Programs API
Programs
Section titled “Programs”A program is a container for related projects (see Programs).
| Method | Path | Description |
|---|---|---|
| GET | /api/v1/programs/ | List (scoped to your memberships) |
| POST | /api/v1/programs/ | Create (caller becomes Owner) |
| GET | /api/v1/programs/{id}/ | Retrieve |
| PUT / PATCH | /api/v1/programs/{id}/ | Update |
| DELETE | /api/v1/programs/{id}/ | Soft-delete |
| GET | /api/v1/programs/trash/ | List soft-deleted programs you were a member of. Every member sees the row; can_restore is true only for the Program Admin (Owner) |
| POST | /api/v1/programs/{id}/restore/ | Restore a soft-deleted program (Owner only). Re-attaches the projects it had when deleted, except any that were moved under another program in the meantime |
| GET | /api/v1/programs/{id}/projects/ | The program’s project roster — an unpaginated array of roster rows, not full project objects (see below). Any program member, Viewer included. Optional ?search= (project name or code) and ?ordering=name / -name; default order is start date, then name |
| GET | /api/v1/programs/samples/ | List the bundled samples available to the demo loader |
| POST | /api/v1/programs/load-sample/ | Load a bundled sample program (the in-app “Load demo data” action); body {"sample": "<key>"} |
| POST | /api/v1/programs/{id}/shift-sample-dates/ | Re-anchor a bundled sample’s dates to today (the in-app “Shift dates to today” action). No request body — the offset is always today - sample_anchor_date rounded to whole weeks, derived server-side. Owner only, and refused on a closed program. Idempotent: a sample already within a week of today returns 200 {"shifted": false}, not an error. 400 with code: not_a_sample for a real program, or code: no_anchor_recorded for a sample loaded before this shipped (reload it instead) |
| POST | /api/v1/programs/import/ | Import a JSON seed document as a new program (raw JSON body or multipart file upload); caller becomes Owner. Returns 202 Accepted — the program shell is created synchronously, the subtree is built by a worker. Optional replace / expected_program_id fields confirm a replacement; 409 without them |
| GET | /api/v1/programs/{id}/import/jobs/{job_id}/ | Poll one seed import job (Program Manager+). A job_id belonging to another program 404s |
| POST | /api/v1/programs/import/validate/ | Dry run — validate a JSON seed document and return every diagnostic, persisting nothing. Same request shapes and permissions as import/. An invalid document is 200 {"valid": false, "errors": [...]}, not a 400: the request succeeded, the document is what failed. Also echoes the schema version, program slug/name, project/task/resource counts the file claims, and a replaces object naming the program this import would replace (null when the slug is free), so you can confirm you grabbed the right file — and see what it would cost — before running the destructive import |
| GET | /api/v1/programs/{id}/export/ | Download the program as a canonical JSON seed file (Content-Disposition: attachment) |
| POST | /api/v1/programs/{id}/export/ | Start an asynchronous program bundle export; poll .../export/jobs/{job_id}/ and fetch .../export/jobs/{job_id}/download/. The project equivalents are under /api/v1/projects/{id}/export/. See Data export |
| GET | /api/v1/programs/{id}/rollup/ | The program’s rolled-up health and enabled KPIs, computed on read over the program’s own projects (any program member; see below) |
| GET | /api/v1/programs/{id}/rollup-config/ | Read the program rollup KPIs config (enabled KPIs + aggregation policy) |
| PATCH | /api/v1/programs/{id}/rollup-config/ | Update the program rollup KPIs config (Program Manager+) |
| GET | /api/v1/programs/{id}/risk-policy/ | Read the program risk & dependencies policy |
| PATCH | /api/v1/programs/{id}/risk-policy/ | Update the program risk & dependencies policy (Program Manager+) |
| POST | /api/v1/programs/bulk-fields/ | Bulk-set inherited settings (methodology, iteration label, risk policy) across multiple programs; body {"ids": [...], "fields": {...}} — only the named rows and fields change (Workspace Admin) |
| POST | /api/v1/programs/{id}/bulk-project-fields/ | Bulk-set inherited settings (methodology, iteration label) across this program’s projects; body {"ids": [...], "fields": {...}} (Program Manager+) |
| GET | /api/v1/programs/{id}/resource-contention/ | Within-program resource contention across member projects (Resource Manager+; optional ?start= / ?end= window, repeatable ?resource= / ?status=) |
| GET | /api/v1/programs/{id}/schedule/ | Program-true cross-project critical path — merges every member project’s tasks and every accepted cross-project dependency into one CPM run, computed on read. Tasks in projects you cannot read are redacted to a minimal card (title + forecast dates only); links are flagged cross-project (any program member) |
| POST | /api/v1/programs/{id}/split/ | Split a program into sub-programs — planned, not yet implemented (returns 501) |
Both write endpoints carry a 6/min per-account scoped limit (see
Rate limiting below).
