonal fields, not one choice.

FieldValuesMeansInherit bit
governance_classgated · flow · hybriddeclares how the subtree is governedyes (parent_governance_inherited)
delivery_modewaterfall · scrum · kanban · milestonehow work is executed, estimated, rolled upno

The two are not read to the same depth, and it matters if you are integrating. delivery_mode changes what the server computes — rollup, Monte Carlo sampling, schedule presentation. governance_class is stored, inherited, cascaded and returned faithfully, but only one thing branches on its value today: the gates count in a project template’s structure. Set it to describe your plan; do not expect a different rollup or forecast because a subtree is gated.

scrum and kanban are not interchangeable: a scrum node rolls up from story-point burndown and samples the team velocity distribution in Monte Carlo, a kanban node rolls up from item throughput. Send whichever the team actually runs.

{
"subtree": "3f1c…a1",
"cascade": true,
"governance_class": "gated",
"delivery_mode": "scrum",
"preserve_governance_overrides": true,
"skip_milestones": true
}

subtree is required — the generated OpenAPI schema marks every PATCH body field optional, which under-declares it. Supply governance_class, delivery_mode, or both — a request naming neither is a 400. cascade: false classifies the named task alone; otherwise the server resolves the subtree from the WBS and the caller sends no row list. A cascade cannot set delivery_mode to milestone — converting a task into a gate also has to zero its duration, so that stays a single PATCH on the task.

The response is 200, and it reports each axis separately:

{
"subtree": "3f1c…a1",
"matched": 24,
"rows_written": 21,
"governance": { "requested": "gated", "applied": 21, "unchanged": 0,
"overrides_kept": 1, "has_inherit_bit": true },
"delivery_mode": { "requested": "scrum", "applied": 21, "unchanged": 0,
"overrides_kept": null, "has_inherit_bit": false },
"skipped": [
{ "id": "9b40…c7", "code": "milestone_gate",
"axes": ["governance_class", "delivery_mode"], "message": "…" }
],
"operation_id": "7c2e…9f",
"can_undo": true
}

overrides_kept is null on delivery_mode — not 0. Only governance_class carries an inherit bit, so only it can have an override; zero would claim the data had none, where the truth is that the axis cannot have one. An axis you did not send is absent from the response entirely.

Three counts, three different questions — do not derive one from another. matched is how many rows the subtree resolved; rows_written is how many of them were saved; each axis’s applied is how many rows that axis changed. Summing the two applied values does not give you rows_written: a row changed on both axes is counted twice, and a milestone withheld on one axis but written on the other appears in only one of the two totals. applied also says nothing about columns — a governance write sets governance_class and parent_governance_inherited together. If you want “how many tasks did this change”, read rows_written.

  • Explicit governance overrides. A descendant that declared its own governance (parent_governance_inherited: false) keeps it, and is counted in overrides_kept. Send preserve_governance_overrides: false to overwrite it. The override is governance-only: that row still receives the cascaded delivery_mode.
  • Milestones. A milestone’s delivery_mode is never rewritten, under any request. is_milestone, delivery_mode: "milestone" and duration: 0 are three encodings of one fact, and a cascade that broke them would dissolve every gate in the phase. skip_milestones governs the governance axis on those rows only: leave it true and a milestone is untouched; send false and it takes the governance class but still keeps its delivery mode. Either way it appears in skipped with the axes that were withheld.

The subtree root itself is written with parent_governance_inherited: false — declaring a subtree’s governance is what breaking inheritance means — and its cascaded descendants with true.

  • At most 2000 resolved tasks. A larger subtree is a 400 with code subtree_too_large and the matched count; it is never truncated.
  • Permission is all-or-nothing. If you cannot edit every row in the subtree the whole request is 403 and nothing is written. Unlike batch task writes, a partially applied cascade would leave the plan asserting a split that is not true.
  • A project whose dependency graph is already cyclic is a 400 (cyclic_dependency) — the cascade triggers a recalculation, and an infeasible graph is refused before the schedule engine sees it. detail names the tasks in the loop by WBS code and name; offending carries their ids. See Errors and status codes.
  • Re-sending an identical request writes nothing: rows already at the requested values report under unchanged, and no recalculation or broadcast is triggered.
  • When something does change, the schedule is recalculated and a tasks_bulk_mutated event carries the ids that changed.

Authoring requires Team Member or above, with the same Resource Manager exclusion as batch task writes.

Two fields on the response govern the undo, and they answer different questions — read both before offering an undo affordance.

FieldAnswersnull / false means
operation_idIs there a ledger row to reverse?The cascade changed nothing, so nothing was recorded
can_undoMay this caller reverse one?Your role is below Admin on this project

POST /api/v1/cascade-classification-operations/{operation_id}/undo/ reverses the cascade, and it requires Project Manager or above — a strictly higher floor than the Team Member the apply above admits. So a Member can receive a 200 here, with a real operation_id, and still be refused the undo. can_undo is that answer, computed from the same rule the undo endpoint enforces; read it rather than comparing role ordinals yourself, exactly as with can_author on the project resource.

can_undo answers the role question only. Both batch undos — POST /api/v1/cascade-classification-operations/{operation_id}/undo/ and POST /api/v1/paste-many-operations/{operation_id}/undo/ — are separately refused with a 403 once the project is archived, at every role including Owner. Archiving makes a plan read-only; that is a property of the plan, not of the caller, so no role clears it, and can_undo does not report it. Reading a ledger row on an archived project still works — unarchive the project to undo.

can_undo rides the apply response, so it arrives after the irreversible act. To tell a caller before they commit a cascade that they will not be able to reverse it, read can_undo_batch_operations on the project resource (GET /api/v1/projects/{id}/, and on project list rows). It is the same predicate as can_undo, on a payload you already hold.

ReadWhenTo
Project.can_undo_batch_operationsBefore the writeDisclose that the act will not be reversible by this caller
can_undo on the apply responseAfter the writeDecide whether to offer an Undo control

Same caveats as can_undo: it is a role answer only, so it does not report the archived-project refusal, and it does not tell you whether any particular operation is still reversible — that is operation_id. Its scope is the batch-operation ledgers (cascade classification and paste-many). It does not answer for structural operations, whose undo rule is actor-or-Admin rather than a role floor: the person who applied one may reverse their own even below Admin.

GET /api/v1/import-templates/csv/ serves the same downloadable CSV template used by the in-app import wizard, for scripted use — see CSV import.

MethodPathAuthDescription
GET/api/v1/projects/{project_pk}/imports/Member+Recent imports for the project, newest first — who imported what, when, the outcome, and what the import did not carry over.

Page-number paginated ({count, next, previous, results}; page, page_size, default 50, max 200). Each row carries id, filename, status (pending / dispatched / done / dead), creates_project, requested_at, initiated_by (integer user id; removed in 0.5, see below), initiated_by_username (null once that user is deleted), task_count (null until the import worker writes its summary), and warnings.

Readable while the project is archived — it is a read-only provenance surface, so unlike most project routes it is not gated on IsProjectNotArchived.

Rows are purged after TRUEPPM_IMPORT_RETENTION_DAYS (default 7), so this is a recent-activity view rather than durable audit history. Full field semantics and the warning-marker contract are on MS Project import & export.