Sprints and estimation API

MethodPathDescription
POST/api/v1/projects/{id}/sprints/Create one sprint on the project

Team Member+ (IsProjectMemberWrite); capacity_points on the request body carries its own higher gate at Resource Manager+. List and retrieve (GET /api/v1/projects/{id}/sprints/, GET /api/v1/sprints/{id}/) are Viewer+. Destroy is Project Manager+ and only permitted while the sprint is still PLANNED.

MethodPathDescription
POST/api/v1/projects/{id}/sprints/generate/Lay out a whole run of sprints in one call — preview or commit

Stands up a series of iterations in one request instead of one POST /sprints/ per sprint. Team Member+ (the same gate as creating a single sprint); the optional first_sprint_capacity_points field additionally requires Resource Manager+, matching the field-level gate on capacity_points.

Request — describe the cadence either by parameters or by an explicit row list:

FieldTypeDescription
countintegerHow many iterations (1–52). Required unless sprints is given
start_datedateStart of the first iteration; snapped forward to a working day. Required unless sprints is given
length_daysintegerWorking days per iteration (2–30, default 10)
name_patternstringName template; must contain {n} (default Sprint {n})
first_indexintegerValue substituted for {n} in the first iteration (default 1)
dry_runbooleanCompute and return the cadence without writing anything (default false)
first_sprint_capacity_pointsinteger / nullStored on the first row of the cadence, and only when supplied and that row is one this call creates. Resource Manager+
sprintsarray{name, start_date, finish_date} rows — the edited preview posted back. Wins over count/start_date. Each row must span 120 days or fewer

Response — the same shape for a preview (200) and a commit (201):

{
"dry_run": false,
"sprints": [
{
"name": "Sprint 1",
"start_date": "2026-04-06",
"finish_date": "2026-04-17",
"working_days": 10,
"non_working_days_skipped": 4,
"status": "created",
"id": "…"
}
],
"created_count": 1,
"skipped_count": 0,
"capacity_hint": {
"points": 24,
"basis": "velocity_average",
"sprints_sampled": 3,
"note": "A starting point drawn from this team's own closed iterations — not a limit. The team decides what it commits to."
}
}

Four properties are guaranteed:

  • Calendar-aware. length_days counts working days against the project’s composed calendar — the same fold CPM and Monte Carlo use, including holiday overlays and the program/workspace inheritance chain. A shutdown inside a window pushes the finish date out rather than shrinking the iteration, and non_working_days_skipped reports every non-working day the window spans.
  • Preview writes nothing. dry_run: true returns the identical payload with id: null on every row and status: "new" on the rows that would be created (already-taken names still come back as "exists" — that is the point of the preview), so a client can render and edit it before committing.
  • Idempotent on name. A candidate whose name already belongs to a live sprint in the project comes back as status: "exists" and is never re-created or overwritten. Submitting twice yields one cadence.
  • Bounded. At most 52 iterations per call, each holding at most 30 working days (or, on the edited-row path, spanning at most 120 calendar days); a larger count or sprints list is a 400. There is no endpoint-specific rate limit beyond the account-wide default — aggregate bulk-write governance is tracked with the token-scope work.

capacity_hint is a suggestion, never a ceiling: generation does not write it anywhere by itself, and note is server-owned copy that clients render alongside the number. A 400 with a detail message is returned when the project’s calendar has no usable working day in range; that case carries code: "calendar_has_no_working_day" so a client can route the user to calendar settings rather than surfacing prose.

MethodPathDescription
POST/api/v1/sprints/{id}/promote-to-milestone/Bind the sprint’s commitment to a schedule milestone so sprint velocity forecasts a P50/P80 band around its CPM finish
POST/api/v1/sprints/{id}/unbind-milestone/Remove the binding between the sprint and its milestone

See Sprint–milestone rollup for the UI workflow and error codes.

MethodPathDescription
GET/api/v1/sprints/{id}/scope-changes/Audit list + delta of pending mid-sprint scope-injection requests
POST/api/v1/sprints/{id}/scope-changes/accept/ / /api/v1/scope-changes/{id}/accept/Accept a pending scope-injection request
POST/api/v1/sprints/{id}/scope-changes/reject/ / /api/v1/scope-changes/{id}/reject/Reject a pending scope-injection request

The mid-sprint scope-injection approve-gate (ADR-0102 §5) referenced from Sprints — a task added to an active sprint after it started lands here pending Scrum Master / Product Owner approval rather than silently joining the commitment.

MethodPathDescription
GET/api/v1/sprints/{id}/duration-events/Every duration change recorded against tasks in this sprint, newest first
GET/api/v1/tasks/{id}/duration-events/Duration-change history for one task, newest first

The audit behind the mid-sprint duration change (ADR-0151): when a task’s duration is edited, the effective percent-complete policy decides whether % is kept or prorated, and one event row records the before/after and the policy applied. Any project member (Viewer and up) may read both.

The two endpoints return different shapes — do not assume they match. The per-sprint aggregate exists so a sprint changes-log renders in one request instead of one per task, so it denormalizes task_name / actor_name and returns a single object:

{"events": [
{"id": "…", "task_id": "…", "task_name": "Design",
"old_duration": 10, "new_duration": 20,
"percent_complete_at_change": 50.0, "percent_complete_after": 25.0,
"policy_applied": "prorate", "actor_name": "Sarah Chen",
"created_at": "2026-04-03T09:12:00+00:00"}
]}

Note the timestamp offset form. This aggregate is assembled as plain values rather than through a serializer, so created_at is a raw ISO-8601 string with a numeric offset — the per-task endpoint below renders the same instant as …09:12:00Z. Parse both with an ISO-8601 parser rather than matching on the suffix.

percent_complete_after is null unless the policy actually changed % (that is, under prorate) — under keep and confirm it stays null, which is how a client distinguishes “the policy moved the number” from “the policy left it alone”. The events list is empty, never absent, for a sprint with no changes.

The per-task endpoint is paginated instead, returning {count, next, previous, results} where each result carries the raw task, actor, and sprint foreign keys plus a source enum.

MethodPathDescription
GET / POST/api/v1/sprints/{sprint_id}/poker/List live rounds / open a new round (facilitator)
POST/api/v1/poker/{id}/vote/Cast or change my vote
POST/api/v1/poker/{id}/reveal/Reveal votes (facilitator)
POST/api/v1/poker/{id}/reopen/Reopen for a re-vote (facilitator)
POST/api/v1/poker/{id}/commit/Commit the agreed points — writes Task.story_points (facilitator)
POST/api/v1/poker/{id}/cancel/Cancel the round (facilitator)

See Estimation poker.

MethodPathDescription
PATCH / DELETE/api/v1/retro-items/{id}/Edit or remove a retro board item
POST/api/v1/retro-items/{id}/convert-to-action/Convert a retro item into an action item

Complements the /api/v1/sprints/{id}/retro/ read/upsert endpoints and the action-item promote/pull-to-sprint routes documented in Retrospective — that page covers the retro as a whole; these two routes edit an individual board item once it exists.

/api/v1/velocity-suggestions/ (list, accept, dismiss) is fully documented in Velocity calibration.