The program rollup
Section titled “The program rollup”GET /api/v1/programs/{id}/rollup/ owns the program-level figures (ADR-1314):
the program health band and every KPI the program has enabled in
Rollup KPIs. It reads the program’s own
non-draft projects only, never another program.
{ "aggregation_policy": "worst", "policy_available": true, "policy_unavailable_reason": null, "project_count": 3, "program_health": "at_risk", "program_health_reason": null, "kpis": { "critical_tasks": {"available": true, "value": 4}, "baseline_variance": {"available": true, "unit": "calendar_days", "value": null, "reason": "no_baseline"}, "p80_completion": { "available": true, "unit": "date", "value": "2027-05-01", "as_of": "2026-11-04T09:12:00+00:00", "driver_project_id": "8c1e…", "projects_without_forecast": 1 } }, "as_of": "2026-11-07T14:03:11+00:00", "definitions": { "program_health": "Each contributing project's schedule performance band (the SPI proxy: completed planned work divided by work planned by today) combined under the program's aggregation policy, leaving out projects with nothing planned yet; unknown when none has. Not the project health band.", "critical_tasks": "Incomplete leaf tasks on the critical path, summed across the contributing projects.", "baseline_variance": "…", "p80_completion": "…" }}program_healthison_track,at_risk,critical, orunknown. It is the program’s project schedule performance bands (the SPI proxy) combined under the aggregation policy, the same value as theschedule_healthKPI, and not a rollup of the project health bands.unknowncomes with aprogram_health_reason:no_projectsorno_planned_work; otherwise the reason isnull.- Each
kpisentry is{"available": false, "reason": ...}when it cannot be shown to you (the cost KPIs below program and project manager), and otherwise carriesvalue. A value ofnull, orunknownfor a band, comes with areason:no_projects,no_planned_work,no_milestones,no_baseline,no_completed_work, orno_forecast. p80_completioncarries its ownas_of(the oldest forecast it read),driver_project_id, andprojects_without_forecast.
The sentences in definitions are listed on the
metric vocabulary page.
The program project roster is a narrow row
Section titled “The program project roster is a narrow row”GET /api/v1/programs/{id}/projects/ is gated on program membership, and the
lowest program role passes it. It therefore lists every non-draft project in the
program — including projects you hold no project membership on — and each row is
deliberately much narrower than a project object:
id name code program start_datemethodology effective_methodology inherited_methodologyiteration_label effective_iteration_labelhealth lifecycle is_archivedoverdue_count at_risk_countis_pinned my_role my_role_label can_author can_undo_batch_operationsThe row answers which projects are in this program, and how are they doing. It
carries nothing about how a project is configured or who runs it — no project lead,
no sharing or guest posture, no mcp_enabled consent state, no attachment policy, no
surface-visibility map. Those are project settings, and they are served by
GET /api/v1/projects/{id}/, which requires membership on that project.
The last five fields answer only about you: your role on the row’s project
(null when you hold none), whether you may author its plan or reverse a batch write
there, and whether you have pinned it. No field on this route reports another user’s
role, pin, or identity.
Seed import is asynchronous
Section titled “Seed import is asynchronous”POST /api/v1/programs/import/ returns 202 Accepted:
{ "queued": true, "program_id": "0f3a…", "import_request_id": "b71c…", "replaced_program_id": null}The program shell exists at program_id the moment this returns — validation,
the replace decision, the replacement itself, and the shell creation all happen
inside the request — so a client can navigate straight to it. Only the O(n)
subtree build (projects, tasks, sprints, dependencies) is queued. Poll:
GET /api/v1/programs/{program_id}/import/jobs/{import_request_id}/which returns { id, program, status, filename, replace, replaced_program_id, result_summary, error_detail, expires_at, created_at, started_at, completed_at }.
status is one of pending, running, success, failed. On success,
result_summary carries the entity counts { projects, tasks, sprints, dependencies }; on failure, error_detail carries the reason and the (empty)
program shell is deliberately left in place so you can see what happened and
retry or delete it. The poll endpoint requires Program Manager+, and a
job_id from another program 404s.
A malformed or oversized seed document still returns 400 synchronously —
validation runs before anything is queued. SEED_MAX_UPLOAD_MB is enforced on
both the multipart upload and the raw JSON body.
Replacing a program requires confirmation
Section titled “Replacing a program requires confirmation”A seed’s program.slug is persisted as Program.code. If a live program you
own already uses that code, the import refuses:
HTTP/1.1 409 Conflict{ "detail": "A program you own already uses the code \"atlas\". Re-importing moves its projects to Trash. Confirm to continue.", "code": "seed_replace_required", "conflict": { "program_id": "9c2d…", "name": "Atlas Platform Launch", "code": "atlas", "project_count": 3, "task_count": 214 }}Two optional request fields confirm it — sent as multipart form fields alongside
file, or as sibling keys on a JSON body:
| Field | Type | Default | Meaning |
|---|---|---|---|
replace | boolean | false | Authorizes replacing whatever collides |
expected_program_id | UUID | — | Compare-and-swap: must equal the program that would actually be replaced |
expected_program_id exists so a client acting on an earlier dry run cannot
destroy the wrong program if the collision moved in between; a mismatch is
refused with 409 and code: "seed_replace_mismatch", carrying the same
conflict object. Only programs on which you hold a live Owner membership
are ever candidates, which is why naming one back to you leaks nothing.
The replaced program’s projects move to project Trash, where each can be restored individually as a standalone project — the program shell itself is not recoverable, and a restored project does not return to it. Offline clients receive real deletion tombstones for the removed rows.
Loading a bundled sample is unchanged
Section titled “Loading a bundled sample is unchanged”POST /api/v1/programs/load-sample/ still runs synchronously and returns
201 Created with a {program, landing_project_id, sample_key} envelope —
landing_project_id is the project board to land a contributor on so their
assigned work is visible (null when the sample has no open sprint), and
sample_key echoes the loaded sample. Its payload is a server-curated bundled
fixture of at most a few hundred entities, so a call takes seconds; allow a
generous request timeout and do not poll it. Reloading a sample still deletes
the previous copy outright — demo data is disposable — and never replaces a
program containing a real, non-sample project. See
Sample projects.
The rollup-config and risk-policy endpoints use a method-level permission
split: GET is open to any program member (closed programs remain readable for
audit), while PATCH requires Program Manager or above and is blocked on closed programs.
Both are partial updates — send only the fields you want to change — and every
successful PATCH is audited automatically.
resource-contention returns each resource with their task spans across every
member project of the program, each span tagged with its source project, so the
client can surface people over-allocated across sibling projects in overlapping
windows. Overallocation detection is intentionally client-side. The window
defaults to the earliest span start and latest finish across member projects; it
returns 409 if no member project has a computed schedule yet, and 400 for an
invalid date or a start after end. This is within-program visibility only —
cross-program leveling and the portfolio heat map remain Enterprise.
Both resource-contention and the per-project resource-allocation cap how many
assignment rows one response carries. When the cap is reached the response sets
truncated: true and resource_count reports how many resources were in scope, so a
client can tell a complete roster from a cut one. The cut always falls on a resource
boundary: a resource is either returned with every one of its in-window spans or left
out entirely, never returned half-complete. That matters because overallocation is
detected client-side by summing a resource’s spans — a partial resource would report a
lower load than the real one, which is the one error a contention view must not make.
The cap is set clear of the supported project size — it is a backstop against a
pathological project, not a page size, and a project inside the documented envelope does
not reach it. If a response does come back truncated, narrow the window or pass
?resource= to see the resources it omitted.
resource-contention and the per-project resource-allocation share a response
shape but not a meaning for max_units: from 0.4 the per-project endpoint states
the resource’s capacity on that project (the roster’s units_override when one
is set), while resource-contention spans several projects at once and therefore
states the whole person — the resource’s catalog-wide max_units. A client that
joins the two must not compare one against the other.
Each task span in resource-contention (and the per-project
resource-allocation) windows and renders on scheduled_start
through early_finish — the task’s span — not early_start through
early_finish, the narrower remaining-work window early_start shrinks
toward as an in-progress task’s percent_complete rises (ADR-0752). early_start
is still returned for tasks CPM has not populated scheduled_start on yet, in
which case the client falls back to it.
Program split is a planned endpoint that validates the request payload and
the caller’s Program Admin role, then returns 501 Not Implemented with a detail
message and a tracking_issue number. The request contract it accepts is
{"splits": [{"name": str, "project_ids": [uuid]}, ...]}; the working
implementation is not yet available.
Program membership sync
Section titled “Program membership sync”| Method | Path | Description |
|---|---|---|
| GET | /api/v1/sync/user/programs/ | Pull-only delta sync for Program and ProgramMembership rows — every program the caller belongs to, plus every co-member’s membership row. No path parameter (scope is derived entirely from the caller’s own live memberships, so there is no per-user IDOR surface). Complements projects/{id}/sync/, which cannot reach the user-scoped program layer |
Program decision log
Section titled “Program decision log”The decisions a program is waiting on, and the ones it has made (see Program Decision Log). Viewer and up read; Team Member and up create and edit; Program Manager and up delete. A closed program refuses every write.
| Method | Path | Description |
|---|---|---|
| GET / POST | /api/v1/programs/{program_pk}/decisions/ | List / create. ?status=awaiting, made or withdrawn filters; awaiting sorts soonest-due first, made sorts most recently decided first |
| GET / PATCH / DELETE | /api/v1/programs/{program_pk}/decisions/{id}/ | Retrieve, edit or change status, or soft-delete one decision |
status moves awaiting → made | withdrawn and back to awaiting; made → withdrawn
is refused with 400. decided_at is read-only, stamped when status becomes made.
impact_note is the owner’s free text and is returned verbatim. owner,
linked_task and linked_risk must resolve inside the program (an id outside it
returns 400 “does not exist”), at most one of linked_task / linked_risk may be
set, and the writer must be a member of the linked item’s project. The read-only
link object carries title and short_id only when the reader is a member of
that project; otherwise both are null. short_id is the display reference
(T-10 for a task, R-003 for a risk), the same string the item’s own endpoint
returns as short_id_display. Decisions are not exposed to MCP read tokens
(#4774), and the program seed
export does not include them yet
(#4776).
Program backlog
Section titled “Program backlog”The program backlog is the intake pool for a program: ideas and requests live here until one is pulled into a specific project’s backlog as a task.
| Method | Path | Description |
|---|---|---|
| GET / POST | /api/v1/programs/{program_pk}/backlog-items/ | List / create (filters: ?item_type=, ?status=, repeatable ?tags=, fuzzy ?q=) |
| GET / PATCH / DELETE | /api/v1/programs/{program_pk}/backlog-items/{id}/ | Retrieve, edit, archive, or soft-delete one item |
| POST | /api/v1/programs/{program_pk}/backlog-items/{id}/pull/ | Pull a PROPOSED item into a project’s backlog |
pull takes the target project, not a backlog item:
{ "project_id": "9c2d0f7e-…" }It responds 201 with a two-key envelope — the task it created and the item
it transitioned, so a client needs no follow-up read:
{ "task": { … }, "backlog_item": { … } }The created task lands in the project backlog (status=BACKLOG, no sprint);
pull never assigns a sprint. ?status= defaults to PROPOSED on list, so the
default read is the active pool. The caller needs program-write and Team
Member+ on the target project — program authority alone cannot drop a task into
a project. A project_id outside this program returns 400; an item that is no
longer PROPOSED returns 409.